Home
CMS Production
Clean room
MedAustron
HEPHY
testbeams
old
testbeam-MA2018
testbeam-MA2019
testbeam-MA2020
testbeam-MA2021
testbeam-MA2023
testbeam-MA2024
Testbeams at MedAustron in 2023, Page 10 of 11
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- DUT --
common
DSSD-Tracker
RD50-MPW3
TJ-Monopix2
-- Beam Energy --
800
252.7
145.4
100.4
83
62.4
194.3
Noise
175.3MeV
175.3
218 Entries
Goto page
Previous
1
,
2
,
3
...
9
, 10,
11
Next
All
ID
Date
Author
Subject
Run Number
DUT
Beam Energy
Rate Setting
Particle Type
Events
Data
t-Start
t-Stop
Duration_min
Frontend
Text
4
Sat Feb 18 22:17:31 2023
Bernhard Pilsl
Attention RUN NUMBER
Due to bug in Elog-RC entries here for
the shift on 18.02.2023 are bigger (+1) than
the one stored in the data file names
55
Thu Apr 27 15:40:07 2023
Felix Ulrich-Pur
low flux p800 recommissioning
001
800
2kHz
Proton
Good
Measurement with RaMon 22.04.23 (not placed
in isocentre) LGAD beam telescope was placed
in front. LGADs were moved out of the beam.
56
Thu Apr 27 15:42:25 2023
Felix Ulrich-Pur
low flux p800 recommissioning
002
800
5kHz
Proton
Good
Measurement with RaMon 22.04.23 (not placed
in isocentre) LGAD beam telescope was placed
in front. LGADs were moved out of the beam.
57
Thu Apr 27 15:43:21 2023
Felix Ulrich-Pur
low flux p800 recommissioning
003
800
200kHz
Proton
Good
Measurement with RaMon 22.04.23 (not placed
in isocentre) LGAD beam telescope was placed
in front. LGADs were moved out of the beam.
58
Thu Apr 27 15:43:48 2023
Felix Ulrich-Pur
low flux p800 recommissioning
004
800
1.2MHz
Proton
Good
Measurement with RaMon 22.04.23 (not placed
in isocentre) LGAD beam telescope was placed
in front. LGADs were moved out of the beam.
59
Thu Apr 27 15:44:37 2023
Felix Ulrich-Pur
low flux p800 recommissioning
005
800
1.2MHz
Proton
Good
Measurement with RaMon 22.04.23 (not placed
in isocentre) LGAD beam telescope was placed
in front. LGADs were moved out of the beam.
60
Thu Apr 27 15:45:23 2023
Felix Ulrich-Pur
LGAD beam telescope calibration
007
800
200kHz
Proton
Good
22.04.23 trigger on second LGAD (run 006
is missing since cable of pre-amps was loose
and 3rd sensor signal was lost)
61
Thu Apr 27 15:47:05 2023
Felix Ulrich-Pur
LGAD beam telescope calibration
008
800
200kHz
Proton
Good
22.04.23 23:20 trigger on third LGAD
beam spot was off. telescope was
shifted
62
Thu Apr 27 15:48:29 2023
Felix Ulrich-Pur
LGAD beam telescope calibration
009
83
Low Flux Medium
Proton
Good
22.04.23 23:35 trigger on third LGAD
no DUT
63
Thu Apr 27 15:49:27 2023
Felix Ulrich-Pur
LGAD beam telescope calibration
010
252.7
Low Flux Medium
Proton
Good
22.04.23 23:58 trigger on third LGAD
no DUT
beam was down between 00:05 and
64
Thu Apr 27 15:49:58 2023
Felix Ulrich-Pur
LGAD beam telescope calibration
011
145.4
Low Flux Medium
Proton
Good
23.04.23 00:17 trigger on third LGAD
no DUT
65
Thu Apr 27 15:50:55 2023
Felix Ulrich-Pur
LGAD beam telescope calibration
012
100.4
Low Flux Medium
Proton
Good
23.04.23 00:35 trigger on third LGAD
no DUT
66
Thu Apr 27 15:51:18 2023
Felix Ulrich-Pur
sandwich TOF-iCT calibration
013
100.4
Low Flux Medium
Proton
Good
23.04.23 01:09 trigger on third LGAD
6 PMMA slabs (~1cm)
67
Thu Apr 27 15:52:02 2023
Felix Ulrich-Pur
sandwich TOF-iCT calibration
014
83
Low Flux Medium
Proton
Good
23.04.23 01:26 trigger on third LGAD
6 PMMA slabs (~1cm)
68
Thu Apr 27 15:52:25 2023
Felix Ulrich-Pur
sandwich TOF-iCT calibration
015
100.4
Low Flux Medium
Proton
Good
23.04.23 01:47 trigger on third LGAD
3 PMMA slabs (~0.5cm)
69
Thu Apr 27 15:53:11 2023
Felix Ulrich-Pur
sandwich TOF-iCT calibration
016
83
Low Flux Medium
Proton
Good
23.04.23 02:07 trigger on third LGAD
3 PMMA slabs (~0.5cm)
70
Thu Apr 27 15:53:54 2023
Felix Ulrich-Pur
sandwich TOF-iCT calibration
017
100.4
Low Flux Medium
Proton
Good
23.04.23 02:28 trigger on third LGAD
9 PMMA slabs (~1.5cm)
71
Thu Apr 27 15:54:15 2023
Felix Ulrich-Pur
sandwich TOF-iCT calibration
018
83
Low Flux Medium
Proton
Good
23.04.23 02:43 trigger on third LGAD
9 PMMA slabs (~1.5cm)
72
Thu Apr 27 15:55:35 2023
Felix Ulrich-Pur
sandwich TOF-iCT calibration
019
100.4
Low Flux Medium
Proton
Good
23.04.23 03:05 trigger on third LGAD
12 PMMA slabs (~2cm)
73
Thu Apr 27 15:56:18 2023
Felix Ulrich-Pur
sandwich TOF-iCT calibration
020
83
Low Flux Medium
Proton
Good
23.04.23 03:19 trigger on third LGAD
12 PMMA slabs (~2cm)
Goto page
Previous
1
,
2
,
3
...
9
, 10,
11
Next
All
ELOG V3.1.5-fc6679b