ID |
Date |
Author |
Subject |
Run Number |
DUT |
Beam Energy |
Rate Setting |
Particle Type |
Data |
t-Start |
t-Stop |
Duration_min |
Frontend |
Phantom |
Phantom thickness |
166
|
Sat Dec 14 13:42:52 2024 |
Felix Ulrich-Pur | threshold and preamp tests | 27 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 63.3 MeV/u | Low Flux High | Helium | Good | 12:52 | 13:16 | 24 | | | |
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000 (changed threshold)
Diamond: 900mA, threshold 50 |
167
|
Sat Dec 14 13:45:34 2024 |
Felix Ulrich-Pur | threshold and preamp tests | 28 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 63.3 MeV/u | Low Flux High | Helium | Good | 13:20 | 13:32 | 2 | | | |
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000 (changed threshold)
Diamond: 900mA, threshold 1000 offset |
80
|
Sat Jun 8 21:41:04 2024 |
Felix Ulrich-Pur | TOF CAL HADES LGADs Calibrationcurve | 9 | TOF-Cal GSI | 62.4 MeV | Low Flux High | Proton | Good | 20:55 | 21:21 | | | | |
changed back to high due to beamsize vs LGAD size factor
650 khz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 230kHz on LGAD
TOF Calibration Curve |
137
|
Sun Aug 25 12:51:10 2024 |
tb-crew | only base | 71 | RD50-MPW4 | 62.4 MeV | Low Flux Very Low | Proton | Unknown | 25.08.2024 12:40:41 | 25.08.2024 12:51:37 | 10 | Normal | | |
automatic log for run 71
Comment:
E-scan |
138
|
Sun Aug 25 13:04:26 2024 |
tb-crew | only base | | RD50-MPW4 | 62.4 MeV | Low Flux Very Low | Proton | Unknown | | | | Normal | | |
End of (promising) shift |
218
|
Sat Dec 14 15:50:19 2024 |
Felix Ulrich-Pur | LGAD+Diamond test with clinical carbon beam | 80 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 402MeV/u | | Carbon | Good | 05:15 | 05:50 | 35 | | | |
Carbon Deg10 (clinical rate)
TRB Setup: 260V bias and 250mA pre-amps, threshold 5000
Diamond: 900mA, threshold 1000 offset |
72
|
Sat Jun 8 19:53:47 2024 |
Felix Ulrich-Pur | TOF CAL HADES LGADs Test High Rate | 1 | TOF-Cal GSI | 252.7 MeV | Low Flux High | Proton | Good | 16:00 | 16:18 | | | | |
7.5 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 2.5 MHz on LGAD |
73
|
Sat Jun 8 19:56:37 2024 |
Felix Ulrich-Pur | TOF CAL HADES LGADs Calibrationcurve | 2 | TOF-Cal GSI | 252.7 MeV | Low Flux Medium | Proton | Good | 16:29 | 16:47 | | | | |
1 Mhz on Ramon (after 5 Layers of Silicon and close to second iso centre) and 350kHz on LGAD
TOF Calibration Curve |
133
|
Sun Aug 25 11:35:21 2024 |
tb-crew | only base | 67 | RD50-MPW4 | 252.7 MeV | Low Flux Very Low | Proton | Unknown | 25.08.2024 11:35:33 | 25.08.2024 11:35:48 | 0 | Normal | | |
automatic log for run 67
Comment:
E-scan |
134
|
Sun Aug 25 12:00:00 2024 |
tb-crew | only base | 68 | RD50-MPW4 | 252.7 MeV | Low Flux Very Low | Proton | Unknown | 25.08.2024 11:37:41 | 25.08.2024 12:00:27 | 22 | Normal | | |
automatic log for run 68
Comment:
E-scan |
140
|
Fri Dec 13 11:48:21 2024 |
Felix Ulrich-Pur | Shift 23.11.24 low flux He test with RaMon | 1 | RaMon | 205.2 MeV/u | Low Flux Medium | Helium | Good | 06:28 | 06:30 | 2 | | | |
Mean rate per spill~ 4-6E5 p/s (online estimation without proper analysis) |
147
|
Sat Dec 14 12:56:05 2024 |
Felix Ulrich-Pur | Shift 23.11.24 low flux He test with RaMon | 8 | RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 06:39 | 06:40 | 1 | | | |
Mean rate per spill~ 5e6 p/s (online estimation without proper analysis) |
156
|
Sat Dec 14 13:07:15 2024 |
Felix Ulrich-Pur | Energy vs TOF calibration | 17 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux Medium | Helium | Good | 08:46 | 09:42 | 56 | | | |
before run, setups had to be aligned (first slab in slabholder was put in isocentre. However, in this run, no slab was used). Room was closed at 08:10
Beam->Nozzle-> Slabholder->TOF-CAL (TRB)-> DOGMA Setup(Diamond+LGADs)-> RaMon
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
measured 400kHz with Ramon and only 100kHz with LGADs (third LGAD) and 60kHz accepted trrigger rate
beam was shifted vertically by x? cm? (need to lookup again). So TRB setup was shifted with motors such that the He beam was hitting the centre of the LGADs |
157
|
Sat Dec 14 13:16:33 2024 |
Felix Ulrich-Pur | Energy vs TOF calibration +Alignment of DOGMA setup | 18 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux Medium | Helium | Good | 09:42 | 09:48 | 6 | | | |
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
DOGMA setup had to be shifted manually to align it with the beam |
168
|
Sat Dec 14 13:46:11 2024 |
Felix Ulrich-Pur | WET measurement slabs | 29 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 13:34 | 14:03 | 29 | | Plastic Water Slabs | 1cm |
1cm Plastic Water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000 (changed threshold)
Diamond: 900mA, threshold 1000 offset
DOGMA lost DiRICH after restarting Wave (happened several times) |
170
|
Sat Dec 14 13:56:16 2024 |
Felix Ulrich-Pur | WET measurement slabs | 31 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 14:48 | 15:06 | 18 | | Plastic Water Slabs | 2cm |
2cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
4MHz Ramon 1.4MHz TRB |
172
|
Sat Dec 14 15:10:35 2024 |
Felix Ulrich-Pur | WET measurement slabs | 33 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 15:24 | 15:36 | 12 | | Plastic Water Slabs | 3cm |
3cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
3-4MHz Ramon 600 kHz TRB |
174
|
Sat Dec 14 15:12:46 2024 |
Felix Ulrich-Pur | WET measurement slabs | 35 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 15:53 | 16:10 | 17 | | Plastic Water Slabs | 4cm |
4cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
4MHz Ramon 600 kHz TRB |
176
|
Sat Dec 14 15:15:46 2024 |
Felix Ulrich-Pur | WET measurement slabs | 37 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 16:28 | 16:42 | 12 | | Plastic Water Slabs | 5cm |
5cm plastic water
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
3-5MHz Ramon 500 kHz TRB |
178
|
Sat Dec 14 15:17:57 2024 |
Felix Ulrich-Pur | WET measurement slabs | 39 | TOF-Cal GSI (TRB)+DOGMA setup(diamond+LGAD)+RaMon | 205.2 MeV/u | Low Flux High | Helium | Good | 17:00 | 17:14 | 13 | | Dense Bone Slabs | 1cm |
1cm dense bone
TRB Setup: 260V bias and 250mA pre-amps, threshold 1000
Diamond: 900mA, threshold 1000 offset
4MHz Ramon 700 kHz TRB |