ID Date Author Projectdown Subject Run Number Events XYPosition Cooling Data
  2   Wed Jun 3 10:48:42 2015 Benedikt WürknercommonNetworking    Unknown

WLAN Router:

SSID: Hephy

password: 20supersecret14

DHCP Range: 192.168.0.200 to 239

Netmask: /24

DNS Server: 192.168.0.254

Gateway: 192.168.0.254

external IP: 128.141.174.109 (für diverse Port Forwardings)

 

Manuell vergebene IP Adressen bitte unbedingt Benni mitteilen oder/und in der folgenden Tabelle eintragen! 

IP/MAC Zuweisung:

IP Machine/Name intern Port Forwarding (aussen)
192.168.0.124 SVD Kenwood  VNC(5900)  VNC(9000)
192.168.0.11 SVD3 DAQ  VNC(5900)  VNC(9001)
192.168.0.12 TUX DAQ  VNC(5900), VNC(5901), SSH(22)  VNC(9009), VNC(9002), SSH(9003),
192.168.0.13 Belle XY Tisch    
192.168.0.14 TUXOA  SSH(22), VNC(5900)  SSH(9004), VNC(9012)
192.168.0.20 JTAG Server    
192.168.0.148 alixcool    
192.168.0.16 slowcontrol  VNC(5900)  VNC(9005)
192.168.0.144 CAEN Power supply    
192.168.0.17 zenpixelwiki  SSH(22), VNC(5900)  SSH(9006), VNC(9008)
192.168.0.18 TLU (pcx25042, XY)  VNC(5900)  VNC(9007)
192.168.0.19 Cooling control PC VNC(5900) VNC(9011)
192.168.0.240 NI GPIB - ENET / 1000    
192.168.0.150 Printserver  VNC(5900)  VNC(9010)
       
137.138.113.254 Aida PC   vnc(5900)

 

Admin Zugang Wlan Router:

IP: 192.168.0.254

Username: admin

password: Hephy2014

 

  50   Mon Jun 8 11:33:24 2015 Thomas Bergauercommonbeam profile    Unknown

120GeV hadrons, beam config H6A.BELLE.003

Attachment 1: Beamprofile.png
Beamprofile.png
  1   Tue May 12 10:27:39 2015 Benedikt WürknerSVD3 (H6B)Setup information    Unknown

Information concerning the SVD3 setup during a beam test

In the beam area setup the whole crate and the power supply with the usual spider cable and the two Keithly 2410 high voltage supplies. Monitoring of the 2410 happens via a NI MAX interface that connects to the GPIB-Ethernet interface and needs to be configured there. The IP and password are noted on the device. The software can be found on heros in medialib/LONGTERM/longterm R3.1_doubleSided as a normal *.vi file. 

Default adresses 16 and 17 as defined in labview, need to figure out on site which is which, if the voltage selected (e.g. 100V) is applied as +50/-50 or if it is applied as +100/-100 before connecting the cables. 

Take a run without dut as well to check the telescope integrity. Without dut in beamline!!!!!

Attachment 1: spider-config.jpg
spider-config.jpg
  9   Thu Jun 4 18:49:03 2015 Benedikt WürknerSVD3 (H6B)Setup    Unknown
Attachment 1: IMG_20150604_184442.jpg
IMG_20150604_184442.jpg
Attachment 2: IMG_20150604_184451.jpg
IMG_20150604_184451.jpg
Attachment 3: IMG_20150604_184516.jpg
IMG_20150604_184516.jpg
  20   Sat Jun 6 16:14:36 2015 Benedikt WürknerSVD3 (H6B)calibration run and setup informationcal01   Unknown

Calibration Run with +- 50V Bias with higher compliance since the p-side draws more current than expected (23muA by the MAMBO)

 

  21   Sat Jun 6 16:17:52 2015 Benedikt WürknerSVD3 (H6B)hardware runhw0025000  Good

Table: 100:70

Bias: +-50V

Run to confirm trigger delay

  22   Sat Jun 6 16:18:48 2015 Benedikt WürknerSVD3 (H6B)hardware runhw00350000  Unknown

Table: 100:70

Bias: +-50V

Run to confirm trigger delay

  24   Sat Jun 6 21:00:15 2015 Benedikt WürknerSVD3 (H6B)first hardware run with TLU and Telescopehw004117171  Unknown

Table: 100:70

Bias: +-50V

600 pedestal

0 offset (at the beginning)

