ID Date Author Subject DUT Beam Energy Beam Setting Run Numberdown Events PhantomType PhantomAngle Text Attachments
  2   Sat Jul 13 13:32:30 2019 Thomas Bergauer2019-07-13f proton CTDSSD-Tracker EFE, QuadScan SID21 none Trigger: Coincidence using Scintillators

timing setting 41 (*32ns)

using 16ns cables from our scintialltors
  
  47   Fri Oct 25 18:09:21 2019 Alexander Burker2019-10-20 Low Flux 800EFE 1us, Degrader10, changed gain orb, gain 6, betatron10, no chopper122743none 06:25

WRONG GAIN ON THE ORB

tracker was not properly configured
 00-000001-debug.root-hitLocations_4.1.1.0-Empirics.png00-000001-debug.root-hitLocations_4.1.1.1-Empirics.png 
  78   Fri Oct 25 23:04:42 2019 Alexander Burker2019-10-25 Low Flux 800EFE 10, Betatron 10 %, Chopper 60 %, Degrader 20, Orb Gain 6 dB133784none    00-000001-debug.root-hitLocations_4.1.1.0-Empirics.png00-000001-debug.root-hitLocations_4.1.1.1-Empirics.png 
  1   Sat Jul 13 12:14:55 2019 Thomas Bergauer Drehtisch      Settings   Bildschirmfoto_2019-07-13_um_12.13.24.pngBildschirmfoto_2019-07-13_um_12.13.35.png 
  12   Sat Jul 13 18:42:24 2019 Alexander Burker2019-07-13f proton CTSketch pCT Setup    Big Line: DSSD
Small Line: Malta
Small Square: Phantom
 image.pngShift_13_(2).png 
  13   Sat Jul 13 18:52:33 2019 Alexander Burker2019-07-13f proton CTSketch TERA Calibration Setup       Image.png 
  16   Sat Jul 13 20:17:38 2019 Felix Ulrich-Pur TERA-Cal800   none Calibrated Voltage settings

P Voltage: 69V

Q Voltage: 76,8V
 DACsettings_after_calibration.txt 
  46   Tue Sep 24 11:12:45 2019 Alexander Burker Sketch      Notes of the planned order of modules within
beam (and reserve modules), before switching
out the first one
 Modules.jpg 
  76   Fri Oct 25 18:50:08 2019 Alexander Burker2019-10-20 Low FluxSketch      Spot Sizes Table: SpotsForBeamSettings.csv

Empirics, such as P2, P25, Median,
P75 and P98 were obtained directly from the
 SpotsForBeamSettings.csv 
  77   Fri Oct 25 18:56:11 2019 Alexander Burker2019-07-13f proton CTSketch    none Spot sizes table: SpotsForBeamSettings.csv

Empirics, such as P2, P25, Median,
P75 and P98 were obtained directly from the
 SpotsForBeamSettings.csv 
  100   Tue Nov 5 10:50:08 2019 Florian PittersLGAD Setups on 20. and 25.10. ShiftLGAD      Setup 1 (on 20.10.2019):



With Cividec


Position: beam center,
  
  101   Fri Nov 22 10:52:45 2019 Alexander Burker2019-11-23f proton CTSketch pCT Setup    Sketch of the setup for experiment 3, proton
CT
 Shift_2019-11-23f_1.png 