Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025  Not logged in ELOG logo
Message ID: 280     Entry time: Sun Dec 7 02:33:26 2025
Author: RD50 Generic User 
Subject: RW3 slab 
Run Number: 34 
DUT: TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon 
Beam Energy: 124.4 MeV/u 
Rate Setting: Low Flux High 
Particle Type: Helium 
Data: Good 
t-Start: 2:34 
t-Stop: 2:58 
Duration_min:  
Frontend:  
Phantom: RW3 
Phantom thickness: 0.5cm 

48Mb/s Events and 2Mb/s rejected

PreTriggerWindow 640ns and PostTriggerWindow 85ns

troubles till 02:48 (dogma powercycle)

ELOG V3.1.5-fc6679b