Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle/Infineon/AIDA testbeam at SPS in Nov 2014, Page 2 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Project Subject Run Number Events StartTimedown EndTime Data Text Attachments
  118   Sun Nov 23 15:13:37 2014 Markus FriedlBelle SVDHardwareRun00310060023.11.2014 14:07:2323.11.2014 16:51:27GoodHardware run, hitting APVs 0/1 on p-sides,
1/2 on n-sides
EUDAT telescope running with difference
  
Entry is currently edited by Thomas Bergauer on 193.170.243.91    120   Sun Nov 23 17:51:44 2014 Benedikt WürknerBelle SVDHardwareRun04610000020:0620:36UnknownHardware Run +-60V Bias
Room Temperature
Pedestal 018 (again marked all the
  
  106   Sun Nov 23 01:37:42 2014 Hao YinBelle SVDHardwareRun040200002014-11-23 01:37:00 UnknownBias voltage set to +-80V
Pedestal_015 (cooled) 

p, li {
  
  93   Sat Nov 22 11:37:16 2014 Benedikt WürknerBelle SVDHardwareRun0364503782014-11-22 1:00:002014-11-22 10:27:54Unknown Not completely cooled since cooling
failed at 1:42 in the night
Bias voltage set to +-60V
 SPS_Testbeam-Temp.xlsxScreen_Shot_2014-11-22_at_12.41.44.png 
  94   Sat Nov 22 15:31:49 2014 Hao YinBelle SVDHardwareRun038437882014-11-22 15:18:40 UnknownCooled down to -20
Bias voltage set to +-60V
Pedestal_013 (cooled)
  
  105   Sun Nov 23 01:05:43 2014 Hao YinBelle SVDHardwareRun039200002014-11-22 15:18:40 CrapCooled down to -20
Bias voltage set to +-80V
Pedestal_013 (cooled)
  
  73   Fri Nov 21 15:07:24 2014 Benedikt WürknerBelle SVDHardwareRun0191509482014-11-21 02:41:552014-11-21 10:11:02Unknowncooled see appendix (FirRun003)
PedestalRun_010
multi 6 Raw Mode
  
  1   Fri Nov 14 19:01:27 2014 Thomas BergauercommonAdministrative Procedures for Departure    UnknownWednesday:
* Transport request starten (I do
not need any transport service) von 887 nach
 Merchandise-2014.pdfankunftsbestaetigung.pdf 
  2   Fri Nov 14 19:22:40 2014 Martin Kurzcommonip addresses, portforwarding, wlan    UnknownWLAN Router:

SSID:
Hephy

password: 20supersecret14
  
  3   Fri Nov 14 19:47:25 2014 Thomas Bergauer Telefonnummern    Unknown* CCC (zentraler Beschleuniger-Kontrollraum):
77500
* H6A Controlroom: 76755
  
  4   Fri Nov 14 19:49:04 2014 Florian BuchsteinercommonBelle Setup    Unknown   SPS_2014_Testbeam_-_Belle_Setup-Model.pdf 
  5   Fri Nov 14 19:52:12 2014 Thomas Bergauer important web pages    UnknownSPS Accelerator status:  http://op-webtools.web.cern.ch/op-webtools/vistar/vistars.php?usr=SPS1
general Information about the Beam
  
  6   Sat Nov 15 11:36:41 2014 Thomas BergauercommonChecklist for North Area access    Unknown 
  
  7   Sat Nov 15 11:37:19 2014 Thomas BergauerAIDAList of EUDET Telescope PCs in H6b    Unknown https://twiki.cern.ch/twiki/bin/view/CLIC/ClicPixelDataTakingCERNPS2014   
  8   Sat Nov 15 12:41:50 2014 Benedikt WürknerBelle SVDDiscoveries during preliminary sensor tests    UnknownL5_p_side APV #3 faulty signal
L4_n_side APV #2 and #3 faulty signal
 weird_signal.pngfaulty-signal-l4_n.pngfaulty-signal_l4_n_2.png 
  9   Sun Nov 16 14:22:51 2014 Thomas BergauerAIDAPC Configuration EUDET Telescope in H6b    UnknownPC (gehört AIDA) in H6b control room:  ssh
telescope@
  
  10   Sun Nov 16 21:37:56 2014 Hao YincommonAIM    Unknownfachi:  aimhephy@antispam.e4ward.com
chrisu:  gargamel0971
flo: flo.bux@sbg.at
  
  11   Mon Nov 17 19:23:57 2014 Thomas BergauerInfineonPI XY table initial position    Unknowninitial position of Infineon Stack (PI
Micromove):
(guess center position by eye)
  
  12   Mon Nov 17 22:03:02 2014 Martin KurzcommonDrucker    UnknownDrucken über den Printserver
(192.168.0.150):
 
  
  28   Tue Nov 18 12:35:32 2014 Axel KönigcommonInfineon (4 modules) TLU Settings    Unknown
     VNC
to 192.168.0.18
  
ELOG V3.1.5-fc6679b