ID Date Author Subject DUTdown Beam Energy Beam Setting Run Number Events PhantomType PhantomAngle
  5   Sat Jul 13 14:01:36 2019 Alexander Burker2019-07-13f proton CTTERA-Cal145.4EFE, QuadScan SID23302912nonenone

Trigger: Coincidence using Scintillators

TERA Linearitätsmessung

timing setting 41

 

  6   Sat Jul 13 14:13:33 2019 Alexander Burker2019-07-13f proton CTTERA-Cal100.4EFE, QuadScan SID24531644nonenone

Trigger: Coincidence using Scintillators

TERA Linearitätsmessung

timing setting 41

 

  7   Sat Jul 13 15:21:18 2019 Alexander Burker2019-07-13f proton CTTERA-Cal83EFE, QuadScan SID25195212nonenone

Trigger: Coincidence using Scintillators

TERA Linearitätsmessung

timing setting 41

  8   Sat Jul 13 15:48:48 2019 Alexander Burker2019-07-13f proton CTTERA-Cal62.4EFE, QuadScan SID2610384nonenone

Trigger: Coincidence using Scintillators

TERA Linearitätsmessung

timing setting 41

 

  9   Sat Jul 13 16:14:00 2019 Alexander Burker2019-07-13f proton CTTERA-Cal800EFE 1us , Degrader10, changed gain orb, betatron10, no chopper718471nonenone

Trigger: Coincidence using Scintillators

Alignment

timing setting 41

abgebrochen wegen instabilem beam

 

  10   Sat Jul 13 16:36:32 2019 Alexander Burker2019-07-13f proton CTTERA-Cal800EFE 1us , Degrader20, changed gain orb, no betatron, chopper 608108089nonenone

Trigger: Coincidence using Scintillators

Alignment

timing setting 41

 

  16   Sat Jul 13 20:17:38 2019 Felix Ulrich-Pur TERA-Cal800   none 

Calibrated Voltage settings

P Voltage: 69V

Q Voltage: 76,8V

R Voltage: 68,65V

S Voltage: 68,9 V

  12   Sat Jul 13 18:42:24 2019 Alexander Burker2019-07-13f proton CTSketch pCT Setup    

Big Line: DSSD
Small Line: Malta
Small Square: Phantom
Small Rectangle: Trigger Scintillator
Big Rectangle: TERA

Beam is coming in from Left to Right

  13   Sat Jul 13 18:52:33 2019 Alexander Burker2019-07-13f proton CTSketch TERA Calibration Setup    
  46   Tue Sep 24 11:12:45 2019 Alexander Burker Sketch      

Notes of the planned order of modules within beam (and reserve modules), before switching out the first one

  76   Fri Oct 25 18:50:08 2019 Alexander Burker2019-10-20 Low FluxSketch      

Spot Sizes Table: SpotsForBeamSettings.csv

Empirics, such as P2, P25, Median, P75 and P98 were obtained directly from the data. These may not be accurate if the beam is larger than the sensor.

To better describe these cases, fit values were obtained with a curve fit to a normal distribution. This can also be inaccurate, as many beam settings aren't normal and the automatic fit might have failed. A goodness-of-fit will be added to each row in the distant future

  77   Fri Oct 25 18:56:11 2019 Alexander Burker2019-07-13f proton CTSketch    none 

Spot sizes table: SpotsForBeamSettings.csv

Empirics, such as P2, P25, Median, P75 and P98 were obtained directly from the data. These may not be accurate if the beam is larger than the sensor.

To better describe these cases, fit values were obtained with a curve fit to a normal distribution. This can also be inaccurate, as many beam settings aren't normal and the automatic fit might have failed. A goodness-of-fit will be added to each row in the distant future

  101   Fri Nov 22 10:52:45 2019 Alexander Burker2019-11-23f proton CTSketch pCT Setup    

Sketch of the setup for experiment 3, proton CT

  127   Fri Jan 24 09:33:12 2020 Alexander Burker2019-07-13f MaltaPixMALTA800EFE 1us , Degrader20, changed gain orb, no betatron, chopper 601017 none 

Corresponds to DSSD tracker Run 8 (https://elog.hephy.at/testbeam-MA2019/10)

Trigger: Coincidence using Scintillators

  128   Fri Jan 24 09:39:08 2020 Alexander Burker2019-07-13f MaltaPixMALTA145.4EFE, QuadScan SID21018 Alu0

Corresponds to DSSD tracker Run 9 (https://elog.hephy.at/testbeam-MA2019/11)

Trigger: Coincidence using Scintillators

  129   Fri Jan 24 09:40:11 2020 Alexander Burker2019-07-13f MaltaPixMALTA145.4EFE, QuadScan SID21019 Alu20

Corresponds to DSSD tracker Run 10 (https://elog.hephy.at/testbeam-MA2019/14)

Trigger: Coincidence using Scintillators

  130   Fri Jan 24 09:42:59 2020 Alexander Burker2019-07-13f MaltaPixMALTA145.4EFE, QuadScan SID21020 Alu20

Corresponds to DSSD tracker Run 11 (https://elog.hephy.at/testbeam-MA2019/15)

Trigger: Coincidence using Scintillators

  131   Fri Jan 24 09:44:49 2020 Alexander Burker2019-07-13f MaltaPixMALTA145.4EFE, QuadScan SID21022 Alu20

Corresponds to DSSD tracker Run 12 (https://elog.hephy.at/testbeam-MA2019/17)

Trigger: Coincidence using Scintillators

 

  132   Fri Jan 24 09:45:52 2020 Alexander Burker2019-07-13f MaltaPixMALTA145.4EFE, QuadScan SID21023 Alu40

Corresponds to DSSD tracker Run 13 (https://elog.hephy.at/testbeam-MA2019/18)

Trigger: Coincidence using Scintillators

  100   Tue Nov 5 10:50:08 2019 Florian PittersLGAD Setups on 20. and 25.10. ShiftLGAD      

Setup 1 (on 20.10.2019):

  • With Cividec

  • Position: beam center, ch3 (diode 1) in front, ch4 (diode 3) in the rear

  • RMS: ca. 23 mV, 24 mV

  • Trigger on Ch3: ca. 250 mV

  • Osci amplitude/div: 200 mV or 800 MeV, 400 mV for lower energies

 

Setup 2 (on 20.10.2019):

  • Same as setup 1 but 1 cm to the top from beam center

 

Setup 3 (on 25.10.2019):

  • Same as setup 1 but with Osci amplitude/div: 1V

 

Setup 4 (on 25.10.2019):

  • No Cividec

  • Postion: Same as setup 1

  • RMS: ca. 0.3 mV, 0.3 mV

  • Trigger: 3 mV

  • Osci amplitude/div: 10 mV