Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015, Page 3 of 6  Not logged in ELOG logo
Entry  Tue Jun 9 20:32:46 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 008, 10000, , No, Good 

Room temp, fir004

Entry  Sat Jun 6 23:30:29 2015, Benedikt Würkner, Belle II FADC (H6A), Hardware, 009, , , , Good 

room temp, FIRRun002, PedestalRun005, room temp

target: FW, pos 9 (p-0, n-128*4)

Entry  Wed Jun 10 18:52:34 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 009, 10000, , Yes, Good temperature.PNG

temp: in -22 out -18,
FIRRun004,

Entry  Sun Jun 7 13:19:19 2015, Hao Yin, Belle II FADC (H6A), Hardware, 010, , , , Good 

cooled

FIRRun002, PedestalRun006 (temp enty)

target: BW, pos 1

Entry  Wed Jun 10 13:12:33 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 010, , , Yes, Good 

cooled
pedestalrun 008
FIRRun004

max frame pos = 1-2-3. frame n side still shifted

[six]
lvl = 15, 35
lat = 96
sam = 50
grp = 8

Entry  Sun Jun 7 13:21:15 2015, Hao Yin, Belle II FADC (H6A), Hardware, 011, 50000, , , Good Pos2.PNG

cooled (see attachment)

FIRRun002, PedestalRun006

target: -Z, pos 2

Entry  Thu Jun 11 11:41:50 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 011, , , Yes, Good 

cooled
pedestalrun 008
FIRRun004

max frame pos = 1-2-3. frame n side still shifted

[six]
lvl = 15, 35
lat = 96
sam = 50
grp = 8

Entry  Fri Jun 12 17:00:18 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 011, 10000, , No, Good 

cooled pedestal vaules for long sixlet cal

Entry  Sun Jun 7 15:59:05 2015, Hao Yin, Belle II FADC (H6A), Hardware, 012, 50000, , , Unknown Pos3.PNG

cooled (see attachment)

FIRRun002, PedestalRun006

target: CE, pos 2

cooling box emergency break ... ie about the last 1-10 k not useable.

Entry  Thu Jun 11 11:42:39 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 012, , , Yes, Good 

cooled until about 400k after that room temp
pedestalrun 009
FIRRun005

sixlet calibration run with only ladders

[six]
lvl = 0, 255
lat = 97
sam = 50
grp = 8

Entry  Fri Jun 12 17:03:02 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 012, 10000, , No, Good 

room temp
FIRRun002
 

Entry  Sun Jun 7 23:04:06 2015, Hao Yin, Belle II FADC (H6A), Hardware, 013, 50000, , , Good 

cooled (see attachment)

FIRRun002, PedestalRun006

target: CE, pos 3

cooling box emergency break ... ie about the last 1-10 k not useable.

Entry  Sun Jun 7 23:09:29 2015, Hao Yin, Belle II FADC (H6A), Hardware, 014, 224k, , , Good Pos4.png

cooled (see attachment) in - 20,5 out -7,8

FIRRun002, PedestalRun006

target: fw, pos 4

Entry  Mon Jun 8 09:21:01 2015, Hao Yin, Belle II FADC (H6A), Hardware, 015, 70000, 8, Yes, Good Pos8.PNG

cooled (see attachment) in - 21 out -18

FIRRun002, PedestalRun006

target: fw, pos 8

Entry  Mon Jun 8 14:48:27 2015, Hao Yin, Belle II FADC (H6A), Hardware, 016, ~96k, 9, Yes, Good 

cooled (see attachment) in --21.24 out -18-54

FIRRun002, PedestalRun006

target: fw, pos 9

Entry  Mon Jun 8 20:13:59 2015, Hao Yin, Belle II FADC (H6A), Hardware, 017, , 5, Yes, Good 

cooled (see attachment) in -21.24 out -18.54

cooling supply emty at ~24:00 ie first 30k is cooled.

FIRRun002, PedestalRun006

target: BW, pos 5

Entry  Tue Jun 9 09:57:56 2015, Hao Yin, Belle II FADC (H6A), Hardware, 019, 62k, 1, No, Good 

room temp

FIRRun002, PedestalRun007, Calibrationrun003

Entry  Tue Jun 9 20:36:39 2015, Hao Yin, Belle II FADC (H6A), Hardware, 020, 62k, , No, Good 

room temp

FIRRun004, PedestalRun008
telescope alignment

Entry  Wed Jun 10 19:07:42 2015, Hao Yin, Belle II FADC (H6A), Hardware, 021, , 5, Yes, Good 

temp: in -23 out -20

FIRRun002,
PedestalRun010,
Calibrationrun002

taget: BW

Entry  Thu Jun 11 16:35:14 2015, Hao Yin, Belle II FADC (H6A), Hardware, 022, , 5, Yes, Good 

temp: in -23 out -20

FIRRun002,
PedestalRun010,
Calibrationrun002

taget: BW, pos 5

ELOG V3.1.5-fc6679b