ID |
Date |
Author |
Subject |
Run Number |
DUT |
Beam Energy |
Rate Setting |
Particle Type |
Data |
t-Start |
t-Stop |
Duration_min |
Frontend |
Phantom |
Phantom thickness |
168
|
Sat Dec 14 13:46:11 2024 |
Felix Ulrich-Pur | WET measurement slabs | 29 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 13:34 | 14:03 | 29 | | Plastic Water Slabs | 1cm |
1cm Plastic Water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000 (changed threshold)
Diamond: 900mA, threshold 1000 offset
DOGMA lost DiRICH after restarting Wave (happened several times) |
169
|
Sat Dec 14 13:49:20 2024 |
Felix Ulrich-Pur | WET measurement slabs | 30 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 147.2 MeV/u | Low Flux High | Helium | Good | 14:02 | 14:45 | 43 | | Plastic Water Slabs | 1cm |
1cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
4MHz Ramon 500 kHz TRB |
170
|
Sat Dec 14 13:56:16 2024 |
Felix Ulrich-Pur | WET measurement slabs | 31 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 14:48 | 15:06 | 18 | | Plastic Water Slabs | 2cm |
2cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
4MHz Ramon 1.4MHz TRB |
171
|
Sat Dec 14 15:09:34 2024 |
Felix Ulrich-Pur | WET measurement slabs | 32 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 147.2 MeV/u | Low Flux High | Helium | Good | 15:06 | 15:19 | 13 | | Plastic Water Slabs | 2cm |
2cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
|
172
|
Sat Dec 14 15:10:35 2024 |
Felix Ulrich-Pur | WET measurement slabs | 33 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 15:24 | 15:36 | 12 | | Plastic Water Slabs | 3cm |
3cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
3-4MHz Ramon 600 kHz TRB |
173
|
Sat Dec 14 15:12:01 2024 |
Felix Ulrich-Pur | WET measurement slabs | 34 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 147.2 MeV/u | Low Flux High | Helium | Good | 15:37 | 15:48 | 11 | | Plastic Water Slabs | 3cm |
3cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
3MHz Ramon 300 kHz TRB |
174
|
Sat Dec 14 15:12:46 2024 |
Felix Ulrich-Pur | WET measurement slabs | 35 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 15:53 | 16:10 | 17 | | Plastic Water Slabs | 4cm |
4cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
4MHz Ramon 600 kHz TRB |
175
|
Sat Dec 14 15:15:04 2024 |
Felix Ulrich-Pur | WET measurement slabs | 36 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 147.2 MeV/u | Low Flux High | Helium | Good | 16:11 | 16:23 | 12 | | Plastic Water Slabs | 4cm |
4cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
3MHz Ramon 300 kHz TRB |
176
|
Sat Dec 14 15:15:46 2024 |
Felix Ulrich-Pur | WET measurement slabs | 37 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 16:28 | 16:42 | 12 | | Plastic Water Slabs | 5cm |
5cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
3-5MHz Ramon 500 kHz TRB |
177
|
Sat Dec 14 15:17:10 2024 |
Felix Ulrich-Pur | WET measurement slabs | 38 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 147.2 MeV/u | Low Flux High | Helium | Good | 16:42 | 16:55 | 13 | | Plastic Water Slabs | 5cm |
5cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
2.5MHz Ramon 200 kHz TRB |
178
|
Sat Dec 14 15:17:57 2024 |
Felix Ulrich-Pur | WET measurement slabs | 39 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 17:00 | 17:14 | 13 | | Dense Bone Slabs | 1cm |
1cm dense bone
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
4MHz Ramon 700 kHz TRB |
179
|
Sat Dec 14 15:18:48 2024 |
Felix Ulrich-Pur | WET measurement slabs | 40 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 147.2 MeV/u | Low Flux High | Helium | Good | 17:14 | 17:28 | 14 | | Dense Bone Slabs | 1cm |
1cm dense bone
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
3.5MHz Ramon 400 kHz TRB |
180
|
Sat Dec 14 15:19:57 2024 |
Felix Ulrich-Pur | WET measurement slabs | 41 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 17:32 | 17:44 | 12 | | Dense Bone Slabs | 2cm |
2cm dense bone
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
4MHz Ramon 600 kHz TRB |
181
|
Sat Dec 14 15:20:52 2024 |
Felix Ulrich-Pur | WET measurement slabs | 42 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 147.2 MeV/u | Low Flux High | Helium | Good | 17:48 | 18:00 | 12 | | Dense Bone Slabs | 2cm |
2cm dense bone
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
2.5MHz Ramon 250 kHz TRB |
182
|
Sat Dec 14 15:21:44 2024 |
Felix Ulrich-Pur | WET measurement slabs | 43 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 18:04 | 18:18 | 14 | | Dense Bone Slabs | 3cm |
3cm dense bone
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
4MHz Ramon 1MHz TRB |
183
|
Sat Dec 14 15:23:21 2024 |
Felix Ulrich-Pur | WET measurement slabs | 44 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 147.2 MeV/u | Low Flux High | Helium | Good | 18:19 | 18:33 | 14 | | Dense Bone Slabs | 2cm |
3cm dense bone
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
4MHz Ramon 200kHz TRB |
184
|
Sat Dec 14 15:24:22 2024 |
Felix Ulrich-Pur | WET measurement slabs | 45 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 18:37 | 18:51 | 14 | | Dense Bone Slabs | 4cm |
4cm dense bone
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
3MHz Ramon 800kHz TRB |
185
|
Sat Dec 14 15:25:12 2024 |
Felix Ulrich-Pur | WET measurement slabs | 46 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 147.2 MeV/u | Low Flux High | Helium | Good | 18:55 | 19:11 | 16 | | Dense Bone Slabs | 4cm |
4cm dense bone
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
2MHz Ramon 120kHz TRB |
186
|
Sat Dec 14 15:26:18 2024 |
Felix Ulrich-Pur | WET measurement slabs | 47 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 19:16 | 19:29 | 13 | | Dense Bone Slabs | 5cm |
5cm dense bone
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
3MHz Ramon 300kHz TRB |
187
|
Sat Dec 14 15:27:08 2024 |
Felix Ulrich-Pur | WET measurement slabs | 48 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 147.2 MeV/u | Low Flux High | Helium | Good | 19:30 | 19:50 | 20 | | Dense Bone Slabs | 5cm |
5cm dense bone
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
1.5MHz Ramon
Wave crashes if 1 TDC disappears in dog d, DABC is still running |