20
|
Sat May 31 22:54:29 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) | run2719 | 100000 | 31.05.2008 22:34:38 | 01.06.2008 01:49:30 |
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=-2.75 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware
horizontal position ("target") = -2.75mm
this is MID position |
18
|
Sat May 31 17:36:14 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) | run2718 | 100000 | 31.05.2008 16:21:57 | 31.05.2008 21:08:32 |
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples, hor stage :=+2 mm
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware
- long break in the middle due to power outage after thunderstorm
horizontal position ("target") = +2.0mm - after we decided to scan the whole area in 3 steps
this is RIGHT position
all 3 positions are:
RIGHT: +2.00 mm <--- this run
MID: -2.75 mm
LEFT: -7.50 mm |
17
|
Sat May 31 17:32:35 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) | run2717 | 6490 | 31.05.2008 15:57:58 | 31.05.2008 16:09:21 |
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12 (now for real)
telescope: zero supressed, new firmware
trigger is now correct (9 x 9 mm2 window)
horizontal position ("target") = 0.0mm |
16
|
Sat May 31 17:29:40 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) | run2716 | 20000 | 31.05.2008 14:59:26 | 31.05.2008 15:56:23 |
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: zero supressed, new firmware
in fact, trigger was set to coincidence of ALL FOUR scintillators, hence only (less than) 4 x 4 mm2 window !!!
horizontal position ("target") = 0.0mm |
14
|
Fri May 30 19:42:13 2008 |
stephan hänsel | SiLC | APVDAQ only | run0001 | 51803 | 30.05.2008 19:38:04 | 30.05.2008 22:54:59 |
SiLC beam test - CERN SPS June 2008
8 modules, HV=100V, 40MHz, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12
no telescope
terminated after 51803 events due to beam drop out @ 22.00h |
57
|
Tue Jun 3 11:03:27 2008 |
Thomas Bergauer | | telescope alignment run | run2830 | 3897 | 2008-06-03 10:52:16.783 | 2008-06-03 10:58:52.790 |
telescope run with reduced beam intensity (BEND4=-600A instead of -620A and BEND7=-605A instead of -615A) |
Attachment 1: beam_profile_with_modified_BEND4and7.png
|
|
Attachment 2: hit_correlations.png
|
|
27
|
Sun Jun 1 15:52:03 2008 |
Eudet Telescope | SiLC | Telescope Pedestal Run | run2738 | 1247 | 1.6.2008. 15:50 | 1.6.2008. 15:58 |
Telescope Pedestal Run
no DUTs!
no Beam!
Config File: test5boards.conf |
66
|
Tue Jun 3 18:17:47 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) | run2838 | 478159 | 03.06.2008 18:38:07 | 04.06.2008 10:41:51 |
SiLC beam test - CERN SPS June 2008
HV=100V, xy "telescope"
8 modules, 40MHz, 6 samples, position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
this is a run where modules 0,2,4,6 are in normal position, while modules 1,3,5,7 are rotated by 90 deg
(counterclockwise as seen by the beam) and flipped (back<->forth) in order to achieve the minimum spacing
(~10.3mm) between "corresponding" x and y planes. |
65
|
Tue Jun 3 16:53:20 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** angle-scan *** | run2837 | 20000 | 03.06.2008 16:49:40 | 03.06.2008 17:26:49 |
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 0 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Angle scan with pattern mask |
Attachment 1: drehteller_rot_00.gif
|
|
Attachment 2: drehteller_rot.cdr
|
64
|
Tue Jun 3 16:14:26 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** angle-scan *** | run2836 | 10000 | 03.06.2008 16:13:18 | 03.06.2008 16:33:20 |
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 60 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Angle scan with pattern mask
Please note that there are 8 modules read out in this run, but the last one (#7) is placed outside the beam and
hence does not provide any meaningful data. |
Attachment 1: drehteller_rot_60.gif
