Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle II and AIDA/Infineon Testbeam at DESY in Jan2014, Page 2 of 5  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Project Subject Run Number Events StartTime EndTimedown Data
  78   Sun Jan 26 19:12:42 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2HW_Run_Infineon_Stack2_0024 M25.01.2014 22:3026.01.2014 15:15Good

HV at 300V; I at app. 11µA 4GeV, Single mode

 

  77   Sat Jan 25 21:14:46 2014 Wolfgang TreberspurgInfineonMulit 6 mode Run Stack 2HW_Run_Infineon_Stack2_Multi_002230k25.01.2014 19:0025.01.2014 21:15Good

HV 300V, I 10µA

Beam Energy  4GeV

Latency changed to 93

  76   Sat Jan 25 18:46:32 2014 Wolfgang TreberspurgInfineonMulit 6 mode Run Stack 2HW_Run_Infineon_Stack2_Multi_001340k25.01.2014 16:3025.01.2014 18:40Unknown

HV 300V, I 10µA

Beam Energy changed during the run between 2GeV - 5GeV - 4GeV

Latency perhaps not optimal set (has been 95) but exchanged trigger cable seems to require 93

  74   Sat Jan 25 18:24:03 2014 Wolfgang TreberspurgInfineonSingle mode Run Stack 2HW_Run_Infineon_Stack2_0011.05 M25.01.2014 10:3025.01.2014 15:40Unknown

HV at 300V; I at app. 11µA 4GeV, Single mode

Modules centered to beam but no hits at additional Strixel modul. Perhaps HV problems (High noise of Strixel almost did not change after biasing)

-> HV connection will be checked at next opportunity to enter area.

  75   Sat Jan 25 18:28:38 2014 Wolfgang TreberspurgInfineonCalibration run Infineon Stack 2Calibration_Run_Infineon_Stack2_0018290025.01.2014 10:1525.01.2014 10:25Unknown

HV 300V, I ca. 11µA single mode

  72   Fri Jan 24 11:23:15 2014 Hao Yin AIDAHW_AIDA0037635624.02.2014 10:3024.02.2014 11:22Unknown

HV=100V  I=3.7uA
position = 0 / -30 mm relative to initial (but again centered) no idea ---
3GeV beam, multipeak 6 samples
???narrow timing (trigger width)??? no idea ...

  69   Thu Jan 23 22:47:49 2014 Hao Yin AIDACalibrationRun0018380023.01.2014 13:35:5523.01.2014 02:08:15Good

taken with tuxdaq...

HV=75V  I=?3.7uA?
position = 0 / -30 mm relative to initial (but again centered) ?
?5GeV beam, single sample? (software trigger run)
?narrow timing (trigger width)?

  66   Mon Jan 13 01:58:14 2014 Markus FriedlAIDArunrun057900k13.01.2014 01:56:2613.01.2014 10:48:22Good

HV=100V  I=3.7uA
position = 0 / -30 mm relative to initial (but again centered)
5GeV beam, single sample
narrow timing (trigger width)

  65   Sun Jan 12 18:04:18 2014 Markus FriedlAIDArunrun056510k12.01.2014 17:59:5713.01.2014 01:47:50Good

HV=100V  I=3.7uA
position = -25 / 0 mm relative to initial
5GeV beam, 6 samples
narrow timing (trigger width)

Something strange with x/y stage: stuck at approximately y=+3.5 (hitting box lid?), now back to 0, but about 180 strips off compared to run054 (y=0 as well)...

  64   Sun Jan 12 10:36:37 2014 Markus FriedlAIDArunrun05531091312.01.2014 10:34:4412.01.2014 15:42:47Good

HV=100V  I=3.6uA
position = 23 / -35 mm relative to before
5GeV beam, 6 samples
narrow timing (trigger width)

  63   Sat Jan 11 22:32:19 2014 Markus FriedlAIDArunrun054800k11.01.2014 22:30:4412.01.2014 10:13:10Good

HV=150V  I=5.3uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  62   Sat Jan 11 20:56:29 2014 Markus FriedlAIDArunrun053100k11.01.2014 20:55:2911.01.2014 22:25:43Good

HV=140V  I=7.1uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  61   Fri Jan 10 13:04:49 2014 Markus FriedlAIDArunrun052100k10.01.2014 13:04:0510.01.2014 14:30:18Good

HV=130V  I=4.6uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  60   Fri Jan 10 11:26:54 2014 Markus FriedlAIDArunrun051100k10.01.2014 11:26:0810.01.2014 12:53:12Good

HV=120V  I=4.6uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  58   Fri Jan 10 09:54:11 2014 Markus FriedlAIDArunrun050100k10.01.2014 09:53:1310.01.2014 11:21:12Good

HV=110V  I=4.1uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  57   Fri Jan 10 08:21:46 2014 Markus FriedlAIDArunrun049100k10.01.2014 08:20:49 10.01.2014 09:49:46Good

HV=100V  I=4.2uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  56   Fri Jan 10 00:58:46 2014 Markus FriedlAIDArunrun048500k10.01.2014 00:57:4810.01.2014 08:17:57Good

HV=90V  I=3.9uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  55   Thu Jan 9 23:27:27 2014 Markus FriedlAIDArunrun047100k09.01.2014 23:26:3510.01.2014 00:52:56Good

HV=80V  I=3.8uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  54   Thu Jan 9 21:41:20 2014 Markus FriedlAIDArunrun046100k09.01.2014 21:40:2909.01.2014 23:07:16Good

HV=70V  I=3.8uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

  53   Thu Jan 9 19:37:33 2014 Markus FriedlAIDArunrun045100k09.01.2014 19:36:2109.01.2014 21:01:31 Good

HV=60V  I=3.8uA
centered position, HV scan
5GeV beam, 6 samples
narrow timing (trigger width)

ELOG V3.1.5-fc6679b