290
|
Sun Nov 7 19:06:26 2021 |
Felix Ulrich-Pur | Peakfinder WET meas 7.11.21 | 18 | | 175.3 | nominal | | | Good | | | 10 | | | | none | |
Start: 10:30
WET measurement of PMMA slabs also used for TOF-CT (GSI)
3cm PMMA
"Accumalte Charge"
PMMA was activated. Had to wait ~10-15min after measurement |
291
|
Sun Nov 7 19:06:40 2021 |
Felix Ulrich-Pur | Peakfinder WET meas 7.11.21 | 19 | | 175.3 | nominal | | | Good | | | 10 | | | | none | |
Start: 11:00
WET measurement of PMMA slabs also used for TOF-CT (GSI)
4cm PMMA
"Accumalte Charge"
PMMA was activated. Had to wait ~10-15min after measurement |
292
|
Sun Nov 7 19:06:58 2021 |
Felix Ulrich-Pur | Peakfinder WET meas 7.11.21 | 20 | | 175.3 | nominal | | | Good | | | 10 | | | | none | |
Start: 11:24
WET measurement of PMMA slabs also used for TOF-CT (GSI)
5cm PMMA
"Accumalte Charge"
PMMA was activated. Had to wait ~10-15min after measurement |
293
|
Sun Nov 7 19:07:31 2021 |
Felix Ulrich-Pur | Peakfinder WET meas 7.11.21 | 21 | | 194.3 | nominal | | | Good | | | 10 | | | | none | |
Start: 11:44
WET measurement of PMMA slabs also used for TOF-CT (GSI)
5cm PMMA. higher energy for Felix Feichtinger
"Accumalte Charge"
coarse run |
294
|
Sun Nov 7 19:08:47 2021 |
Felix Ulrich-Pur | Peakfinder WET meas 7.11.21 | 22 | | 194.3 | nominal | | | Good | | | 10 | | | | none | |
Start: 12:00
WET measurement of PMMA slabs also used for TOF-CT (GSI)
5cm PMMA. higher energy for Felix Feichtinger
"Accumalte Charge"
more detailed measurement |
23
|
Sun Jan 10 07:18:16 2021 |
Maximilian Tomaschek | Lowflux recommissioning | 26 | Ramon+Tracker | | | | 30 spills | Good | | | | | | | | |
Spotsize test, nach power cycle |
24
|
Sun Jan 10 07:19:03 2021 |
Maximilian Tomaschek | Lowflux recommissioning | 27 | Ramon+Tracker | | | | 30 spills | Good | | | | | | | | |
Spotsize test, nach power cycle |
28
|
Sun Jan 10 07:23:25 2021 |
Maximilian Tomaschek | Lowflux recommissioning | 32 | Ramon+Tracker | 145.4 | | | 10 spills 1e6 events | Good | 10% | | | 10 | | | | |
Spotsize |
76
|
Sat Feb 27 09:26:27 2021 |
Felix Ulrich-Pur | Rate verification | 1 | SiC+Si+RaMon | 62.4 | III(EFE+SID2) | | | Unknown | | | | | | | | |
Start 06:37
rate looks okish. few emtpy spills
2021-02-27, 06:07:
channel 1 : Si upstream
channel 2: SiC downstream
400 V Bias
Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.112V channel 1, 0-Level: 2.315V channel 1
position:
x: 0
y: 0
2021-02-27, 06:30:
Referenz: 2.477V channel 1
channel 2 unverändert
2021-02-27, 06:37:
Setting: 3
Run 1: 6:37 62.4 MeV, Rate geringer als erwartet
|
77
|
Sat Feb 27 09:28:07 2021 |
Felix Ulrich-Pur | Rate verification | 2 | SiC+Si+RaMon | 252.7 | III(EFE+SID2) | | | Crap | | | | | | | | |
Start 06:47
rate only 10Hz, stopped run, room request and rewired trigger.
