Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Silicon Envelope for the Large Protoype TPC, Page 2 of 2  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
IDdown Date Author Type Subject Text Attachments
  11   Fri Oct 23 08:09:04 2009 Stephan HänselMeasurementsRun 11273 - dataB=0, TPC inbetween but no TPC readout
Beam: 3GeV
silicon position from TPC-support-ring: 
  
  10   Fri Oct 23 08:02:57 2009 Stephan HänselMeasurementsRun 11271 - position runB=0, TPC inbetween but no TPC readout
Beam: 3GeV
moved silicon to center position
  
  9   Fri Oct 23 07:57:01 2009 Stephan HänselMeasurementsRun 11270 - latency scanB=0, TPC inbetween but no TPC readout
scan from 70 to 120 with 1000 events
each
  
  8   Fri Oct 23 07:52:52 2009 Stephan HänselMeasurementsRun 11269 - Pedestal RunB=0, TPC inbetween but no TPC readout   
  7   Thu Oct 22 11:18:34 2009 Stephan HänselSetupPicturesPhoto
Gallery
zusätliche Photos:
  
  6   Thu Oct 22 08:04:51 2009 Stephan HänselSetupgeometry - silicon envelopedistance si-sledge-front to silicon-Z-center
= 23 cm
-> silicon sledge front 35 cm
 SiLC_in_front_of_TPC.jpg 
  5   Thu Oct 22 08:02:26 2009 Stephan HänselSetupElectronicsHV-Kapton-PIN-assignment

  
  
  4   Fri Feb 27 14:03:53 2009 Stephan HänselSetupSetup 3D   090227_TPCEnvelope-3D_copy.png 
  3   Fri Feb 27 13:34:11 2009 Stephan HänselMeasurementsARCs Noise PIoff + channels 2 repair 
 NoisePlot.png 
  2   Wed Feb 25 09:57:15 2009 Stephan HänselMeasurementsSensor IV-Kurven + CV-Messungen (vor Modulbau) 
 IV-Kurven_Sensors.png 
  1   Wed Oct 1 11:42:44 2008 stephan hänselSetupModulkomponentenMODULE 0
1 Sensor Module (SiLC01):
   Hybrid: TEC_6D.2.1 /
  
ELOG V3.1.5-fc6679b