Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-MA2018 testbeam-MA2019 testbeam-MA2020 testbeam-MA2021 testbeam-MA2023 testbeam-MA2024
  MedAustron 2019  Not logged in ELOG logo
Message ID: 100     Entry time: Tue Nov 5 10:50:08 2019
Author: Florian Pitters 
Subject: LGAD Setups on 20. and 25.10. Shift 
DUT: LGAD 
Beam Energy:  
Beam Setting:  
Run Number:  
Events:  
PhantomType:  
PhantomAngle:  

Setup 1 (on 20.10.2019):

  • With Cividec

  • Position: beam center, ch3 (diode 1) in front, ch4 (diode 3) in the rear

  • RMS: ca. 23 mV, 24 mV

  • Trigger on Ch3: ca. 250 mV

  • Osci amplitude/div: 200 mV or 800 MeV, 400 mV for lower energies

 

Setup 2 (on 20.10.2019):

  • Same as setup 1 but 1 cm to the top from beam center

 

Setup 3 (on 25.10.2019):

  • Same as setup 1 but with Osci amplitude/div: 1V

 

Setup 4 (on 25.10.2019):

  • No Cividec

  • Postion: Same as setup 1

  • RMS: ca. 0.3 mV, 0.3 mV

  • Trigger: 3 mV

  • Osci amplitude/div: 10 mV

ELOG V3.1.5-fc6679b