Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 13 of 15  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subject Run Number DUT Beam Energy Beam Betatron Beam Chopper Beam Degrader Beam EFEdown Beam Orb Beam QuadScan PhantomType PhantomAngle Events Data
  277   Sun Dec 6 15:37:05 2020 Christian IrmlerMPW2197W13_04252.7   1 SID0 HV = 80V10 spills 

HV = 80V

r0 c2

  278   Sun Dec 6 15:38:59 2020 Christian IrmlerMPW2198W13_04252.7   1 SID0 HV = 60V10 spills 

HV = 60V

r0 c2

  279   Sun Dec 6 15:41:31 2020 Christian IrmlerMPW2199W13_04252.7   1 SID0 HV = 40V10 spills 

HV = 40V

r0 c2

  281   Sun Dec 6 15:44:51 2020 Christian IrmlerMPW2200W13_04252.7   1 SID0 HV = during ramping10 spillsCrap

HV = 

r0 c2

  282   Sun Dec 6 15:45:45 2020 Christian IrmlerMPW2201W13_04252.7   1 SID0 HV = 100V10 spills 

r0 c2

  283   Sun Dec 6 15:53:12 2020 Christian IrmlerMPW2202W13_04252.7   1 SID0 HV off10 spills 

r0 c2

HV set to 0V, but KeithRC SW turned SMU output off 

  284   Sun Dec 6 15:55:13 2020 Christian IrmlerMPW2203W13_04252.7   1 SID0 HV = 1V10 spills 

r0 c2

lowest Voltage, which could be set with SMU outputs on.

  285   Sun Dec 6 15:57:28 2020 Christian IrmlerMPW2204W13_04252.7   1 SID0 HV = 20V10 spills 

r0 c2

  286   Sun Dec 6 16:01:02 2020 Christian IrmlerMPW2205W13_04252.7   1 SID0 HV = 80V10 spills 

pixel scan, starting with r0 c0

stopped after r1 c5 due to synch issues

  287   Sun Dec 6 16:32:54 2020 Christian IrmlerMPW2206W13_04252.7   1 SID0 HV = 80V10 spills 

pixel scan, starting with r1 c6

stopped after r3 c2

stopped due to time difference of ~10s between TLU and Caribou

  288   Sun Dec 6 16:53:35 2020 Christian IrmlerMPW2207W13_04252.7   1 SID0 HV = 80V10 spills 

pixel scan, starting with r3 c3

tried to syncronized clocks of Caribou and TLU syncronized before run started.
clock of caribou is still 3s ahead. --> need to use ntp server next time.

was interrupted between spill 64 an 65 for about 40 minutes due to MAPTA error (HL-tank error)

stopped after r7 c7

  289   Sun Dec 6 18:59:48 2020 Christian IrmlerMPW2208W13_04252.7   1 SID0 HV = 80V10 spills 

single pixel r0 c2

shutter time set to 2.5s (half of previous value)

  290   Sun Dec 6 19:07:20 2020 Christian IrmlerMPW2209W13_04252.7   1 SID0 HV = 80V10 spills 

single pixel r0 c2

shutter time set to 6s 

  291   Sun Dec 6 19:29:57 2020 Christian IrmlerMPW2210W13_04252.71  1   HV = 80V10 spills 

single pixel r0 c2

test run for new beam settings

  292   Sun Dec 6 19:30:38 2020 Christian IrmlerMPW2211W13_04252.71  1   HV = 80V10 spills 

pixle scan, starting with r0 c0

stopped after r0 c6 due network error (oscilloscope connected)

beam rate ~400k

hit rate MPW2: ~400 hits per spill

  293   Sun Dec 6 19:51:49 2020 Christian IrmlerMPW2212W13_04252.71  1   HV = 80V10 spillsCrap

pixel scan, starting with r0 c7

stopped due to broken pipe

Caribou rebooted

Entry is currently edited by Felix Ulrich-Pur on 80.120.130.63    294   Sun Dec 6 20:04:27 2020 Christian IrmlerMPW2213W13_04252.71  1   HV = 80V10 spills 

pixel scan, starting with r0 c7

 

  Draft   Fri May 8 15:17:39 2020 Felix Ulrich-Pur  DSSD-TrackerNoise          
  2   Sun May 10 13:43:49 2020 Christian Irmlersetup1Diamond + DSSD tracker       none   
Attachment 1: setup.jpg
setup.jpg
  3   Sun May 10 14:51:12 2020 Christian IrmlerCalibration Runs1Diamond + DSSD trackerNoise      none   

ADC delay, FIR, ped, noise,cal with DSSD tracker + diamond
DSSD HV= +/- 50V
Dia HV = +/- 250V

diamond not yet pumped

calibration files: pct_dia_01_silimond_tb_01-000001.xml

ELOG V3.1.5-fc6679b