Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020, Page 2 of 15  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subject Run Number DUT Beam Energy Beam Betatron Beam Chopper Beam Degrader Beam EFEdown Beam Orb Beam QuadScan PhantomType PhantomAngle Events Data
  131   Sat Jul 4 04:44:19 2020 Felix Ulrich-PurEFE SID2 spot-size measurement21Lynx+RaMon+Octavius+Film62.4   yes SID2    

tested 180s exposure time of Lynx, no signal in Lynx or Octavius

35min irradiation of film (no signal)

  132   Sat Jul 4 04:46:14 2020 Felix Ulrich-PurEFE SID2 spot-size measurement22Lynx+RaMon+Octavius252.7   yes SID2    

tested 180s exposure time of Lynx, no signal in Lynx or Octavius

 

  133   Sat Jul 4 04:46:54 2020 Felix Ulrich-PurEFE SID0 spot-size measurement23Lynx+RaMon+Octavius100.4   yes SID0    

 

 

  134   Sat Jul 4 04:47:17 2020 Felix Ulrich-PurEFE SID0 spot-size measurement24Lynx+RaMon+Octavius83   yes SID0    

 

 

  135   Sat Jul 4 04:48:19 2020 Felix Ulrich-PurEFE SID0 spot-size measurement25Lynx+RaMon+Octavius194.3   yes SID0    

 

 

  136   Sat Jul 4 05:05:16 2020 Felix Ulrich-PurEFE SID0 spot-size measurement26Lynx+RaMon+Octavius175.3   yes SID0    

 

 

  137   Sat Jul 4 05:05:29 2020 Felix Ulrich-PurEFE SID0 spot-size measurement27Lynx+RaMon+Octavius145.4   yes SID0    

 

 

  138   Sat Jul 4 05:42:48 2020 Felix Ulrich-PurEFE SID0 Energy measurement28Peakfinder194.3   yes SID0    

 

 

  139   Sat Jul 4 05:43:29 2020 Felix Ulrich-PurEFE SID0 Energy measurement29Peakfinder175.3   yes SID0    

 

 

  4   Sun May 10 15:26:33 2020 Christian Irmleralignment1Diamond + DSSD tracker252.7nonenone EFE SID2none 75970 

alignment run
DSSD HV = +/- 50V
Dia HV = +/- 250V
xml = pct_dia_01_silimond_beam_01-000001.xml

start: 15:00
stop: 15:56

Attachment 1: 01-000001.root-cogLocations_5.1.1.0-Empirics.png
01-000001.root-cogLocations_5.1.1.0-Empirics.png
Attachment 2: 01-000001.root-cogLocations_5.1.1.1-Empirics.png
01-000001.root-cogLocations_5.1.1.1-Empirics.png
Attachment 3: 01-000001.root-cogLocations_5.1.2.0-Empirics.png
01-000001.root-cogLocations_5.1.2.0-Empirics.png
Attachment 4: 01-000001.root-cogLocations_5.1.2.1-Empirics.png
01-000001.root-cogLocations_5.1.2.1-Empirics.png
Attachment 5: 01-000001.root-cogLocations_5.1.3.0-Empirics.png
01-000001.root-cogLocations_5.1.3.0-Empirics.png
Attachment 6: 01-000001.root-cogLocations_5.1.3.1-Empirics.png
01-000001.root-cogLocations_5.1.3.1-Empirics.png
Attachment 7: 01-000001.root-cogLocations_5.1.4.0-Empirics.png
01-000001.root-cogLocations_5.1.4.0-Empirics.png
Attachment 8: 01-000001.root-cogLocations_5.1.4.1-Empirics.png
01-000001.root-cogLocations_5.1.4.1-Empirics.png
  5   Sun May 10 15:58:42 2020 Christian Irmleralignment2Diamond + DSSD tracker252.7nonenone EFE SID2none 42740 

alignment run
DSSD HV = +/- 50V
Dia HV = +/- 250V
xml = pct_dia_01_silimond_beam_01-000001.xml

after ~ 1h beam (pumping)

