Wed Jun 3 10:48:42 2015, Benedikt Würkner, common, Networking, , , , , Unknown
|
WLAN Router:
SSID: Hephy
password: 20supersecret14
DHCP Range: 192.168.0.200 to 239 |
Mon Jun 8 11:33:24 2015, Thomas Bergauer, common, beam profile, , , , , Unknown
|
120GeV hadrons, beam config H6A.BELLE.003 |
Tue May 12 10:27:39 2015, Benedikt Würkner, SVD3 (H6B), Setup information, , , , , Unknown
|
Information concerning the SVD3 setup during a beam test
In the beam area setup the whole crate and the power supply with the usual spider cable and the two Keithly 2410 high voltage supplies.
Monitoring of the 2410 happens via a NI MAX interface that connects to the GPIB-Ethernet interface and needs to be configured there. The IP and password |
Thu Jun 4 18:49:03 2015, Benedikt Würkner, SVD3 (H6B), Setup, , , , , Unknown
|
|
Sat Jun 6 16:14:36 2015, Benedikt Würkner, SVD3 (H6B), calibration run and setup information, cal01, , , , Unknown
|
Calibration Run with +- 50V Bias with higher compliance since the p-side draws more current than expected (23muA by the MAMBO)
|
Sat Jun 6 16:17:52 2015, Benedikt Würkner, SVD3 (H6B), hardware run, hw002, 5000, , , Good
|
Table: 100:70
Bias: +-50V
Run to confirm trigger delay |
Sat Jun 6 16:18:48 2015, Benedikt Würkner, SVD3 (H6B), hardware run, hw003, 50000, , , Unknown
|
Table: 100:70
Bias: +-50V
Run to confirm trigger delay |
Sat Jun 6 21:00:15 2015, Benedikt Würkner, SVD3 (H6B), first hardware run with TLU and Telescope, hw004, 117171, , , Unknown
|
Table: 100:70
Bias: +-50V
600 pedestal |
Sun Jun 7 00:58:33 2015, Benedikt Würkner, SVD3 (H6B), hardware run, hw006, , , , Crap
|
Table: 100:70
Bias: +-50V
600 pedestal |
Sun Jun 7 11:38:04 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw007, 15000, , , Good
|
TLU Run 46
Threshold 8b
Offset 601 |
Sun Jun 7 12:10:24 2015, Benedikt Würkner, SVD3 (H6B), Telescope Threshold8b test run , 0046, 14399, , , Unknown
|
Telescope in combination with SVD3 |
Sun Jun 7 12:11:42 2015, Benedikt Würkner, SVD3 (H6B), Telescope Threshold7 test run , 0047, 38175, , , Unknown
|
Telescope alone |
Sun Jun 7 12:12:00 2015, Benedikt Würkner, SVD3 (H6B), Telescope Threshold7 test run , 0048, 53356, , , Unknown
|
Telescope alone |
Sun Jun 7 13:18:20 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw008, 53670, 1, No, Good
|
FIRST GOOD RUN WITH SVD3 plus telescope
EUDET Run 49
Mimosa Threshold 7 |
Sun Jun 7 14:44:29 2015, Thomas Bergauer, SVD3 (H6B), XY Stage and DUT Positions, , , , , Unknown
|
Coordinate system:
pos x-Direction = Jura side
pos y-Direction = Down |
Sun Jun 7 15:03:31 2015, Thomas Bergauer, SVD3 (H6B), hardware run with TLU and Telescope, hw050, 50000, 2, No, Good
|
RUN WITH SVD3 plus telescope
EUDET Run 50
Mimosa Threshold 7 |
Sun Jun 7 20:03:09 2015, Thomas Bergauer, SVD3 (H6B), hardware run with TLU and Telescope, hw051, 50000, 3, No, Good
|
RUN WITH SVD3 plus telescope
EUDET Run 51
Mimosa Threshold 7 |
Sun Jun 7 20:03:31 2015, Thomas Bergauer, SVD3 (H6B), hardware run with TLU and Telescope, hw052, 50000, 4, No, Good
|
RUN WITH SVD3 plus telescope
EUDET Run 52
Mimosa Threshold 7 |
Sun Jun 7 20:37:56 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw053, 50000, 5, , Good
|
RUN WITH SVD3 plus telescope
EUDET Run 53
Mimosa Threshold 6 |
Sun Jun 7 23:09:46 2015, Benedikt Würkner, SVD3 (H6B), hardware run with TLU and Telescope, hw054, 120000, 6, No, Good
|
RUN WITH SVD3 plus telescope
EUDET Run 54
Mimosa Threshold 6 |
|