Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2020  Not logged in ELOG logo
Message ID: 288     Entry time: Sun Dec 6 16:53:35 2020
Author: Christian Irmler 
Subject: MPW2 
Run Number: 207 
DUT: W13_04 
Beam Energy: 252.7 
Beam Betatron:  
Beam Chopper:  
Beam Degrader:  
Beam EFE:
Beam Orb:  
Beam QuadScan: SID0 
PhantomType:  
PhantomAngle: HV = 80V 
Events: 10 spills 
Data:  

pixel scan, starting with r3 c3

tried to syncronized clocks of Caribou and TLU syncronized before run started.
clock of caribou is still 3s ahead. --> need to use ntp server next time.

was interrupted between spill 64 an 65 for about 40 minutes due to MAPTA error (HL-tank error)

stopped after r7 c7

ELOG V3.1.5-fc6679b