Entry  Sat May 31 22:54:29 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2719, 100000, 31.05.2008 22:34:38, 01.06.2008 01:49:30 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware

horizontal position ("target") = -2.75mm
this is MID position
Entry  Sat May 31 17:36:14 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2718, 100000, 31.05.2008 16:21:57, 31.05.2008 21:08:32 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware

- long break in the middle due to power outage after thunderstorm

horizontal position ("target") = +2.0mm - after we decided to scan the whole area in 3 steps
this is RIGHT position

all 3 positions are:
RIGHT: +2.00 mm    <--- this run
MID:   -2.75 mm
LEFT:  -7.50 mm
Entry  Sat May 31 17:32:35 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) , run2717, 6490, 31.05.2008 15:57:58, 31.05.2008 16:09:21 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware

trigger is now correct (9 x 9 mm2 window)
horizontal position ("target") = 0.0mm
Entry  Sat May 31 17:29:40 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2716, 20000, 31.05.2008 14:59:26, 31.05.2008 15:56:23 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: zero supressed, new firmware

in fact, trigger was set to coincidence of ALL FOUR scintillators, hence only (less than) 4 x 4 mm2 window !!!
horizontal position ("target") = 0.0mm
Entry  Fri May 30 19:42:13 2008, stephan hänsel, SiLC, APVDAQ only, run0001, 51803, 30.05.2008 19:38:04, 30.05.2008 22:54:59 
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12
no telescope

terminated after 51803 events due to beam drop out @ 22.00h
Entry  Tue Jun 3 11:03:27 2008, Thomas Bergauer, , telescope alignment run, run2830, 3897, 2008-06-03 10:52:16.783, 2008-06-03 10:58:52.790 beam_profile_with_modified_BEND4and7.pnghit_correlations.png
telescope run with reduced beam intensity (BEND4=-600A instead of -620A and BEND7=-605A instead of -615A)
Entry  Sun Jun 1 15:52:03 2008, Eudet Telescope, SiLC, Telescope Pedestal Run, run2738, 1247, 1.6.2008. 15:50, 1.6.2008. 15:58 
Telescope Pedestal Run
no DUTs!
no Beam!
Config File: test5boards.conf
Entry  Tue Jun 3 18:17:47 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup), run2838, 478159, 03.06.2008 18:38:07, 04.06.2008 10:41:51 
SiLC beam test - CERN SPS June 2008
HV=100V, xy "telescope"
8 modules, 40MHz, 6 samples, position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


this is a run where modules 0,2,4,6 are in normal position, while modules 1,3,5,7 are rotated by 90 deg
(counterclockwise as seen by the beam) and flipped (back<->forth) in order to achieve the minimum spacing
(~10.3mm) between "corresponding" x and y planes.
Entry  Tue Jun 3 16:53:20 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2837, 20000, 03.06.2008 16:49:40, 03.06.2008 17:26:49 drehteller_rot_00.gifdrehteller_rot.cdr
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 0 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask
Entry  Tue Jun 3 16:14:26 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2836, 10000, 03.06.2008 16:13:18, 03.06.2008 16:33:20 drehteller_rot_60.gif
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 60 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask

Please note that there are 8 modules read out in this run, but the last one (#7) is placed outside the beam and
hence does not provide any meaningful data.
Entry  Tue Jun 3 15:39:57 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2835, 10000, 03.06.2008 15:36:47, 03.06.2008 15:55:34 drehteller_rot_50.gif
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 50 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask
Entry  Tue Jun 3 14:59:14 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2834, 10000, 03.06.2008 14:56:32, 03.06.2008 15:15:37 drehteller_rot_40.gif
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 40 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask
Entry  Tue Jun 3 14:12:02 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2833, 10000, 03.06.2008 14:10:40, 03.06.2008 14:29:26 drehteller_rot_30.gif
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 30 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask
Entry  Tue Jun 3 13:28:15 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2832, 10000, 03.06.2008 13:24:07, 03.06.2008 13:53:18 drehteller_rot_20.gif
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 20 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask
Entry  Tue Jun 3 12:32:51 2008, Markus Friedl, SiLC, APVDAQ + telescope (0-sup) *** angle-scan ***, run2831, 10000, 03.06.2008 12:31:42, 03.06.2008 13:19:36 drehteller_rot_10.gif
SiLC beam test - CERN SPS June 2008
Angle scan,  HV=100V, alpha = 10 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware

Angle scan with pattern mask
Entry  Tue Jun 3 10:58:54 2008, Markus Friedl, BELLE, APVDAQ only, ped007, 10000, 03.06.2008 10:53:04, 03.06.2008 10:58:47 
SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
beam on (lower intensity)
Entry  Tue Jun 3 09:57:17 2008, Markus Friedl, BELLE, APVDAQ only, run0007, 105000, 03.06.2008 09:40:18, 03.06.2008 10:12:48 
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12
no telescope


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules

RETRY after software bugfix - apparently works
Entry  Tue Jun 3 09:27:27 2008, Markus Friedl, BELLE, APVDAQ only, run0006, 23929, 03.06.2008 09:26:16, 03.06.2008 09:34:22 
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules

RETRY

STUCK again after some time - now adding veto clear in error handling routine
Entry  Tue Jun 3 09:12:42 2008, Markus Friedl, BELLE, APVDAQ only, run0005, 45020, 03.06.2008 09:11:30, 03.06.2008 09:24:42 
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


Flex_Module has only 1 working APV - control bonds suffered during transportation

Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules

SAME AS PREVIOUS, BUT 0-SUP WITHOUT TELESCOPE


stuck after 45020 events with the repeated message  
 ***WARNING*** FIFO3 empty, FADC 0. Event discarded, reset sent.
to be investigated.
Entry  Tue Jun 3 02:38:21 2008, Markus Friedl, BELLE, APVDAQ + telescope (0-sup), run2829, 105000, 03.06.2008 02:29:51, 03.06.2008 09:08:58 
SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware


Flex_Module has only 1 working APV - control bonds suffered during transportation