Started APVDAQ and waited till 600 were taken then started EUDAQ

EUDAQ Run 21

Mimosa Thresholds lvl 6

  26   Sun Jun 7 00:58:33 2015 Benedikt WürknerSVD3 (H6B)hardware runhw006   Crap

Table: 100:70

Bias: +-50V

600 pedestal

0 offset (at the beginning)

Started APVDAQ and waited till 600 were taken then started EUDAQ

EUDAQ Run 24

Mimosa Thresholds lvl 7

  29   Sun Jun 7 11:38:04 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw00715000  Good

TLU Run 46

Threshold 8b

Offset 601

  30   Sun Jun 7 12:10:24 2015 Benedikt WürknerSVD3 (H6B)Telescope Threshold8b test run 004614399  Unknown

Telescope in combination with SVD3

  31   Sun Jun 7 12:11:42 2015 Benedikt WürknerSVD3 (H6B)Telescope Threshold7 test run 004738175  Unknown

Telescope alone

  32   Sun Jun 7 12:12:00 2015 Benedikt WürknerSVD3 (H6B)Telescope Threshold7 test run 004853356  Unknown

Telescope alone

  33   Sun Jun 7 13:18:20 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw008536701NoGood

FIRST GOOD RUN WITH SVD3 plus telescope

EUDET Run 49

Mimosa Threshold 7

Offset APVDAQ-TLU Event number: 601

Pos 1: x=100 mm, y=79 mm (Hits in APV 3 und 8-9 in p-Seite und 14 und 17 in n-Seite)

  36   Sun Jun 7 14:44:29 2015 Thomas BergauerSVD3 (H6B)XY Stage and DUT Positions    Unknown

Coordinate system:

pos x-Direction = Jura side

pos y-Direction = Down

Zero-point is in the top right corner in Beam direction

 

absolute Position of PI Stages:

Pos 1: x=100 mm, y=79 mm (Hits in APV 3 und 8-9 in p-Seite und 14 und 17 in n-Seite )

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 

Pos 3: x=38.6 mm, y=84 mm

Pos 4: x=130.7 mm, y=84 mm

Pos 5: x=30.5 mm, y= 99.74 mm (wide side top)

Pos 6: x=136.08 mm, y= 91.49 mm (narrow side top)

Pos 7: x= 30.5 mm, y= 79 mm (wide side center)

Pos 8: x=136.08 mm, y= 79 mm (narrow side center)

Pos 9: x=30.5 mm, y= 60.67 mm (wide side down)

Pos 10: x= 136.08mm, y=68.9 mm (narrow side down)

Attachment 1: FWD-BWD.PNG
FWD-BWD.PNG
Attachment 2: apv-numbering.jpg
apv-numbering.jpg
Attachment 3: FWD-BWD_Bemaßung.PNG
FWD-BWD_Bemaßung.PNG
  37   Sun Jun 7 15:03:31 2015 Thomas BergauerSVD3 (H6B)hardware run with TLU and Telescopehw050500002NoGood

RUN WITH SVD3 plus telescope

EUDET Run 50

Mimosa Threshold 7

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 

  40   Sun Jun 7 20:03:09 2015 Thomas BergauerSVD3 (H6B)hardware run with TLU and Telescopehw051500003NoGood

RUN WITH SVD3 plus telescope

EUDET Run 51

Mimosa Threshold 7

Pos 3: x=38.6 mm, y=84 mm

  41   Sun Jun 7 20:03:31 2015 Thomas BergauerSVD3 (H6B)hardware run with TLU and Telescopehw052500004NoGood

RUN WITH SVD3 plus telescope

EUDET Run 52

Mimosa Threshold 7

Pos 4: x=130.7 mm, y=84 mm (hits auf APV 2 und (bisschen) 3, (bisschen) 8 und 9, 15 und 16

  42   Sun Jun 7 20:37:56 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw053500005 Good

RUN WITH SVD3 plus telescope

EUDET Run 53

Mimosa Threshold 6

Pos 5: x=30.5 mm, y= 99.74 mm (wide side top)

  45   Sun Jun 7 23:09:46 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw0541200006NoGood

RUN WITH SVD3 plus telescope

EUDET Run 54

Mimosa Threshold 6

Pos 6: x=136.08 mm, y= 91.49 mm (narrow side top)