Entry  Wed Jun 10 18:52:34 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 009, 10000, , Yes, Good temperature.PNG

temp: in -22 out -18,
FIRRun004,

Entry  Wed Jun 10 19:07:42 2015, Hao Yin, Belle II FADC (H6A), Hardware, 021, , 5, Yes, Good 

temp: in -23 out -20

FIRRun002,
PedestalRun010,
Calibrationrun002

taget: BW

Entry  Thu Jun 11 11:41:50 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 011, , , Yes, Good 

cooled
pedestalrun 008
FIRRun004

max frame pos = 1-2-3. frame n side still shifted

[six]
lvl = 15, 35
lat = 96
sam = 50
grp = 8

Entry  Thu Jun 11 11:42:39 2015, Hao Yin, Belle II FADC (H6A), Sixlet Calibration, 012, , , Yes, Good 

cooled until about 400k after that room temp
pedestalrun 009
FIRRun005

sixlet calibration run with only ladders

[six]
lvl = 0, 255
lat = 97
sam = 50
grp = 8

Entry  Thu Jun 11 16:35:14 2015, Hao Yin, Belle II FADC (H6A), Hardware, 022, , 5, Yes, Good 

temp: in -23 out -20

FIRRun002,
PedestalRun010,
Calibrationrun002

taget: BW, pos 5

Entry  Thu Jun 11 16:38:17 2015, Hao Yin, Belle II FADC (H6A), Hardware, 023, , 7, Yes, Good Pos7.PNG

temp: attachment (in 1st col, out 2nd col)

FIRRun002,
PedestalRun010,
Calibrationrun002

taget: CE, pos 7

Entry  Thu Jun 11 18:01:54 2015, Hao Yin, Belle II FADC (H6A), Hardware, 024, , 6, Yes, Good Pos6.PNG

temp: attachment (in 1st col, out 2nd col)

FIRRun002,
PedestalRun010,
Calibrationrun002

taget: -z, pos 6

Entry  Thu Jun 11 18:37:11 2015, Hao Yin, Belle II FADC (H6A), Hardware, 025, , 6, Yes, Good pos3.PNG

temp: attachment (in 1st col, out 2nd col)

FIRRun002,
PedestalRun010,
Calibrationrun002

taget: ce, pos 3

Entry  Fri Jun 12 09:31:58 2015, Hao Yin, Belle II FADC (H6A), FIR, 005, , , Yes, Good 

FIR filer and ADC delay for long sixlet cal run.

Entry  Fri Jun 12 17:00:18 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 011, 10000, , No, Good 

cooled pedestal vaules for long sixlet cal

Entry  Fri Jun 12 17:03:02 2015, Hao Yin, Belle II FADC (H6A), Pedestal, 012, 10000, , No, Good 

room temp
FIRRun002
 

Entry  Fri Jun 12 17:11:45 2015, Hao Yin, Belle II FADC (H6A), Hardware, 026, 50k, 1, No, Good 

room temp

FIRRun002,
PedestalRun012,
CalibrationRun003

L3 rotated.
taget: bw, pos 1
 

Entry  Sat Jun 13 09:09:37 2015, Hao Yin, Belle II FADC (H6A), Hardware, 027, ~200k, 2, No, Good 

room temp

FIRRun002,
PedestalRun012,
CalibrationRun003

L3 rotated.
taget: CE, pos 1
 

Entry  Sat Jun 13 10:07:36 2015, Hao Yin, Belle II FADC (H6A), Hardware, 028, 50k, 4, No, Good 

room temp

FIRRun002,
PedestalRun012,
CalibrationRun003

L3 rotated.
taget: FW, pos 4
 

Entry  Sat Jun 13 13:01:39 2015, Hao Yin, Belle II FADC (H6A), Hardware, 029, , 3, No, Good 

room temp

FIRRun002,
PedestalRun012,
CalibrationRun003

L3 rotated.
taget: CE, pos 3
 

Entry  Sat Jun 13 19:26:26 2015, Hao Yin, Belle II FADC (H6A), Hardware, 030, , 3, No, Good 

room temp

FIRRun002,
PedestalRun012,
CalibrationRun003

wo L3 and L4
taget: CE, pos 3
 

Entry  Sat Jun 13 19:29:50 2015, Hao Yin, Belle II FADC (H6A), Hardware, 030, , 1, No, Good 

room temp

FIRRun002,
PedestalRun012,
CalibrationRun003

wo L3 and L4
taget: bw, pos 1
 

Entry  Tue May 12 10:27:39 2015, Benedikt Würkner, SVD3 (H6B), Setup information, , , , , Unknown spider-config.jpg

Information concerning the SVD3 setup during a beam test

In the beam area setup the whole crate and the power supply with the usual spider cable and the two Keithly 2410 high voltage supplies. Monitoring of the 2410 happens via a NI MAX interface that connects to the GPIB-Ethernet interface and needs to be configured there. The IP and password are noted on the device. The software can be found on heros in medialib/LONGTERM/longterm R3.1_doubleSided as a normal *.vi file. 

Default adresses 16 and 17 as defined in labview, need to figure out on site which is which, if the voltage selected (e.g. 100V) is applied as +50/-50 or if it is applied as +100/-100 before connecting the cables. 

Take a run without dut as well to check the telescope integrity. Without dut in beamline!!!!!

Entry  Thu Jun 4 18:49:03 2015, Benedikt Würkner, SVD3 (H6B), Setup, , , , , Unknown IMG_20150604_184442.jpgIMG_20150604_184451.jpgIMG_20150604_184516.jpg
 
Entry  Sat Jun 6 16:14:36 2015, Benedikt Würkner, SVD3 (H6B), calibration run and setup information, cal01, , , , Unknown 

Calibration Run with +- 50V Bias with higher compliance since the p-side draws more current than expected (23muA by the MAMBO)

 