Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle/Infineon/AIDA testbeam at SPS in Nov 2014, Page 1 of 6  Not logged in ELOG logo
ID Date Author Project Subject Run Number Events StartTimedown EndTime Data
  32   Tue Nov 18 18:45:01 2014 Hao YinBelle SVDTrigger Delay scan  Tue Nov 18 18:21:50 CET 2014 Unknown

At room temperature

First run was at: 23 (no track)

 

TimingRun_001:

Trigger delay: 26

 

TimingRun_002:

Trigger delay: 29

 

TimingRun_003:

Trigger delay: 32


 

TimingRun_004:

Trigger delay: 20

 
 

TimingRun_005:

Trigger delay: 17

 

TimingRun_005:

Trigger delay: 14
Trigger chip delay: 110

 

 

 

  33   Tue Nov 18 20:26:12 2014 Hao YinBelle SVDHardwareRun_001  Tue Nov 18 18:21:50 CET 2014 Unknown

At room temperature

Latest ADC scan and FIR run.

Latest CAL.

 

Position: 0.0, see elog entry.

  27   Tue Nov 18 10:26:56 2014 Hao YinBelle SVDCalibrationRun_003  Tue Nov 18 10:26:52 CET 2014 Unknown

At room temperature

Latest delay and FIRRun 

  26   Tue Nov 18 10:12:25 2014 Hao YinBelle SVD6let PedestalRun_005 10000Tue Nov 18 10:11:45 CET 2014 Unknown

At room temperature

Latest delay, FIRRun002. 

Check for bad strips.

  25   Tue Nov 18 09:51:11 2014 Hao Yin CalibrationRun_002  Tue Nov 18 09:50:24 CET 2014 Unknown

At room temperature

PedestalRun004 

Latest delay settings and FIRRun

  24   Tue Nov 18 09:48:53 2014 Hao YinBelle SVDPedestalRun_004 10000Tue Nov 18 09:48:30 CET 2014 Unknown

At room temperature.

Old delay settings and FIRRun_002

 

  23   Tue Nov 18 09:45:59 2014 Hao Yin FIRRun_002002 Tue Nov 18 09:45:58 CET 2014 Unknown

New FIR run after reconecting to original setting. 

  21   Tue Nov 18 01:03:18 2014 Hao YinBelle SVDRemapped FADC inputs  Tue Nov 18 01:03:32 CET 2014 Unknown

We moved the second cable to the third connector on the FADC to match DESY testbeam conditions. 

  22   Tue Nov 18 01:05:04 2014 Hao YinBelle SVDPedestalRun_003  Tue Nov 18 01:03:32 CET 2014 Unknown

New pedestal run after switching the connectors.

At room temperature 

  20   Mon Nov 17 23:04:57 2014 Hao YinBelle SVDPedestalRun_002 10338Mon Nov 17 23:03:03 CET 2014 Unknown

Pedestal run at room temperature.

6 subevents. Noise reference run.

Delay as latest run.

 

Reference run for bad strips.

  17   Mon Nov 17 22:28:05 2014 Hao Yin CalibrationRun001 Mon Nov 17 22:27:07 CET 2014 Unknown

Noise file from run 001 

PedestalRun_001

FIRRun_001

At room temperature

See DelayRun_001

 

  18   Mon Nov 17 22:28:07 2014 Hao Yin CalibrationRun001 Mon Nov 17 22:27:07 CET 2014 Unknown

Noise file from run 001 

PedestalRun_001

FIRRun_001

At room temperature

See DelayRun_001

 

  19   Mon Nov 17 22:28:09 2014 Hao Yin CalibrationRun001 Mon Nov 17 22:27:07 CET 2014 Unknown

Noise file from run 001 

PedestalRun_001

FIRRun_001

At room temperature

See DelayRun_001

 

  16   Mon Nov 17 22:22:56 2014 Hao Yin PedestalRun_00100110000Mon Nov 17 22:22:41 CET 2014 Unknown

At room temperature.

 

  14   Mon Nov 17 22:21:41 2014 Hao Yin FIR run001 Mon Nov 17 22:08:29 CET 2014 Good

Excellent, brilliant run. 

  15   Mon Nov 17 22:21:50 2014 Hao Yin Bad APVs  Mon Nov 17 22:08:29 CET 2014 Unknown

List with bad APVs:


 

Crap:

 APV 5 L6-p Channel 23

 

Not working:

 L3-n APV 3

 

  13   Mon Nov 17 22:18:27 2014 Hao YinBelle SVDADC delay scan  Mon Nov 17 22:08:29 Unknown

L3-p: 18

L4-p: 36

L5-p: 33

L6-p: 39

 

L3-n: 18

L4-n: 36

L5-n: 36

L6-n: 35

  80   Fri Nov 21 19:05:27 2014 Hao YinBelle SVDFIRRun_004  Fri Nov 21 19:05:23 CET 2014 Unknown

New ADC delay scan. cooled, -25 temperature

 

  121   Sun Nov 23 18:26:54 2014 Markus FriedlBelle SVDHardwareRun0056060023.11.2014 18:24:3423.11.2014 Good

Hardware run, hitting APVs 2/3 on p-sides, 1/2 on n-sides

EUDAT telescope running with difference of 2 events

  119   Sun Nov 23 16:55:37 2014 Markus FriedlBelle SVDHardwareRun0046060023.11.2014 16:51:4923.11.2014 18:23:54Good

Hardware run, hitting APVs 1/2 on p-sides, 1/2 on n-sides

EUDAT telescope running with difference of 2 events

ELOG V3.1.5-fc6679b