Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle testbeam at SPS in June 2015, Page 1 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Project Subject Run Numberdown Events XYPosition Cooling Data
  57   Mon Jun 8 18:00:06 2015 Benedikt WürknerSVD3 (H6B)Hardware FEI4hw061500002NoUnknown

RUN WITH SVD3, telescope and FEI4

EUDET Run 61

Mimosa Threshold 6

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 

  51   Mon Jun 8 11:57:14 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw0585000010NoGood

RUN WITH SVD3 plus telescope

EUDET Run 58

Mimosa Threshold 6

Pos 10: x= 136.08mm, y=68.9 mm (narrow side down)

  49   Mon Jun 8 10:47:44 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw057500009NoGood

RUN WITH SVD3 plus telescope

EUDET Run 57

Mimosa Threshold 6

Pos 9: x=30.5 mm, y= 60.67 mm (wide side down)

  48   Mon Jun 8 09:37:30 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw056500008NoGood

RUN WITH SVD3 plus telescope

EUDET Run 56

Mimosa Threshold 6

Pos 8: x=136.08 mm, y= 79 mm (narrow side center)

  46   Mon Jun 8 01:28:58 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw0554100007NoGood

RUN WITH SVD3 plus telescope

EUDET Run 55

Mimosa Threshold 6

Pos 7: x= 30.5 mm, y= 79 mm (wide side center)

  45   Sun Jun 7 23:09:46 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw0541200006NoGood

RUN WITH SVD3 plus telescope

EUDET Run 54

Mimosa Threshold 6

Pos 6: x=136.08 mm, y= 91.49 mm (narrow side top)

  42   Sun Jun 7 20:37:56 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw053500005 Good

RUN WITH SVD3 plus telescope

EUDET Run 53

Mimosa Threshold 6

Pos 5: x=30.5 mm, y= 99.74 mm (wide side top)

  41   Sun Jun 7 20:03:31 2015 Thomas BergauerSVD3 (H6B)hardware run with TLU and Telescopehw052500004NoGood

RUN WITH SVD3 plus telescope

EUDET Run 52

Mimosa Threshold 7

Pos 4: x=130.7 mm, y=84 mm (hits auf APV 2 und (bisschen) 3, (bisschen) 8 und 9, 15 und 16

  40   Sun Jun 7 20:03:09 2015 Thomas BergauerSVD3 (H6B)hardware run with TLU and Telescopehw051500003NoGood

RUN WITH SVD3 plus telescope

EUDET Run 51

Mimosa Threshold 7

Pos 3: x=38.6 mm, y=84 mm

  37   Sun Jun 7 15:03:31 2015 Thomas BergauerSVD3 (H6B)hardware run with TLU and Telescopehw050500002NoGood

RUN WITH SVD3 plus telescope

EUDET Run 50

Mimosa Threshold 7

Pos 2: x=69.3 mm, y=79 mm (Hits in APV 3-4 und 8-9 in p-Seite und 13 und 18 in n-Seite) 

  33   Sun Jun 7 13:18:20 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw008536701NoGood

FIRST GOOD RUN WITH SVD3 plus telescope

EUDET Run 49

Mimosa Threshold 7

Offset APVDAQ-TLU Event number: 601

Pos 1: x=100 mm, y=79 mm (Hits in APV 3 und 8-9 in p-Seite und 14 und 17 in n-Seite)

  29   Sun Jun 7 11:38:04 2015 Benedikt WürknerSVD3 (H6B)hardware run with TLU and Telescopehw00715000  Good

TLU Run 46

Threshold 8b

Offset 601

  26   Sun Jun 7 00:58:33 2015 Benedikt WürknerSVD3 (H6B)hardware runhw006   Crap

Table: 100:70

Bias: +-50V

600 pedestal

0 offset (at the beginning)

Started APVDAQ and waited till 600 were taken then started EUDAQ

EUDAQ Run 24

Mimosa Thresholds lvl 7

  24   Sat Jun 6 21:00:15 2015 Benedikt WürknerSVD3 (H6B)first hardware run with TLU and Telescopehw004117171  Unknown

Table: 100:70

Bias: +-50V

600 pedestal

0 offset (at the beginning)

Started APVDAQ and waited till 600 were taken then started EUDAQ

EUDAQ Run 21

Mimosa Thresholds lvl 6

  22   Sat Jun 6 16:18:48 2015 Benedikt WürknerSVD3 (H6B)hardware runhw00350000  Unknown

Table: 100:70

Bias: +-50V

Run to confirm trigger delay

  21   Sat Jun 6 16:17:52 2015 Benedikt WürknerSVD3 (H6B)hardware runhw0025000  Good

Table: 100:70

Bias: +-50V

Run to confirm trigger delay

  20   Sat Jun 6 16:14:36 2015 Benedikt WürknerSVD3 (H6B)calibration run and setup informationcal01   Unknown

Calibration Run with +- 50V Bias with higher compliance since the p-side draws more current than expected (23muA by the MAMBO)

 

  106   Sat Jun 13 19:14:41 2015 Benedikt WürknerSVD3 (H6B)L3 with FEI4867320003NoGood

L3 sensor at position x: 115, y: 57 hitting apvs: 1&2 on p-side and apv 3&4 on n-side

  105   Sat Jun 13 18:02:04 2015 Benedikt WürknerSVD3 (H6B)L3 with FEI485700002NoGood

L3 sensor at position x: 115, y: 47 hitting apvs: 2&3 on p-side and apv 3&4 on n-side

  104   Sat Jun 13 17:05:35 2015 Benedikt WürknerSVD3 (H6B)L3 with FEI484300001NoGood

L3 sensor at position x: 105, y: 47 hitting apvs: 2&3 on p-side and apv 3 on n-side

ELOG V3.1.5-fc6679b