Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle II and AIDA/Infineon Testbeam at DESY in Jan2014, Page 4 of 5  Not logged in ELOG logo
Entry  Tue Jan 7 02:17:14 2014, Thomas Bergauer, , beam momentum 6GeV/c, run013, , , , Unknown 
 
Entry  Tue Jan 7 08:36:29 2014, Thomas Bergauer, Infineon, run, run014, 20k, 07.01.2014 08:34:06, 07.01.2014 09:05:47, Good 
HV=290V  I=9.55uA
position centered horizontally (+5mm)
DESY table z=-346 x=-255 
6Gev/c,
bad strip region hardly hit
Entry  Tue Jan 7 09:12:24 2014, Thomas Bergauer, Belle SVD, run, run015, 20k, 07.01.2014 09:10:52, 07.01.2014 09:15:39, Good 
 HV=290V  I=9.55uA
position centered horizontally (+5mm)
DESY table z=-346 x=-255
 
energy switched back to 3Gev/c
Entry  Tue Jan 7 09:22:09 2014, Thomas Bergauer, , run, run016, 50k, 07.01.2014 09:19:10, 07.01.2014 09:30:03, Good 
HV=290V  I=9.00uA
position move back to original position (0mm/0mm) (not hitting the right APVs anymore)
DESY
table z=-346 x=-255 
Entry  Tue Jan 7 09:33:16 2014, Thomas Bergauer, , run, run017, 100k, 07.01.2014 09:31:45, 07.01.2014 09:52:58, Good 
HV=300V  I=9.08uA
position adapted to center beam better (+10mm horizonal)
DESY table z=-346 x=-255 
3Gev/c
Entry  Tue Jan 7 09:33:51 2014, Thomas Bergauer, common, beam momentum back to 3Gev/c, run014 and later ones, , , , Unknown 
 
Entry  Tue Jan 7 14:51:45 2014, Thomas Bergauer, Belle SVD, TLU control, , , , , Unknown 
1. ssh bastion
2. ssh belle-control
3. ssh telescope-admin@tb-aconite
Entry  Wed Jan 8 12:40:30 2014, Thomas Bergauer, AIDA, intcal AIDA Stack, cal034, 83.8k, 08.01.2014 12:32:22, 08.01.2014 13:01:30, Unknown 
 HV=100V  I=4.5uA
position adapted to center beam
 
Entry  Wed Jan 8 14:10:07 2014, Thomas Bergauer, AIDA, run, run035, 211681, 08.01.2014 14:01:25, 08.01.2014 17:03:55, Unknown 
 HV=100V  I=4.2uA
position adapted to center beam
 
accidentally hit reset button on PC which ended this run abruptly...
 
Entry  Thu Jan 9 14:47:21 2014, Thomas Bergauer, common, position of DESY Table, , , , , Unknown 
BEAM mode:

    height (z): -346 (initially: -357)
    horizontal (x): -255 

OFF BEAM mode (Parkposition):

    height (z): +37
    horizontal (x): -255 

 
Entry  Fri Jan 24 11:03:14 2014, Wolfgang Treberspurg, AIDA, AIDA, HW_AIDA002, 0, 24.01.2014 10:02, , Crap 
TuxDaq crashed
Entry  Fri Jan 24 18:02:46 2014, Wolfgang Treberspurg, Infineon, New Infineon Stack, , , , , Good 
Exchanged AIDA stack with modified Infineon Stack 
Configuration: 
Beam   Infineon_TB_2014_Baby1(P0)   ---   Inifineon_TB_2014_Baby2(P1) |||  Infineon_TB_2012_Baby2(P2)  --- Infineon_TB_2012_Baby1(P3)
Entry  Sat Jan 25 18:24:03 2014, Wolfgang Treberspurg, Infineon, Single mode Run Stack 2, HW_Run_Infineon_Stack2_001, 1.05 M, 25.01.2014 10:30, 25.01.2014 15:40, Unknown 
HV at 300V; I at app. 11µA 4GeV, Single mode
Modules centered to beam but no hits at additional Strixel modul. Perhaps HV problems (High noise of Strixel almost did not change after biasing)
-> HV connection will be checked at next opportunity to enter area.
Entry  Sat Jan 25 18:28:38 2014, Wolfgang Treberspurg, Infineon, Calibration run Infineon Stack 2, Calibration_Run_Infineon_Stack2_001, 82900, 25.01.2014 10:15, 25.01.2014 10:25, Unknown 
HV 300V, I ca. 11µA single mode
Entry  Sat Jan 25 18:46:32 2014, Wolfgang Treberspurg, Infineon, Mulit 6 mode Run Stack 2, HW_Run_Infineon_Stack2_Multi_001, 340k, 25.01.2014 16:30, 25.01.2014 18:40, Unknown 
HV 300V, I 10µA
Beam Energy changed during the run between 2GeV - 5GeV - 4GeV
Latency perhaps not optimal set (has been 95) but exchanged trigger cable seems to require 93
Entry  Sat Jan 25 21:14:46 2014, Wolfgang Treberspurg, Infineon, Mulit 6 mode Run Stack 2, HW_Run_Infineon_Stack2_Multi_002, 230k, 25.01.2014 19:00, 25.01.2014 21:15, Good 
HV 300V, I 10µA
Beam Energy  4GeV
Latency changed to 93
Entry  Sun Jan 26 19:12:42 2014, Wolfgang Treberspurg, Infineon, Single mode Run Stack 2, HW_Run_Infineon_Stack2_002, 4 M, 25.01.2014 22:30, 26.01.2014 15:15, Good 
HV at 300V; I at app. 11µA 4GeV, Single mode
 
Entry  Sun Jan 26 19:14:07 2014, Wolfgang Treberspurg, Infineon, Single mode Run Stack 2, HW_Run_Infineon_Stack2_003, 140 k, 26.01.2014 18:10, 26.01.2014 19:15, Good 
HV at 300V; I at app. 10µA 5GeV, Single mode
 
Entry  Mon Jan 27 12:20:53 2014, Wolfgang Treberspurg, Infineon, Single mode Run Stack 2, HW_Run_Infineon_Stack2_004, 800k, 27.01.2014 09:10, 27.01.2014 12:15, Good 
HV at 300V; I at app. 10µA 3GeV, Single mode
 
Entry  Wed Jan 29 12:02:52 2014, Wolfgang Treberspurg, Infineon, Single mode Run Stack 2 Bias Scan, HW_Run_Infineon_Stack2_BiasScan_001, 100k, 28.01.2014 16:30, 28.01.2014 16:50, Good 
HV at 0V; I at app. 5nA 3GeV, Single mode
 
ELOG V3.1.5-fc6679b