Wed Nov 4 17:12:47 2009, Stephan Hänsel, Measurements, Run 20061 - Latency Scan -> 70
|
LATENCY IS SET TO 70
spillsize = 500
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front
HV: 200V -> 2µA
LV:
- 01,30 / 02,60 // 01.30 / 02.60
- 0,621 / 1,722 // 0,610 / 1,734
|
Wed Nov 4 18:19:44 2009, Stephan Hänsel, Measurements, Run 20062 - data
|
6493 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front
HV: 200V -> 2µA
LV:
- 01,30 / 02,60 // 01.30 / 02.60
- 0,621 / 1,722 // 0,610 / 1,734
|
Wed Nov 4 18:24:48 2009, Stephan Hänsel, Measurements, Run 20063 - Micromegas #808
|
crashed at 18577 events - TPC 19220 events
Beam: 5,6 GeV
one Micromegas module in center position
silicon sledge 35cm inside from TPC-support-front
HV: 200V -> 2µA
LV:
- 01,30 / 02,60 // 01.30 / 02.60
- 0,627 / 1,605 // 0,618 / 1,617
|
Thu Nov 5 19:33:53 2009, Stephan Hänsel, Measurements, Run 20064 - pedestal
|
12199 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front
HV: 100V -> 1µA
LV:
- 01,30 / 02,60 // 01.30 / 02.60
- 0,648 / 1,760 // 0,638 / 1,774
|
Thu Nov 5 19:34:58 2009, Stephan Hänsel, Measurements, Run 20065 - pedestal
|
18400 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front
HV: 200V -> 1,2µA
LV:
- 01,30 / 02,60 // 01.30 / 02.60
- 0,632 / 1,739 // 0,622 / 1,752
|
Thu Nov 5 19:36:48 2009, Stephan Hänsel, Measurements, Run 20069 - pedestal
|
13600 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front
HV: 200V -> 1,2µA
LV:
- 01,30 / 02,60 // 01.30 / 02.60
- 0,632 / 1,739 // 0,622 / 1,752
|
Thu Nov 5 19:44:28 2009, Stephan Hänsel, Measurements, Run 20070 - positionrun
|
2257 events without Micromegas
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front and 36mm above center position
- -> front Z: 5mm too far inside the gap
- -> back Z: 5mm too far outside the gap
HV: 200V -> 1,2µA
LV:
- 01,30 / 02,60 // 01.30 / 02.60
- 0,632 / 1,739 // 0,622 / 1,752
|
Thu Nov 5 19:46:15 2009, Stephan Hänsel, Measurements, Run 20073 - Micromegas 815
|
10070 events
with 2 Micromegas modules (TPCDAQ stopped at 9864 events)
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front and 36mm above center position
- -> front Z: 5mm too far inside the gap
- -> back Z: 5mm too far outside the gap
HV: 200V -> 1,2µA
LV:
- 01,30 / 02,60 // 01.30 / 02.60
- 0,632 / 1,739 // 0,622 / 1,752
|
Fri Nov 27 12:21:00 2009, Stephan Hänsel, Measurements, Run 20074 - Micromegas 816
|
10010 events
with 2 Micromegas modules (TPCDAQ stopped at 10003 events)
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front and 36mm above center position
- -> front Z: 5mm too far inside the gap
- -> back Z: 5mm too far outside the gap
rate: 4,1 Hz
HV: 200V -> 1,2µA
LV:
- 01,30 / 02,60 // 01.30 / 02.60
- 0,632 / 1,739 // 0,622 / 1,752
|
Fri Nov 27 12:22:19 2009, Stephan Hänsel, Measurements, Run 20075 - Micromegas 817
|
46196 events (usable: 42433 events)
with 2 Micromegas modules (TPCDAQ stopped at 46195 events)
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front and 36mm above center position
- -> front Z: 5mm too far inside the gap
- -> back Z: 5mm too far outside the gap
rate: 4,1 Hz
HV: 200V -> 1,2µA
LV:
- 01,30 / 02,60 // 01.30 / 02.60
- 0,632 / 1,739 // 0,622 / 1,752
|
Fri Nov 27 12:23:25 2009, Stephan Hänsel, Measurements, Run 20077 - Pedestal
|
16196 events
with 2 Micromegas modules
Beam: 5,6 GeV
silicon sledge 35cm inside from TPC-support-front and 36mm above center position
- -> front Z: 5mm too far inside the gap
- -> back Z: 5mm too far outside the gap
HV: 200V -> 1,2µA
LV:
- 01,30 / 02,60 // 01.30 / 02.60
- 0,632 / 1,739 // 0,622 / 1,752
|
|