Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  Testbeams at MedAustron in 2023, Page 10 of 11  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Thu Apr 27 15:49:27 2023, Felix Ulrich-Pur, LGAD beam telescope calibration, 010, , 252.7, Low Flux Medium, Proton, , Good, , , ,  
22.04.23 23:58 trigger on third LGAD

no DUT

beam was down between 00:05 and 00:15
Entry  Thu Apr 27 15:48:29 2023, Felix Ulrich-Pur, LGAD beam telescope calibration, 009, , 83, Low Flux Medium, Proton, , Good, , , ,  
22.04.23 23:35 trigger on third LGAD

no DUT
Entry  Thu Apr 27 15:47:05 2023, Felix Ulrich-Pur, LGAD beam telescope calibration, 008, , 800, 200kHz, Proton, , Good, , , ,  
22.04.23 23:20 trigger on third LGAD

beam spot was off. telescope was shifted
Entry  Thu Apr 27 15:45:23 2023, Felix Ulrich-Pur, LGAD beam telescope calibration, 007, , 800, 200kHz, Proton, , Good, , , ,  
22.04.23 trigger on second LGAD (run 006 is missing since cable of pre-amps was loose and 3rd sensor signal was lost)
Entry  Thu Apr 27 15:44:37 2023, Felix Ulrich-Pur, low flux p800 recommissioning, 005, , 800, 1.2MHz, Proton, , Good, , , ,  
Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front
of the RaMon scintillators (5x5cm^2)
rate slightly lower due to additional material in front
Entry  Thu Apr 27 15:43:48 2023, Felix Ulrich-Pur, low flux p800 recommissioning, 004, , 800, 1.2MHz, Proton, , Good, , , ,  
Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front
of the RaMon scintillators (5x5cm^2)
rate slightly lower due to additional material in front
Entry  Thu Apr 27 15:43:21 2023, Felix Ulrich-Pur, low flux p800 recommissioning, 003, , 800, 200kHz, Proton, , Good, , , ,  
Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front
of the RaMon scintillators (5x5cm^2)
rate slightly lower due to additional material in front
Entry  Thu Apr 27 15:42:25 2023, Felix Ulrich-Pur, low flux p800 recommissioning, 002, , 800, 5kHz, Proton, , Good, , , ,  
Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front
of the RaMon scintillators (5x5cm^2)
rate slightly lower due to additional material in front
Entry  Thu Apr 27 15:40:07 2023, Felix Ulrich-Pur, low flux p800 recommissioning, 001, , 800, 2kHz, Proton, , Good, , , ,  
Measurement with RaMon 22.04.23 (not placed in isocentre) LGAD beam telescope was placed in front. LGADs were moved out of the beam. 4x PCB was in front
of the RaMon scintillators (5x5cm^2)
Rates slightly lower due to additional material in front of RaMon.
Entry  Sat Feb 18 14:48:36 2023, Bernhard Pilsl, MPW3 Kalibration / Config Files, , , , , , , , , , ,  trimdacs_maus_230218config.cfgmatrix_maus_230218
Initial config files for the RD50_MPW3 Peary device
Entry  Sat Feb 18 22:17:31 2023, Bernhard Pilsl, Attention RUN NUMBER, , , , , , , , , , ,  
Due to bug in Elog-RC entries here for the shift on 18.02.2023 are bigger (+1) than the one stored in the data file names
eg run 9999 ( in name of *.raw files) is listed as 10000 in here
Entry  Sat Feb 18 22:18:39 2023, BP_PS, Beam, , common, 800, 5kHz, Proton, , Unknown, , , ,  
Status 22:19, waiting for beam, vakuum Problem in der Quelle
Entry  Sat Feb 18 22:26:47 2023, BP_PS, Beam, , common, 800, 5kHz, Proton, , Unknown, , , ,  
Status: Beam bekommen um 22:23
Entry  Sat Feb 18 22:37:45 2023, BP_PS, INFO, , common, 800, 5kHz, Proton, , Unknown, , , ,  
z positions: 
DSSD1: 0mm
DSSD2: 48mm
Entry  Sat Feb 18 23:58:44 2023, BP_PS, INFO, , common, 800, 5kHz, Proton, , Unknown, , , ,  
Moved DUT 4mm before run 9
Entry  Sun Feb 19 02:05:04 2023, BP_PS, INFO, , common, 800, 5kHz, Proton, , Unknown, , , ,  
change TH before run 26, chip was getting noisy to 1,15V
Before it was at 1,08
Entry  Sun Feb 19 02:08:34 2023, BP_PS, INFO, , common, 800, 5kHz, Proton, , Unknown, , , ,  
TH change again before run 27, new TH= 1.1
Entry  Sat May 6 08:09:15 2023, cibp, 1st tests, , RD50-MPW3, 800, 200kHz, Proton, , Unknown, , , , Normal 
changed MPX2 trigger veto from 625us -> 100us veto length
Entry  Sat May 6 09:02:17 2023, cibp, 1st tests, , RD50-MPW3, 800, 200kHz, Proton, , Unknown, , , , Normal 
moved whole setup by ~2mm in x
Entry  Sat May 6 09:04:46 2023, cibp, 1st tests, , RD50-MPW3, 800, 200kHz, Proton, , Unknown, , , , Normal 
apperently wrong direction, adjusting again
moved 2mm (from origin) in other direction
ELOG V3.1.5-fc6679b