Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle II and AIDA/Infineon Testbeam at DESY in Jan2014, Page 4 of 5  Not logged in ELOG logo
Entry  Tue Jan 7 17:09:56 2014, Markus Friedl, Infineon, run, run025, 200k, 07.01.2014 17:08:54, 07.01.2014 17:36:12, Good 

HV=220V  I=8.1uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 17:39:20 2014, Markus Friedl, Infineon, run, run026, 200k, 07.01.2014 17:38:01, 07.01.2014 18:05:11, Good 

HV=230V  I=8.2uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 18:11:52 2014, Markus Friedl, Infineon, run, run027, 200k, 07.01.2014 18:10:45, 07.01.2014 18:37:42, Good 

HV=240V  I=8.2uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 18:41:55 2014, Markus Friedl, Infineon, run, run028, 200k, 07.01.2014 18:40:40, 07.01.2014 19:07:32, Good 

HV=250V  I=8.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 19:12:07 2014, Markus Friedl, Infineon, run, run029, 200k, 07.01.2014 19:11:05, 07.01.2014 19:38:00, Good 

HV=260V  I=8.7uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 19:44:45 2014, Markus Friedl, Infineon, run, run030, 200k, 07.01.2014 19:43:35, 07.01.2014 20:11:03, Good 

HV=270V  I=8.6uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 20:26:50 2014, Markus Friedl, Infineon, run, run031, 200k, 07.01.2014 20:25:32, 07.01.2014 20:58:47, Good 

HV=280V  I=8.4uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 21:02:58 2014, Markus Friedl, Infineon, run, run032, 200k, 07.01.2014 21:01:42, 07.01.2014 21:29:03, Good 

HV=290V  I=8.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

Entry  Tue Jan 7 21:34:41 2014, Markus Friedl, Infineon, run, run033, 4.117.024 (4M), 07.01.2014 21:33:12, 08.01.2014 08:52:37, Good 

HV=300V  I=8.3uA

position adapted to center beam better (+10mm horizontal)

narrow trigger width (~5ns)

single trigger

 

Beam energy = 3 GeV

 

beam gone at 8:00 morning because of scheduled beam development. last few 100 events only noise.

Entry  Wed Jan 8 17:20:40 2014, Markus Friedl, AIDA, run, run036, 320k, 08.01.2014 17:18:51, 08.01.2014 22:14:58, Unknown 

 HV=100V  I=4.3uA

centered position

5GeV beam

narrow timing (trigger width), but 6 samples

 

Entry  Wed Jan 8 22:19:11 2014, Markus Friedl, AIDA, run, run037, 1.2M, 08.01.2014 22:18:30, 09.01.2014 10:08:14, Good 

HV=100V  I=4.4uA
centered position
5GeV beam, single sample
narrow timing (trigger width)

 

Entry  Thu Jan 9 10:10:31 2014, Markus Friedl, AIDA, cal, cal038, 83800, 09.01.2014 10:09:27, 09.01.2014 10:38:23, Good 

HV=100V  I=4.2uA
centered position
5GeV beam, single sample
narrow timing (trigger width)

Entry  Thu Jan 9 11:02:14 2014, Markus Friedl, AIDA, info, , , , , Unknown 

Created bad strip masks for the AIDA config files

Entry  Thu Jan 9 11:04:34 2014, Markus Friedl, AIDA, run, run039, 100k, 09.01.2014 11:02:36, 09.01.2014 12:28:41, Good 

HV=10V  I=2.1uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

 

Entry  Thu Jan 9 12:31:29 2014, Markus Friedl, AIDA, run, run040, 100k, 09.01.2014 12:30:32, 09.01.2014 13:55:47, Good 

HV=20V  I=2.9uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

 

Entry  Thu Jan 9 14:07:31 2014, Markus Friedl, AIDA, run, run041, 100k, 09.01.2014 14:06:32, 09.01.2014 15:33:13, Good 

HV=30V  I=3.3uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

 

Entry  Thu Jan 9 16:36:30 2014, Markus Friedl, AIDA, run, run042, 100k, 09.01.2014 16:35:43, 09.01.2014 18:02:17, Good 

HV=40V  I=3.4uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

 

Entry  Thu Jan 9 18:09:40 2014, Markus Friedl, AIDA, run, run044, 100k, 09.01.2014 18:08:19, 09.01.2014 19:35:21, Good 

HV=50V  I=3.6uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

MOVED TIMING by 1 clock (now signal is centered again)

Entry  Thu Jan 9 19:37:33 2014, Markus Friedl, AIDA, run, run045, 100k, 09.01.2014 19:36:21, 09.01.2014 21:01:31 , Good 

HV=60V  I=3.8uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

Entry  Thu Jan 9 21:41:20 2014, Markus Friedl, AIDA, run, run046, 100k, 09.01.2014 21:40:29, 09.01.2014 23:07:16, Good 

HV=70V  I=3.8uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

ELOG V3.1.5-fc6679b