NOTE: Problem was caused by operators: Optics were not set correctly after ramping up energy from 62.4 to 252.7, not trigger cable
channel 1 : Si upstream
channel 2: SiC downstream
400 V Bias
Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1
position:
x: 0
y: 0 |
78
|
Sat Feb 27 09:29:41 2021 |
Felix Ulrich-Pur | Rate verification | 4 | SiC+Si+RaMon | 252.7 | III(EFE+SID2) | | | Good | | | | | | | | |
Start 06:55
reallocated correctly, rate looks similar to old measurements now (kHz ish)
channel 1 : Si upstream
channel 2: SiC downstream
400 V Bias
Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1
position:
x: 0
y: 0 |
79
|
Sat Feb 27 09:30:32 2021 |
Felix Ulrich-Pur | Rate verification | 5 | SiC+Si+RaMon | 62.4 | III(EFE+SID2) | | | Good | | | | | | | | |
Start 07:03
verified if run 1 was reliable-->Same results
channel 1 : Si upstream
channel 2: SiC downstream
400 V Bias
Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1
position:
x: 0
y: 0 |
80
|
Sat Feb 27 09:31:57 2021 |
Felix Ulrich-Pur | Rate verification | 6 | SiC+Si+RaMon | 252.7 | I(EFE+SID0) | | | Good | | | | | | | | |
Start 07:16
rate looks fine,
channel 1 : Si upstream
channel 2: SiC downstream
400 V Bias
Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1
position:
x: 0
y: 0
SiC: man sieht erstmals Signale |
81
|
Sat Feb 27 09:40:15 2021 |
Felix Ulrich-Pur | Rate verification | 7 | SiC+Si+RaMon | 62.4 | I(EFE+SID0) | | | Good | | | | | | | | |
Start 07:40
rate looks fine, however operators mentioned, that CPD data might have been loaded incorrectly-->pause during run and reloaded (07:48), rate seems unchanged
channel 1 : Si upstream
channel 2: SiC downstream
400 V Bias
Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1
position:
x: 0
y: 0
|
82
|
Sat Feb 27 09:41:06 2021 |
Felix Ulrich-Pur | Waveforms SiC+Si | 8 | SiC+Si+RaMon | 252.7 | I(EFE+SID0) | | | Good | | | | | | | | |
08:34 room request, PC for SiC had to be restarted, trigger were connected as prior to shift
Start 08:53
rate looks fine
channel 1 : Si upstream
channel 2: SiC downstream
400 V Bias
Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1
verändere Position, ab 7:49 bei Aufnahme von Waveforms Position:
x = 0
y = 0
7:51 verändere Position
7:58 neue Position:
x = 8
y = 68
FPGA shutdown --> Datenaufzeichnung bis etwa 8:27, ab dann Suchen des Fehlers
|
83
|
Sat Feb 27 09:42:44 2021 |
Felix Ulrich-Pur | Waveforms SiC+Si | 9 | SiC+Si+RaMon | 145.4 | I(EFE+SID0) | | | Good | | | | | | | | |
Start 09:37
SiC setrup had to be rewired (wr0ng polarity somewhere (insert here))
Umstellen:
channel 2: LVDS-Signal vertauschen
channel 2 Referenz: 2.100 V
channel 1 : Si upstream
channel 2: SiC downstream
400 V Bias
Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1
position:
x = 8
y = 68 |
84
|
Sat Feb 27 18:36:15 2021 |
Felix Ulrich-Pur | Waveforms SiC+Si | 10 | SiC+Si+RaMon | 145.4 | I(EFE+SID0) | | | Good | | | | | | | | |
Start 10:10
polarity now correct
Wiederholung von vorher, aber keine Aufnahme von neuen Waveforms
channel 1 : Si upstream
channel 2: SiC downstream
400 V Bias
Referenz: 2.100 V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1
position:
x = 8
y = 68 |
85
|
Sat Feb 27 18:38:09 2021 |
Felix Ulrich-Pur | Waveforms SiC+Si | 11 | SiC+Si+RaMon | 62.4 | I(EFE+SID0) | | | Good | | | | | | | | |
Start 10:24
polarity now correct
no signal in sic --> energy too low due to scintis
channel 1 : Si upstream
channel 2: SiC downstream
400 V Bias
Referenz: 2.100 V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1
position:
x = 8
y = 68 |
86
|
Sat Feb 27 18:38:54 2021 |
Felix Ulrich-Pur | Waveforms SiC+Si | 12 | SiC+Si+RaMon | 252.7 | I(EFE+SID0) | | | Good | | | | | | | | |
Start 10:28
polarity now correct
now signal in SiC
channel 1 : Si upstream
channel 2: SiC downstream
400 V Bias
Referenz: 2.100 V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1
position:
x = 8
y = 68 |
87
|
Sat Feb 27 18:42:13 2021 |
Felix Ulrich-Pur | Waveforms SiC+Si | 13 | SiC+Si+RaMon | 252.7 | III(EFE+SID2) | | | Good | | | | | | | | |
Start 10:38
no signal in SiC
channel 1 : Si upstream
channel 2: SiC downstream
400 V Bias
Referenz: 2.100 V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1
position:
x = 8
y = 68 |