Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front of the RaMon scintillators (5x5cm^2) Rates slightly lower due to additional material in front of RaMon.
Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front of the RaMon scintillators (5x5cm^2) rate slightly lower due to additional material in front
Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front of the RaMon scintillators (5x5cm^2) rate slightly lower due to additional material in front higher voltage in PMTs (no significant change in rate)
22.04.23 trigger on second LGAD (run 006 is missing since cable of pre-amps was loose and 3rd sensor signal was lost)
22.04.23 23:20 trigger on third LGAD
beam spot was off. telescope was shifted
22.04.23 23:35 trigger on third LGAD
no DUT
22.04.23 23:58 trigger on third LGAD
beam was down between 00:05 and 00:15
23.04.23 00:17 trigger on third LGAD
23.04.23 00:35 trigger on third LGAD
23.04.23 01:09 trigger on third LGAD
6 PMMA slabs (~1cm)
23.04.23 01:26 trigger on third LGAD