23.04.23 10:38 trigger on third LGAD
20 PMMA slabs
23.04.23 10:53 trigger on third LGAD
23.04.23 11:13 trigger on third LGAD
19 PMMA slabs
23.04.23 11:43 trigger on third LGAD
run 33 is missing as accelerator failed
23.04.23 12:03 trigger on third LGAD
17 PMMA slabs
Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front of the RaMon scintillators (5x5cm^2) Rates slightly lower due to additional material in front of RaMon.
Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front of the RaMon scintillators (5x5cm^2) rate slightly lower due to additional material in front
Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front of the RaMon scintillators (5x5cm^2) rate slightly lower due to additional material in front higher voltage in PMTs (no significant change in rate)