start: 15:58
stop:  16:26

Attachment 1: 01-000002.root-cogLocations_5.1.1.0-Empirics.png
01-000002.root-cogLocations_5.1.1.0-Empirics.png
Attachment 2: 01-000002.root-cogLocations_5.1.1.1-Empirics.png
01-000002.root-cogLocations_5.1.1.1-Empirics.png
Attachment 3: 01-000002.root-cogLocations_5.1.2.0-Empirics.png
01-000002.root-cogLocations_5.1.2.0-Empirics.png
Attachment 4: 01-000002.root-cogLocations_5.1.2.1-Empirics.png
01-000002.root-cogLocations_5.1.2.1-Empirics.png
Attachment 5: 01-000002.root-cogLocations_5.1.3.0-Empirics.png
01-000002.root-cogLocations_5.1.3.0-Empirics.png
Attachment 6: 01-000002.root-cogLocations_5.1.3.1-Empirics.png
01-000002.root-cogLocations_5.1.3.1-Empirics.png
Attachment 7: 01-000002.root-cogLocations_5.1.4.0-Empirics.png
01-000002.root-cogLocations_5.1.4.0-Empirics.png
Attachment 8: 01-000002.root-cogLocations_5.1.4.1-Empirics.png
01-000002.root-cogLocations_5.1.4.1-Empirics.png
  8   Sun May 10 16:47:49 2020 Christian IrmlerBeam Diamond 600V5Diamond252.7nonenone EFE SID2none 103286 

diamond only
Dia HV = +/- 300V

pct_dia_01_diamond_600V_01-000005.xml

  15   Sun May 10 18:13:10 2020 Felix Ulrich-PurBeam Diamond 300V13Diamond252.7nonenone EFE SID2none 124099 

Diamond+pCT6
Dia HV = +/- 150V

ADC, FIR, ped, noise, cal

  16   Sun May 10 18:29:01 2020 Felix Ulrich-PurBeam Diamond 400V14Diamond252.7nonenone EFE SID2none 103304 

Diamond+pCT6
Dia HV = +/- 200V

ADC, FIR, ped, noise, cal

  17   Sun May 10 18:34:18 2020 Felix Ulrich-PurBeam Diamond 400V15Diamond62.4nonenone EFE SID2none 100868 

Diamond+pCT6
Dia HV = +/- 200V

ADC, FIR, ped, noise, cal

  18   Sun May 10 18:55:45 2020 Felix Ulrich-PurBeam Diamond 300V16Diamond62.4nonenone EFE SID2none 104515 

Diamond+pCT6
Dia HV = +/- 150V

ADC, FIR, ped, noise, cal

  19   Sun May 10 19:27:52 2020 Felix Ulrich-PurBeam Diamond 600V17Diamond62.4nonenone EFE SID2none 44667 

Diamond+pCT6
Dia HV = +/- 300V

ADC, FIR, ped, noise, cal

 

unterbrochen, da TLU-ERROR

  20   Sun May 10 19:28:36 2020 Felix Ulrich-PurBeam Diamond 600V18Diamond62.4nonenone EFE SID2none 62250 

Diamond+pCT6
Dia HV = +/- 300V

ADC, FIR, ped, noise, cal

 

PARTII

  21   Sun May 10 19:39:34 2020 Felix Ulrich-PurBeam Diamond+pCT6 500V19Diamond + DSSD-pCT662.4nonenone EFE SID2none 101031 

Diamond+pCT6
Dia HV = +/- 250V

ADC, FIR, ped, noise, cal

Attachment 1: 01-000019.root-cogLocations_5.1.1.0-Empirics.png
01-000019.root-cogLocations_5.1.1.0-Empirics.png
Attachment 2: 01-000019.root-cogLocations_5.1.1.1-Empirics.png
01-000019.root-cogLocations_5.1.1.1-Empirics.png
  22   Sun May 10 20:26:25 2020 Felix Ulrich-PurBeam+Diamond 500V20Diamond100.4nonenone EFE SID2none 103032 

Diamond
Dia HV = +/- 250V

ADC, FIR, ped, noise, cal

ELOG V3.1.5-fc6679b