Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front of the RaMon scintillators (5x5cm^2)
rate slightly lower due to additional material in front
higher voltage in PMTs (no significant change in rate) |