Thu Nov 5 19:34:58 2009, Stephan Hänsel, Measurements, Run 20065 - pedestal
|
18400 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front |
Thu Nov 5 19:36:48 2009, Stephan Hänsel, Measurements, Run 20069 - pedestal
|
13600 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front |
Thu Nov 5 19:44:28 2009, Stephan Hänsel, Measurements, Run 20070 - positionrun
|
2257 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front and 36mm above center position |
Thu Nov 5 19:46:15 2009, Stephan Hänsel, Measurements, Run 20073 - Micromegas 815
|
10070 events
with 2 Micromegas modules (TPCDAQ stopped at 9864 events)
Beam: 5,6 GeV |
Fri Nov 27 12:21:00 2009, Stephan Hänsel, Measurements, Run 20074 - Micromegas 816
|
10010 events
with 2 Micromegas modules (TPCDAQ stopped at 10003 events)
Beam: 5,6 GeV |
Fri Nov 27 12:22:19 2009, Stephan Hänsel, Measurements, Run 20075 - Micromegas 817
|
46196 events (usable: 42433 events)
with 2 Micromegas modules (TPCDAQ stopped at 46195 events)
Beam: 5,6 GeV |
Fri Nov 27 12:23:25 2009, Stephan Hänsel, Measurements, Run 20077 - Pedestal
|
16196 events
with 2 Micromegas modules
Beam: 5,6 GeV |
Wed Feb 25 09:57:15 2009, Stephan Hänsel, Measurements, Sensor IV-Kurven + CV-Messungen (vor Modulbau)
|
|
Fri Feb 27 14:03:53 2009, Stephan Hänsel, Setup, Setup 3D
|
|
Mon Nov 2 13:59:09 2009, Stephan Hänsel, Setup, ToDo before data-taking
|
in hut:
plug twisted pair cable from CCUM into PC (Attention - connector contains more pins, look at marks - use the most right pins when you
look from the back of the PC))
power on CCUM in spacing behind electronic hut
switch on opto-electrical converter for FED (on |
Thu Oct 22 08:04:51 2009, Stephan Hänsel, Setup, geometry - silicon envelope
|
distance si-sledge-front to silicon-Z-center = 23 cm
-> silicon sledge front 35 cm inside from front of TPC-support at a beam position 58 cm from front of TPC-support
|