  Belle/Infineon/AIDA testbeam at SPS in Nov 2014, Page 1 of 6  Not logged in ELOG logo
Entry  Wed Nov 19 22:59:24 2014, Hao Yin, Belle SVD, CalibrationRun_004, , , , , Crap 

cooled (see last calibration run)

Latest noise, FIRfilter settings. 

 

Failed due to VME read timeout.

Entry  Thu Nov 20 11:13:44 2014, Hao Yin, , HardwareRun_008, 008, , , , Crap 

cooled see attachment in FIRRun_003

PedestalRun_009

CalibrationRun_005

zerosuppressed

Entry  Thu Nov 20 11:14:19 2014, Benedikt Würkner, , HardwareRun_009, 009, , , , Crap 

 cooling see attachment of FIRRun003

Ped 009

Cal 005

Multi 6 raw mode

L5_n_side out of order

 

FIFO_FULL_ERROR starting at ~2000 events

Entry  Thu Nov 20 15:32:33 2014, Hao Yin, , HardwareRun, 010, , , , Crap 

same as hardware run 009

FIFO FULL ERROR starting at ~event 5000

Entry  Thu Nov 20 16:13:18 2014, Hao Yin, Belle SVD, HardwareRun, 011, , , , Crap 

cooled see appendix (FirRun003)

PedestalRun_009

multi 6 Raw Mode

FIFO size increased

 

 

FIFO FULL at  event ~27000

Entry  Fri Nov 21 15:10:19 2014, Benedikt Würkner, , HardwareRun, 15-22 (exept 19) , none, , , Crap 
 
Entry  Sun Nov 23 01:05:43 2014, Hao Yin, Belle SVD, HardwareRun, 039, 20000, 2014-11-22 15:18:40, , Crap 

Cooled down to -20

Bias voltage set to +-80V

Pedestal_013 (cooled)

Noisefile: HardwareRun_036.noi

 

Entry  Mon Nov 17 22:21:41 2014, Hao Yin, , FIR run, 001, , Mon Nov 17 22:08:29 CET 2014, , Good 

Excellent, brilliant run. 

Entry  Thu Nov 20 22:11:06 2014, Hao Yin, Belle SVD, HardwareRun, 012, , , , Good 

cooled see appendix (FirRun003)

PedestalRun_009

multi 6 Raw Mode

FIFO size increased

Entry  Fri Nov 21 19:42:36 2014, Hao Yin, , HardwareRun_033, , , , , Good Temp_21-11-14.PNG

L6 are swapped, needs to be corrected later in the offline analysis.

cooled at -25

latest ADC delay and FIRRun

PedestalRun_012

CalibrationRun_006

100k trigger dead time

 

Need to change L6n apv definition to:

mod = 9,0,1,1,1,m,29,0,0,0,0,0,0,L6_n_side

apv = 9,1,34,3,30,x,0,0,5,1,7,0,0,x
apv = 9,0,36,3,50,x,0,0,5,1,6,0,0,x
apv = 9,3,38,3,30,x,0,0,5,1,9,0,0,x
apv = 9,2,40,3,30,x,0,0,5,1,8,0,0,x

to  get the right mapping of the sensor.

Entry  Sun Nov 23 15:09:53 2014, Markus Friedl, Belle SVD, PedestalRun, 001, 10000, , , Good 

Initial pedestal run with SVD3 setup and WedgeOld, FW993, BW993 (reading out 4 chips on every p-side)

Entry  Sun Nov 23 15:10:42 2014, Markus Friedl, Belle SVD, CalibrationRun, 001, 83400, , , Good 

Initial calibration run with SVD3 setup and WedgeOld, FW993, BW993 (reading out 4 chips on every p-side)

Entry  Sun Nov 23 15:13:37 2014, Markus Friedl, Belle SVD, HardwareRun, 003, 100600, 23.11.2014 14:07:23, 23.11.2014 16:51:27, Good 

Hardware run, hitting APVs 0/1 on p-sides, 1/2 on n-sides

EUDAT telescope running with difference of 2 events

Entry  Sun Nov 23 16:55:37 2014, Markus Friedl, Belle SVD, HardwareRun, 004, 60600, 23.11.2014 16:51:49, 23.11.2014 18:23:54, Good 

