Entry  Sun Feb 19 02:08:34 2023, BP_PS, INFO, , common, 800, 5kHz, Proton, , Unknown, , , ,  
TH change again before run 27, new TH= 1.1
Entry  Thu Apr 27 15:40:07 2023, Felix Ulrich-Pur, low flux p800 recommissioning, 001, , 800, 2kHz, Proton, , Good, , , ,  

Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front of the RaMon scintillators (5x5cm^2)
Rates slightly lower due to additional material in front of RaMon.

Entry  Thu Apr 27 15:42:25 2023, Felix Ulrich-Pur, low flux p800 recommissioning, 002, , 800, 5kHz, Proton, , Good, , , ,  

Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front of the RaMon scintillators (5x5cm^2)
rate slightly lower due to additional material in front
 

Entry  Thu Apr 27 15:43:21 2023, Felix Ulrich-Pur, low flux p800 recommissioning, 003, , 800, 200kHz, Proton, , Good, , , ,  

Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front of the RaMon scintillators (5x5cm^2)
rate slightly lower due to additional material in front
 

Entry  Thu Apr 27 15:43:48 2023, Felix Ulrich-Pur, low flux p800 recommissioning, 004, , 800, 1.2MHz, Proton, , Good, , , ,  

Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front of the RaMon scintillators (5x5cm^2)
rate slightly lower due to additional material in front
 

Entry  Thu Apr 27 15:44:37 2023, Felix Ulrich-Pur, low flux p800 recommissioning, 005, , 800, 1.2MHz, Proton, , Good, , , ,  

Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front of the RaMon scintillators (5x5cm^2)
rate slightly lower due to additional material in front
higher voltage in PMTs (no significant change in rate)

Entry  Thu Apr 27 15:45:23 2023, Felix Ulrich-Pur, LGAD beam telescope calibration, 007, , 800, 200kHz, Proton, , Good, , , ,  

22.04.23 trigger on second LGAD (run 006 is missing since cable of pre-amps was loose and 3rd sensor signal was lost)

Entry  Thu Apr 27 15:47:05 2023, Felix Ulrich-Pur, LGAD beam telescope calibration, 008, , 800, 200kHz, Proton, , Good, , , ,  

22.04.23 23:20 trigger on third LGAD

beam spot was off. telescope was shifted

Entry  Thu Apr 27 15:48:29 2023, Felix Ulrich-Pur, LGAD beam telescope calibration, 009, , 83, Low Flux Medium, Proton, , Good, , , ,  

22.04.23 23:35 trigger on third LGAD

no DUT

Entry  Thu Apr 27 15:49:27 2023, Felix Ulrich-Pur, LGAD beam telescope calibration, 010, , 252.7, Low Flux Medium, Proton, , Good, , , ,  

22.04.23 23:58 trigger on third LGAD

no DUT

beam was down between 00:05 and 00:15

Entry  Thu Apr 27 15:49:58 2023, Felix Ulrich-Pur, LGAD beam telescope calibration, 011, , 145.4, Low Flux Medium, Proton, , Good, , , ,  

23.04.23 00:17 trigger on third LGAD

no DUT

Entry  Thu Apr 27 15:50:55 2023, Felix Ulrich-Pur, LGAD beam telescope calibration, 012, , 100.4, Low Flux Medium, Proton, , Good, , , ,  

23.04.23 00:35 trigger on third LGAD

no DUT

Entry  Thu Apr 27 15:51:18 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 013, , 100.4, Low Flux Medium, Proton, , Good, , , ,  

23.04.23 01:09 trigger on third LGAD

6 PMMA slabs (~1cm)

Entry  Thu Apr 27 15:52:02 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 014, , 83, Low Flux Medium, Proton, , Good, , , ,  

23.04.23 01:26 trigger on third LGAD

6 PMMA slabs (~1cm)

Entry  Thu Apr 27 15:52:25 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 015, , 100.4, Low Flux Medium, Proton, , Good, , , ,  

23.04.23 01:47 trigger on third LGAD

3 PMMA slabs (~0.5cm)

 

01:53 fail accelerator

Entry  Thu Apr 27 15:53:11 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 016, , 83, Low Flux Medium, Proton, , Good, , , ,  

23.04.23 02:07 trigger on third LGAD

3 PMMA slabs (~0.5cm)

Entry  Thu Apr 27 15:53:54 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 017, , 100.4, Low Flux Medium, Proton, , Good, , , ,  

23.04.23 02:28 trigger on third LGAD

9 PMMA slabs (~1.5cm)

Entry  Thu Apr 27 15:54:15 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 018, , 83, Low Flux Medium, Proton, , Good, , , ,  

23.04.23 02:43 trigger on third LGAD

9 PMMA slabs (~1.5cm)

Entry  Thu Apr 27 15:55:35 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 019, , 100.4, Low Flux Medium, Proton, , Good, , , ,  

23.04.23 03:05 trigger on third LGAD

12 PMMA slabs (~2cm)

Entry  Thu Apr 27 15:56:18 2023, Felix Ulrich-Pur, sandwich TOF-iCT calibration, 020, , 83, Low Flux Medium, Proton, , Good, , , ,  

23.04.23 03:19 trigger on third LGAD

12 PMMA slabs (~2cm)