Entry  Sat Jul 13 14:01:36 2019, Alexander Burker, 2019-07-13f proton CT, TERA-Cal, 145.4, EFE, QuadScan SID2, 3, 302912, none, none 00-000003-debug.root-hitLocations_4.1.1.0-Empirics.png00-000003-debug.root-hitLocations_4.1.1.1-Empirics.png

Trigger: Coincidence using Scintillators

TERA Linearitätsmessung

timing setting 41

 

Entry  Sat Jul 13 14:13:33 2019, Alexander Burker, 2019-07-13f proton CT, TERA-Cal, 100.4, EFE, QuadScan SID2, 4, 531644, none, none 00-000004-debug.root-hitLocations_4.1.1.0-Empirics.png00-000004-debug.root-hitLocations_4.1.1.1-Empirics.png

Trigger: Coincidence using Scintillators

TERA Linearitätsmessung

timing setting 41

 

Entry  Sat Jul 13 15:21:18 2019, Alexander Burker, 2019-07-13f proton CT, TERA-Cal, 83, EFE, QuadScan SID2, 5, 195212, none, none 

Trigger: Coincidence using Scintillators

TERA Linearitätsmessung

timing setting 41

Entry  Sat Jul 13 15:48:48 2019, Alexander Burker, 2019-07-13f proton CT, TERA-Cal, 62.4, EFE, QuadScan SID2, 6, 10384, none, none 00-000006-debug.root-hitLocations_4.1.1.0-Empirics.png00-000006-debug.root-hitLocations_4.1.1.1-Empirics.png

Trigger: Coincidence using Scintillators

TERA Linearitätsmessung

timing setting 41

 

Entry  Sat Jul 13 16:14:00 2019, Alexander Burker, 2019-07-13f proton CT, TERA-Cal, 800, EFE 1us , Degrader10, changed gain orb, betatron10, no chopper, 7, 18471, none, none 00-000007-debug.root-hitLocations_4.1.1.0-Empirics.png00-000007-debug.root-hitLocations_4.1.1.1-Empirics.png

Trigger: Coincidence using Scintillators

Alignment

timing setting 41

abgebrochen wegen instabilem beam

 

Entry  Sat Jul 13 16:36:32 2019, Alexander Burker, 2019-07-13f proton CT, TERA-Cal, 800, EFE 1us , Degrader20, changed gain orb, no betatron, chopper 60, 8, 108089, none, none 00-000008-debug.root-hitLocations_4.1.1.0-Empirics.png00-000008-debug.root-hitLocations_4.1.1.1-Empirics.png

Trigger: Coincidence using Scintillators

Alignment

timing setting 41

 

Entry  Sat Jul 13 20:17:38 2019, Felix Ulrich-Pur, , TERA-Cal, 800, , , , none,  DACsettings_after_calibration.txt

Calibrated Voltage settings

P Voltage: 69V

Q Voltage: 76,8V

R Voltage: 68,65V

S Voltage: 68,9 V

Entry  Sat Jul 13 18:42:24 2019, Alexander Burker, 2019-07-13f proton CT, Sketch, , pCT Setup, , , ,  image.pngShift_13_(2).png

Big Line: DSSD
Small Line: Malta
Small Square: Phantom
Small Rectangle: Trigger Scintillator
Big Rectangle: TERA

Beam is coming in from Left to Right

Entry  Sat Jul 13 18:52:33 2019, Alexander Burker, 2019-07-13f proton CT, Sketch, , TERA Calibration Setup, , , ,  Image.png
 
Entry  Tue Sep 24 11:12:45 2019, Alexander Burker, , Sketch, , , , , ,  Modules.jpg

Notes of the planned order of modules within beam (and reserve modules), before switching out the first one

Entry  Fri Oct 25 18:50:08 2019, Alexander Burker, 2019-10-20 Low Flux, Sketch, , , , , ,  SpotsForBeamSettings.csv

Spot Sizes Table: SpotsForBeamSettings.csv

Empirics, such as P2, P25, Median, P75 and P98 were obtained directly from the data. These may not be accurate if the beam is larger than the sensor.

