Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2021, Page 12 of 18  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subject Run Number DUT Beam Energy Rate Setting Particle Type Events Data Beam Betatron Beam Chopper Beam Degrader Beam EFE Beam Orbdown Beam QuadScan PhantomType PhantomAngle
  221   Wed May 12 08:52:05 2021 Felix Ulrich-PurPMMA 0deg9Drehtisch145.4II(BETA+EFE)Proton Good      PMMA0

TB 24.4.21

0deg (1cm PMMA)

timing was adjusted and FADC had to be restarted

  222   Wed May 12 08:53:15 2021 Felix Ulrich-PurPMMA 90deg10Drehtisch145.4II(BETA+EFE)Proton Good      PMMA90

TB 24.4.21

90deg (0.2-1cm PMMA)

  223   Wed May 12 08:53:46 2021 Felix Ulrich-PurPMMA 90deg11Drehtisch100.4II(BETA+EFE)Proton Good      PMMA90

TB 24.4.21

90deg (0.2-1cm PMMA)

  224   Wed May 12 08:54:54 2021 Felix Ulrich-PurPMMA 0deg12Drehtisch100.4II(BETA+EFE)Proton Good      PMMA0

TB 24.4.21

0deg (1cm PMMA)

  225   Wed May 12 08:56:02 2021 Felix Ulrich-PurABS 0deg13Drehtisch145.4II(BETA+EFE)Proton Good      ABS0

TB 24.4.21

0deg (1cm ABS)

  226   Wed May 12 08:56:37 2021 Felix Ulrich-PurABS 0deg fluence loss15Drehtisch145.4II(BETA+EFE)Proton Good      ABS0

TB 24.4.21

corrected trigger position for fluence loss radiography

0deg (1cm ABS)

  227   Sun Jun 20 19:26:54 2021 Felix Ulrich-PurHADES testrun 800MeV1HADES-LGADs800VIIProton Good      none0

TB 19.6.21

Start 06:00
startet with wrong setting at the beginning (6 instead of 5) rate was then corrected, but RaMon was still running.

Final rate: 100kHz setting
07:24: room request: changed channel on board (was not connected to osci)

  228   Sun Jun 20 19:30:28 2021 Felix Ulrich-PurHADES testrun 100.4MeV2HADES-LGADs100.4II(BETA+EFE)Proton Good      none0

TB 19.6.21

Start 07:51
beam was paused at 10:10

bias run and threshold optimization

mean rate was O(100kHz)

  229   Sun Jun 20 19:33:06 2021 Felix Ulrich-PurHADES testrun with increased rate 100.4MeV3HADES-LGADs100.4I(EFE+SID0)Proton Good      none0

TB 19.6.21

Start 11:21
paused beam at 13:36
15:40-16:20 ECR source fail--downtime

Mean rate O(MHz)

  230   Sun Jun 20 19:34:59 2021 Felix Ulrich-PurHADES energy run4HADES-LGADs252.7I(EFE+SID0)Proton Good      none0

TB 19.6.21

Start 17:13

Mean rate O(MHz)
 

  231   Sun Jun 20 19:35:46 2021 Felix Ulrich-PurHADES energy run5HADES-LGADs194.3I(EFE+SID0)Proton Good      none0

TB 19.6.21

Start 17:42
Mean rate O(MHz)
 

  232   Sun Jun 20 19:37:09 2021 Felix Ulrich-PurHADES energy run6HADES-LGADs145.4I(EFE+SID0)Proton Good      none0

TB 19.6.21

Start 18:15
Mean rate O(MHz)
 

  233   Sun Jun 20 19:37:37 2021 Felix Ulrich-PurHADES energy run7HADES-LGADs83I(EFE+SID0)Proton Good      none0

TB 19.6.21

Start 18:48
Mean rate O(MHz)
 

  234   Sun Jun 20 19:37:58 2021 Felix Ulrich-PurHADES energy run8HADES-LGADs62.4I(EFE+SID0)Proton Good      none0

TB 19.6.21

Start 19:16
Mean rate O(MHz)
 

  235   Sun Jun 20 19:38:28 2021 Felix Ulrich-PurHADES increased rate run (wrong setting9HADES-LGADs800VIIProton Good  20   none0

TB 19.6.21

Start 19:43
rate setting was not set correctly deg20 in combination with setting VII instead of nominal flux deg10
 

  236   Sun Jun 20 19:40:12 2021 Felix Ulrich-PurHADES increased rate 10HADES-LGADs800nominalProton Good  10   none0

TB 19.6.21

Start 21:50

Nominal flux degrader 10: mean rate O(200MHz)
 

  237   Sun Jun 20 19:50:11 2021 Felix Ulrich-PurHADES sandwich TOF11HADES-LGADs+PMMAslabs100.4I(EFE+SID0)Proton Good      PMMA0

TB 20.6.21

Start 15:00 (late handover and copying of data)
5cm Phantom thickness
Mean rate O(MHz)

signal in last 2 LGADs too high (only 52MeV residual energy after 5cm)
 

  238   Sun Jun 20 19:54:37 2021 Felix Ulrich-PurHADES sandwich TOF11HADES-LGADs+PMMAslabs100.4I(EFE+SID0)Proton Good      PMMA0

TB 20.6.21

Start 15:55
5cm Phantom thickness
Mean rate O(MHz)
gain in last 2 layers was adapted
RamonRun 11 was not stopped (beam was still on from previous run)
for live TOF estimation: TDC3,channel 9 - TDC2,channel9
 

  239   Sun Jun 20 19:55:47 2021 Felix Ulrich-PurHADES sandwich TOF reference run12HADES-LGADs100.4I(EFE+SID0)Proton Good      none0

TB 20.6.21

Start 16:46
0cm Phantom thickness
Mean rate O(MHz)
reference run without phantom
for live TOF estimation: TDC3,channel 9 - TDC2,channel9
 

  240   Sun Jun 20 19:58:31 2021 Felix Ulrich-PurHADES sandwich TOF13HADES-LGADs+PMMAslabs100.4I(EFE+SID0)Proton Good      PMMA0

TB 20.6.21

Start 17:27
3cm Phantom thickness
Mean rate O(MHz)
for live TOF estimation: TDC3,channel 9 - TDC2,channel9
 

ELOG V3.1.5-fc6679b