Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle II and AIDA/Infineon Testbeam at DESY in Jan2014, Page 1 of 5  Not logged in ELOG logo
ID Date Author Projectdown Subject Run Number Events StartTime EndTime Data
  7   Mon Jan 6 19:10:36 2014 Thomas BergauercommonBeam Momentum 3GeV/crun001 to run012   Unknown

We have set the beam momentum to 3 GeV 

Attachment 1: IMG_1517.jpg
IMG_1517.jpg
Attachment 2: IMG_1516.jpg
IMG_1516.jpg
  23   Tue Jan 7 09:33:51 2014 Thomas Bergauercommonbeam momentum back to 3Gev/crun014 and later ones   Unknown
  50   Thu Jan 9 14:47:21 2014 Thomas Bergauercommonposition of DESY Table    Unknown

BEAM mode:

  • height (z): -346 (initially: -357)
  • horizontal (x): -255 

OFF BEAM mode (Parkposition):

  • height (z): +37
  • horizontal (x): -255 

 

  67   Mon Jan 13 12:02:40 2014 Markus FriedlcommonKontakt    Unknown

Richard Thalmeier   Tel. 4801

Hao Yin  

  68   Sun Jan 19 18:01:46 2014 Christian IrmlercommonAIDA setup operated with TuxDAQ    Unknown

New SIS driver version sis1100-2.13-3 installed on DAQPC. 

To install the driver call as root:

cd /lib/modules/2.6.18-371.3.1.el5/extra

/sbin/modprobe sis1100

Check if /dev/sis* are created.

Managed to run the AIDA setup with old TuxDAQ version from T. Obermayer.

Will now try to install a newer version, which also supports ADC delay scan and internal calibration.

  1   Sat Jan 4 16:30:46 2014 Markus FriedlInfineoncalcal0018380004.01.2014 16:16:5104.01.2014 16:25:46Good

HV=300V  I=9.3uA  (total)

  3   Mon Jan 6 16:33:13 2014 Markus FriedlInfineonrunrun001200k06.01.2014 16:28:5806.01.2014 17:10:56Good

HV=300V  I=11.1uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  4   Mon Jan 6 17:17:47 2014 Markus FriedlInfineonrunrun002200k06.01.2014 17:14:3906.01.2014 18:00:34Good

HV=100V  I=8.5uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  5   Mon Jan 6 18:06:16 2014 Markus FriedlInfineonrunrun003200k06.01.2014 18:04:1406.01.2014 18:44:15Good

HV=200V  I=9.3uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  6   Mon Jan 6 18:49:00 2014 Markus FriedlInfineonrunrun004200k06.01.2014 18:47:3806.01.2014 19:27:33Good

HV=250V  I=9.5uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  9   Mon Jan 6 20:14:21 2014 Markus FriedlInfineonrunrun006200k06.01.2014 20:12:2006.01.2014 20:54:34Good

HV=240V  I=9.4uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  10   Mon Jan 6 20:57:38 2014 Markus FriedlInfineonrunrun007200k06.01.2014 20:56:0806.01.2014 21:36:54Good

HV=220V  I=9.1uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  11   Mon Jan 6 21:40:29 2014 Markus FriedlInfineonrunrun008200k06.01.2014 21:38:4606.01.2014 22:20:13Good

HV=210V  I=9.0uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  12   Mon Jan 6 22:23:39 2014 Markus FriedlInfineonrunrun009200k06.01.2014 22:22:1006.01.2014 23:03:23Good

HV=260V  I=9.3uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  13   Mon Jan 6 23:06:51 2014 Markus FriedlInfineonrunrun010200k06.01.2014 23:03:2306.01.2014 23:47:02 Good

HV=270V  I=9.6uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  14   Mon Jan 6 23:50:59 2014 Markus FriedlInfineonrunrun011200k06.01.2014 23:49:0907.01.2014 00:30:38 Good

HV=280V  I=9.6uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

  15   Tue Jan 7 00:36:03 2014 Markus FriedlInfineonrunrun012190k07.01.2014 00:33:5807.01.2014 02:12:32 Good

HV=150V  I=8.0uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

 

close to end: switched to 6GeV

  18   Tue Jan 7 02:18:26 2014 Markus FriedlInfineonrunrun013215k07.01.2014 02:14:5007.01.2014 08:31:25Crap

HV=150V  I=7.90uA

position centered horizontally (+5mm)

DESY table z=-346 x=-255

 

3 GeV beam momentum

 

close to end: switched to 6GeV

bias voltage accidentally left at 150V instead of initially planned 290V

  19   Tue Jan 7 08:36:29 2014 Thomas BergauerInfineonrunrun01420k07.01.2014 08:34:0607.01.2014 09:05:47Good
HV=290V  I=9.55uA
position centered horizontally (+5mm)

DESY table z=-346 x=-255 

6Gev/c,

bad strip region hardly hit

  24   Tue Jan 7 11:50:34 2014 Markus FriedlInfineonscanrun018x10k07.01.2014 11:xx:xx07.01.2014 11:xx:xxGood

Delay scan with single sample

Several runs

ELOG V3.1.5-fc6679b