Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2021  Not logged in ELOG logo
Message ID: 81     Entry time: Sat Feb 27 09:40:15 2021
Author: Felix Ulrich-Pur 
Subject: Rate verification 
Run Number:
DUT: SiC+Si+RaMon 
Beam Energy: 62.4 
Rate Setting: I(EFE+SID0) 
Particle Type:  
Events:  
Data: Good 
Beam Betatron:  
Beam Chopper:  
Beam Degrader:  
Beam EFE:  
Beam Orb:  
Beam QuadScan:  
PhantomType:  
PhantomAngle:  

Start 07:40
rate looks fine, however operators mentioned, that CPD data might have been loaded incorrectly-->pause during run and reloaded (07:48), rate seems unchanged

 

channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1

position:

x: 0
y: 0 
 

ELOG V3.1.5-fc6679b