Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2021, Page 6 of 18  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sun Nov 7 19:06:26 2021, Felix Ulrich-Pur, Peakfinder WET meas 7.11.21, 18, , 175.3, nominal, , , Good, , , 10, , , , none,  

Start: 10:30
WET measurement of PMMA slabs also used for TOF-CT (GSI)

3cm PMMA
"Accumalte Charge"

PMMA was activated. Had to wait ~10-15min after measurement

Entry  Sun Nov 7 19:06:40 2021, Felix Ulrich-Pur, Peakfinder WET meas 7.11.21, 19, , 175.3, nominal, , , Good, , , 10, , , , none,  

Start: 11:00
WET measurement of PMMA slabs also used for TOF-CT (GSI)

4cm PMMA
"Accumalte Charge"

PMMA was activated. Had to wait ~10-15min after measurement

Entry  Sun Nov 7 19:06:58 2021, Felix Ulrich-Pur, Peakfinder WET meas 7.11.21, 20, , 175.3, nominal, , , Good, , , 10, , , , none,  

Start: 11:24
WET measurement of PMMA slabs also used for TOF-CT (GSI)

5cm PMMA
"Accumalte Charge"

PMMA was activated. Had to wait ~10-15min after measurement

Entry  Sun Nov 7 19:07:31 2021, Felix Ulrich-Pur, Peakfinder WET meas 7.11.21, 21, , 194.3, nominal, , , Good, , , 10, , , , none,  

Start: 11:44
WET measurement of PMMA slabs also used for TOF-CT (GSI)

5cm PMMA. higher energy for Felix Feichtinger
"Accumalte Charge"

coarse run

Entry  Sun Nov 7 19:08:47 2021, Felix Ulrich-Pur, Peakfinder WET meas 7.11.21, 22, , 194.3, nominal, , , Good, , , 10, , , , none,  

Start: 12:00
WET measurement of PMMA slabs also used for TOF-CT (GSI)

5cm PMMA. higher energy for Felix Feichtinger
"Accumalte Charge"

more detailed measurement

Entry  Sun Jan 10 07:18:16 2021, Maximilian Tomaschek, Lowflux recommissioning, 26, Ramon+Tracker, , , , 30 spills, Good, , , , , , , ,  

Spotsize test, nach power cycle

Entry  Sun Jan 10 07:19:03 2021, Maximilian Tomaschek, Lowflux recommissioning, 27, Ramon+Tracker, , , , 30 spills, Good, , , , , , , ,  

Spotsize test, nach power cycle

Entry  Sun Jan 10 07:23:25 2021, Maximilian Tomaschek, Lowflux recommissioning, 32, Ramon+Tracker, 145.4, , , 10 spills 1e6 events, Good, 10%, , , 10, , , ,  

Spotsize

Entry  Sat Feb 27 09:26:27 2021, Felix Ulrich-Pur, Rate verification, 1, SiC+Si+RaMon, 62.4, III(EFE+SID2), , , Unknown, , , , , , , ,  

Start 06:37
rate looks okish. few emtpy spills

 

2021-02-27, 06:07:

channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.112V channel 1, 0-Level: 2.315V channel 1

position:

x: 0
y: 0 

2021-02-27, 06:30:

Referenz: 2.477V channel 1
channel 2 unverändert
 

2021-02-27, 06:37:

Setting: 3 

Run 1: 6:37 62.4 MeV, Rate geringer als erwartet 

 

Entry  Sat Feb 27 09:28:07 2021, Felix Ulrich-Pur, Rate verification, 2, SiC+Si+RaMon, 252.7, III(EFE+SID2), , , Crap, , , , , , , ,  

Start 06:47
rate only 10Hz, stopped run, room request and rewired trigger.

