Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024 testbeam-MA2025
  Testbeams at MedAustron in 2025, Page 19 of 19  Not logged in ELOG logo
Entry  Sat Dec 13 14:18:49 2025, elog_producer, energy calibration, 17, Sandwich-iCT setup(GSI)+RaMon, 63.3 MeV/u, Low Flux High, Helium, Good, 13.12.2025 14:02:30, 13.12.2025 14:19:14, 16, Normal, None,  ramon.conf
automatic log for run 17
Comment:
calibration run 63.3 MeV
Entry  Sat Aug 16 23:44:00 2025, Maximilian Babeluk, CASTID - Summary, , TJ-Monopix2, 800 MeV, , Proton, , , , , , ,  
Summary for the CASTID shift RO Aug 16, 2025

We measured four TJ-Monopix2 DUTS with HV/HVC frontends using AIDA mode in a stacked telescope configuration. We used 800MeV protons at low flux
Entry  Sat Dec 6 20:15:47 2025, Felix Ulrich-Pur, systemtest carbon, 17, TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon, , , Carbon, Good, 20:16, 20:29, 13, , None,  
400.1MeV, Degrader 10
ELOG V3.1.5-fc6679b