Hardware run, hitting APVs 1/2 on p-sides, 1/2 on n-sides

EUDAT telescope running with difference of 2 events

Entry  Sun Nov 23 18:26:54 2014, Markus Friedl, Belle SVD, HardwareRun, 005, 60600, 23.11.2014 18:24:34, 23.11.2014 , Good 

Hardware run, hitting APVs 2/3 on p-sides, 1/2 on n-sides

EUDAT telescope running with difference of 2 events

Entry  Fri Nov 14 19:01:27 2014, Thomas Bergauer, common, Administrative Procedures for Departure, , , , , Unknown Merchandise-2014.pdfankunftsbestaetigung.pdf

Wednesday:

* Transport request starten (I do not need any transport service) von 887 nach Wien. Das triggert automatisch die Radio Protection Leute. Der EDH Request hängt dann bei irgend einem Franzosen. Den bitte anrufen und für Montag mittags einen Termin ausmachen. Es muss alles geschnüffelt werden, was in der Zone war (also nicht im Counting room)

Merchandise-Bestätigung für die Anreise ist im attachment!

 

Anreise: https://edh.cern.ch/Document/SupplyChain/SHIP/5855845

Abreise: https://edh.cern.ch/Document/SupplyChain/SHIP/5863835

Entry  Fri Nov 14 19:22:40 2014, Martin Kurz, common, ip addresses, portforwarding, wlan, , , , , Unknown 

WLAN Router:

SSID: Hephy

password: 20supersecret14

DHCP Range: 192.168.0.200 to 239

Netmask: /24

DNS Server: 192.168.0.254

Gateway: 192.168.0.254

external IP: 128.141.61.16 (für diverse Port Forwardings)

 

Manuell vergebene IP Adressen bitte unbedingt Martin Kurz mitteilen oder/und in der folgenden Tabelle eintragen! 

IP/MAC Zuweisung:

IP Machine/Name intern Port Forwarding (aussen)
192.168.0.10 SVD Kenwood  VNC(5900)  VNC(9000)
192.168.0.11 AIDA DAQ  VNC(5900)  VNC(9001)
192.168.0.12 TUX DAQ  VNC(5900), VNC(5901), SSH(22)  VNC(9009), VNC(9002), SSH(9003),
192.168.0.13 Belle XY Tisch    
192.168.0.14 TUXOA  SSH(22)  SSH(9004)
192.168.0.15 JTAG Server    
192.168.0.148 alixcool    
192.168.0.16 slowcontrol  VNC(5900)  VNC(9005)
192.168.0.144 CAEN Power supply    
192.168.0.17 zenpixelwiki  SSH(22), VNC(5900)  SSH(9006), VNC(9008)
192.168.0.18 TLU (pcx25042, XY)  VNC(5900)  VNC(9007)
192.168.0.240 NI GPIB - ENET / 1000    
192.168.0.150 Printserver  VNC(5900)  VNC(9010)
       
       

 

Admin Zugang Wlan Router:

IP: 192.168.0.254

Username: admin

password: Hephy2014

 

Entry  Fri Nov 14 19:47:25 2014, Thomas Bergauer, , Telefonnummern, , , , , Unknown 

* CCC (zentraler Beschleuniger-Kontrollraum): 77500

* H6A Controlroom: 76755

* HEPHY-Handy: 16-2471 or +41 76 487 2471 from outside of CERN

* Office in Meyrin: 12-R11: 74592

 

Hostel-Zimmern:

* Bergi: 79326

* Benni: 60232

* Hao: 70408

 

Andere Wichtige Leute:

* Beam-Dame: Edda Gschwendner 16-5080

* NA Hallen Verantwortlicher: Michael Jeckel

Lookup Telefonnummern: http://phonebook.cern.ch

 
Entry  Fri Nov 14 19:49:04 2014, Florian Buchsteiner, common, Belle Setup, , , , , Unknown SPS_2014_Testbeam_-_Belle_Setup-Model.pdf
 
Entry  Fri Nov 14 19:52:12 2014, Thomas Bergauer, , important web pages, , , , , Unknown 

SPS Accelerator status:  http://op-webtools.web.cern.ch/op-webtools/vistar/vistars.php?usr=SPS1

general Information about the Beam line(s): http://sba.web.cern.ch/sba/