NOTE: Problem was caused by operators: Optics were not set correctly after ramping up energy from 62.4 to 252.7, not trigger cable

 

channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1

position:

x: 0
y: 0 

Entry  Sat Feb 27 09:29:41 2021, Felix Ulrich-Pur, Rate verification, 4, SiC+Si+RaMon, 252.7, III(EFE+SID2), , , Good, , , , , , , ,  

Start 06:55
reallocated correctly, rate looks similar to old measurements now (kHz ish)

 

channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1

position:

x: 0
y: 0 

Entry  Sat Feb 27 09:30:32 2021, Felix Ulrich-Pur, Rate verification, 5, SiC+Si+RaMon, 62.4, III(EFE+SID2), , , Good, , , , , , , ,  

Start 07:03
verified if run 1 was reliable-->Same results

 

channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1

position:

x: 0
y: 0 

Entry  Sat Feb 27 09:31:57 2021, Felix Ulrich-Pur, Rate verification, 6, SiC+Si+RaMon, 252.7, I(EFE+SID0), , , Good, , , , , , , ,  

Start 07:16
rate looks fine,

channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1

position:

x: 0
y: 0 

SiC: man sieht erstmals Signale 

Entry  Sat Feb 27 09:40:15 2021, Felix Ulrich-Pur, Rate verification, 7, SiC+Si+RaMon, 62.4, I(EFE+SID0), , , Good, , , , , , , ,  

Start 07:40
rate looks fine, however operators mentioned, that CPD data might have been loaded incorrectly-->pause during run and reloaded (07:48), rate seems unchanged

 

channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1

position:

x: 0
y: 0 
 

Entry  Sat Feb 27 09:41:06 2021, Felix Ulrich-Pur, Waveforms SiC+Si, 8, SiC+Si+RaMon, 252.7, I(EFE+SID0), , , Good, , , , , , , ,  

08:34 room request, PC for SiC had to be restarted, trigger were connected as prior to shift

Start 08:53
rate looks fine

channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1

verändere Position, ab 7:49 bei Aufnahme von Waveforms Position:

x = 0
y = 0

7:51 verändere Position

7:58 neue Position:
x = 8
y = 68

 

FPGA shutdown --> Datenaufzeichnung bis etwa 8:27, ab dann Suchen des Fehlers

 

Entry  Sat Feb 27 09:42:44 2021, Felix Ulrich-Pur, Waveforms SiC+Si, 9, SiC+Si+RaMon, 145.4, I(EFE+SID0), , , Good, , , , , , , ,  

Start 09:37

SiC setrup had to be rewired (wr0ng polarity somewhere (insert here))

 

Umstellen:
channel 2: LVDS-Signal vertauschen
channel 2 Referenz: 2.100 V 

channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.475V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1

position:

x = 8
y = 68

Entry  Sat Feb 27 18:36:15 2021, Felix Ulrich-Pur, Waveforms SiC+Si, 10, SiC+Si+RaMon, 145.4, I(EFE+SID0), , , Good, , , , , , , ,  

Start 10:10
polarity now correct

Wiederholung von vorher, aber keine Aufnahme von neuen Waveforms

channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.100 V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1

position:

x = 8
y = 68

Entry  Sat Feb 27 18:38:09 2021, Felix Ulrich-Pur, Waveforms SiC+Si, 11, SiC+Si+RaMon, 62.4, I(EFE+SID0), , , Good, , , , , , , ,  

Start 10:24
polarity now correct
no signal in sic --> energy too low due to scintis

channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.100 V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1

position:

x = 8
y = 68

Entry  Sat Feb 27 18:38:54 2021, Felix Ulrich-Pur, Waveforms SiC+Si, 12, SiC+Si+RaMon, 252.7, I(EFE+SID0), , , Good, , , , , , , ,  

Start 10:28
polarity now correct

now signal in SiC

channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.100 V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1

position:

x = 8
y = 68

Entry  Sat Feb 27 18:42:13 2021, Felix Ulrich-Pur, Waveforms SiC+Si, 13, SiC+Si+RaMon, 252.7, III(EFE+SID2), , , Good, , , , , , , ,  

Start 10:38
no signal in SiC

channel 1 : Si upstream
channel 2: SiC downstream

400 V Bias

Referenz: 2.100 V channel 2, 0-Level: 2.310V channel 2
Referenz: 2.477V channel 1, 0-Level: 2.315V channel 1

position:

x = 8
y = 68

ELOG V3.1.5-fc6679b