Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  Testbeams at MedAustron in 2023  Not logged in ELOG logo
Message ID: 55     Entry time: Thu Apr 27 15:40:07 2023
Author: Felix Ulrich-Pur 
Subject: low flux p800 recommissioning 
Run Number: 001 
DUT:  
Beam Energy: 800 
Rate Setting: 2kHz 
Particle Type: Proton 
Events:  
Data: Good 
t-Start:  
t-Stop:  
Duration_min:  
Frontend:  

Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front of the RaMon scintillators (5x5cm^2)
Rates slightly lower due to additional material in front of RaMon.

ELOG V3.1.5-fc6679b