|
|
63
|
Tue Jun 3 15:39:57 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** angle-scan *** | run2835 | 10000 | 03.06.2008 15:36:47 | 03.06.2008 15:55:34 |
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 50 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Angle scan with pattern mask |
Attachment 1: drehteller_rot_50.gif
|
|
62
|
Tue Jun 3 14:59:14 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** angle-scan *** | run2834 | 10000 | 03.06.2008 14:56:32 | 03.06.2008 15:15:37 |
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 40 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Angle scan with pattern mask |
Attachment 1: drehteller_rot_40.gif
|
|
61
|
Tue Jun 3 14:12:02 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** angle-scan *** | run2833 | 10000 | 03.06.2008 14:10:40 | 03.06.2008 14:29:26 |
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 30 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Angle scan with pattern mask |
Attachment 1: drehteller_rot_30.gif
|
|
60
|
Tue Jun 3 13:28:15 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** angle-scan *** | run2832 | 10000 | 03.06.2008 13:24:07 | 03.06.2008 13:53:18 |
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 20 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Angle scan with pattern mask |
Attachment 1: drehteller_rot_20.gif
|
|
58
|
Tue Jun 3 12:32:51 2008 |
Markus Friedl | SiLC | APVDAQ + telescope (0-sup) *** angle-scan *** | run2831 | 10000 | 03.06.2008 12:31:42 | 03.06.2008 13:19:36 |
SiLC beam test - CERN SPS June 2008
Angle scan, HV=100V, alpha = 10 degrees
8 modules, 40MHz, 6 samples, hor position centered
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Angle scan with pattern mask |
Attachment 1: drehteller_rot_10.gif
|
|
56
|
Tue Jun 3 10:58:54 2008 |
Markus Friedl | BELLE | APVDAQ only | ped007 | 10000 | 03.06.2008 10:53:04 | 03.06.2008 10:58:47 |
SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
beam on (lower intensity) |
55
|
Tue Jun 3 09:57:17 2008 |
Markus Friedl | BELLE | APVDAQ only | run0007 | 105000 | 03.06.2008 09:40:18 | 03.06.2008 10:12:48 |
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 2 -a 12
no telescope
Flex_Module has only 1 working APV - control bonds suffered during transportation
Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules
RETRY after software bugfix - apparently works |
54
|
Tue Jun 3 09:27:27 2008 |
Markus Friedl | BELLE | APVDAQ only | run0006 | 23929 | 03.06.2008 09:26:16 | 03.06.2008 09:34:22 |
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Flex_Module has only 1 working APV - control bonds suffered during transportation
Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules
RETRY
STUCK again after some time - now adding veto clear in error handling routine |
53
|
Tue Jun 3 09:12:42 2008 |
Markus Friedl | BELLE | APVDAQ only | run0005 | 45020 | 03.06.2008 09:11:30 | 03.06.2008 09:24:42 |
SiLC beam test - CERN SPS June 2008 - HIT MODE
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Flex_Module has only 1 working APV - control bonds suffered during transportation
Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules
SAME AS PREVIOUS, BUT 0-SUP WITHOUT TELESCOPE
stuck after 45020 events with the repeated message
***WARNING*** FIFO3 empty, FADC 0. Event discarded, reset sent.
to be investigated. |
52
|
Tue Jun 3 02:38:21 2008 |
Markus Friedl | BELLE | APVDAQ + telescope (0-sup) | run2829 | 105000 | 03.06.2008 02:29:51 | 03.06.2008 09:08:58 |
SiLC beam test - CERN SPS June 2008
4 Belle modules, 40MHz, HV=80V, 6 samples
trigger: 9 mm opening, TLUControl.exe -d 10 -a 12
telescope: 0sup., new firmware
Flex_Module has only 1 working APV - control bonds suffered during transportation
Position is approximately similar to KEK Nov 2007, however it appears like JP_module is flipped (up-down) w.r.t.
to other modules |