To better describe these cases, fit values were obtained with a curve fit to a normal distribution. This can also be inaccurate, as many beam settings aren't normal and the automatic fit might have failed. A goodness-of-fit will be added to each row in the distant future

Entry  Fri Oct 25 18:56:11 2019, Alexander Burker, 2019-07-13f proton CT, Sketch, , , , , none,  SpotsForBeamSettings.csv

Spot sizes table: SpotsForBeamSettings.csv

Empirics, such as P2, P25, Median, P75 and P98 were obtained directly from the data. These may not be accurate if the beam is larger than the sensor.

To better describe these cases, fit values were obtained with a curve fit to a normal distribution. This can also be inaccurate, as many beam settings aren't normal and the automatic fit might have failed. A goodness-of-fit will be added to each row in the distant future

Entry  Fri Nov 22 10:52:45 2019, Alexander Burker, 2019-11-23f proton CT, Sketch, , pCT Setup, , , ,  Shift_2019-11-23f_1.png

Sketch of the setup for experiment 3, proton CT

Entry  Fri Jan 24 09:33:12 2020, Alexander Burker, 2019-07-13f MaltaPix, MALTA, 800, EFE 1us , Degrader20, changed gain orb, no betatron, chopper 60, 1017, , none,  

Corresponds to DSSD tracker Run 8 (https://elog.hephy.at/testbeam-MA2019/10)

Trigger: Coincidence using Scintillators

Entry  Fri Jan 24 09:39:08 2020, Alexander Burker, 2019-07-13f MaltaPix, MALTA, 145.4, EFE, QuadScan SID2, 1018, , Alu, 0 

Corresponds to DSSD tracker Run 9 (https://elog.hephy.at/testbeam-MA2019/11)

Trigger: Coincidence using Scintillators

Entry  Fri Jan 24 09:40:11 2020, Alexander Burker, 2019-07-13f MaltaPix, MALTA, 145.4, EFE, QuadScan SID2, 1019, , Alu, 20 

Corresponds to DSSD tracker Run 10 (https://elog.hephy.at/testbeam-MA2019/14)

Trigger: Coincidence using Scintillators

Entry  Fri Jan 24 09:42:59 2020, Alexander Burker, 2019-07-13f MaltaPix, MALTA, 145.4, EFE, QuadScan SID2, 1020, , Alu, 20 

Corresponds to DSSD tracker Run 11 (https://elog.hephy.at/testbeam-MA2019/15)

Trigger: Coincidence using Scintillators

Entry  Fri Jan 24 09:44:49 2020, Alexander Burker, 2019-07-13f MaltaPix, MALTA, 145.4, EFE, QuadScan SID2, 1022, , Alu, 20 

Corresponds to DSSD tracker Run 12 (https://elog.hephy.at/testbeam-MA2019/17)

Trigger: Coincidence using Scintillators

 

Entry  Fri Jan 24 09:45:52 2020, Alexander Burker, 2019-07-13f MaltaPix, MALTA, 145.4, EFE, QuadScan SID2, 1023, , Alu, 40 

Corresponds to DSSD tracker Run 13 (https://elog.hephy.at/testbeam-MA2019/18)

Trigger: Coincidence using Scintillators

Entry  Tue Nov 5 10:50:08 2019, Florian Pitters, LGAD Setups on 20. and 25.10. Shift, LGAD, , , , , ,  

Setup 1 (on 20.10.2019):

  • With Cividec

  • Position: beam center, ch3 (diode 1) in front, ch4 (diode 3) in the rear

  • RMS: ca. 23 mV, 24 mV

  • Trigger on Ch3: ca. 250 mV

  • Osci amplitude/div: 200 mV or 800 MeV, 400 mV for lower energies

 

Setup 2 (on 20.10.2019):

  • Same as setup 1 but 1 cm to the top from beam center

 

Setup 3 (on 25.10.2019):

  • Same as setup 1 but with Osci amplitude/div: 1V

 

Setup 4 (on 25.10.2019):

  • No Cividec

  • Postion: Same as setup 1

  • RMS: ca. 0.3 mV, 0.3 mV

  • Trigger: 3 mV

  • Osci amplitude/div: 10 mV