Data was good, we have to shuft the setup in x direction and slightly down. Enter room request 17:12.
just to check if the beam was there
axis 1: 13
axis 2: 17
angle = 0
x/y=-39/-30
PreTriggerWindow 640ns and PostTriggerWindow 85n
axis 2: 14
x/y=-39/-18
axis 2: 11
last files of hades81 are already for the next run, forgot to copy xml to 81.
x/y=-39/-21
37 no ramon
axis 2: 8
x/y=-39/-24
axis 2: 5
x/y=-39/-27
axis 2: 2
48Mb/s Events and 2Mb/s rejected
PreTriggerWindow 640ns and PostTriggerWindow 85ns
troubles till 02:48 (dogma powercycle)
axis 2: -1
30Mb/s Events and 300kb/s rejected
axis 2: -4
Problems with the source -> no beam
Beam started at 1:50
30Mb/s Events and 1Mb/s rejected