Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2021  Not logged in ELOG logo
Message ID: 237     Entry time: Sun Jun 20 19:50:11 2021
Author: Felix Ulrich-Pur 
Subject: HADES sandwich TOF 
Run Number: 11 
DUT: HADES-LGADs+PMMAslabs 
Beam Energy: 100.4 
Rate Setting: I(EFE+SID0) 
Particle Type: Proton 
Events:  
Data: Good 
Beam Betatron:  
Beam Chopper:  
Beam Degrader:  
Beam EFE:  
Beam Orb:  
Beam QuadScan:  
PhantomType: PMMA 
PhantomAngle:

TB 20.6.21

Start 15:00 (late handover and copying of data)
5cm Phantom thickness
Mean rate O(MHz)

signal in last 2 LGADs too high (only 52MeV residual energy after 5cm)
 

ELOG V3.1.5-fc6679b