ID Date Author Subject Run Number DUT Beam Energy Rate Settingdown Particle Type Data t-Start t-Stop Duration_min Frontend Phantom Phantom thickness Text Attachments
  348   Sat Dec 13 14:18:49 2025 elog_producerenergy calibration17Sandwich-iCT setup(GSI)+RaMon63.3 MeV/uLow Flux HighHeliumGood13.12.2025 14:02:3013.12.2025 14:19:1416NormalNone automatic log for run 17
Comment:
calibration run 63.3 MeV
 ramon.conf 
  197   Sat Aug 16 23:44:00 2025 Maximilian BabelukCASTID - Summary TJ-Monopix2800 MeV Proton       Summary for the CASTID shift RO Aug 16,
2025
  
  263   Sat Dec 6 20:15:47 2025 Felix Ulrich-Pursystemtest carbon17TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon  CarbonGood20:1620:2913 None 400.1MeV, Degrader 10   