Home
CMS Production
Clean room
MedAustron
HEPHY
testbeams
old
testbeam-rd50-desy-Oct2024
testbeam-RD50-DESY-Apr2024
testbeam-RD50-DESY-Jul2023
testbeam-RD50-CERN-Oct2022
testbeam-DESY-Oct2017
testbeam-DESY-April2017
testbeam-SPS2015
testbeam-SPS2014
testbeam-DESY14
testbeam-SPS12
testbeam-SPS11
testbeam-SPS10
testbeam-SPS09
testbeam-SPS08
LP-TPC
Belle/Infineon/AIDA testbeam at SPS in Nov 2014, Page 1 of 6
Not logged in
Find
|
Login
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Project --
common
Belle SVD
Infineon
AIDA
-- Data --
Unknown
Good
Crap
118 Entries
Goto page 1,
2
,
3
,
4
,
5
,
6
Next
All
ID
Date
Author
Project
Subject
Run Number
Events
StartTime
EndTime
Data
Text
32
Tue Nov 18 18:45:01 2014
Hao Yin
Belle SVD
Trigger Delay scan
Tue Nov 18 18:21:50 CET 2014
Unknown
At room temperature
First run was at: 23 (no track)
33
Tue Nov 18 20:26:12 2014
Hao Yin
Belle SVD
HardwareRun_001
Tue Nov 18 18:21:50 CET 2014
Unknown
At room temperature
Latest ADC scan and FIR run.
Latest CAL.
27
Tue Nov 18 10:26:56 2014
Hao Yin
Belle SVD
CalibrationRun_003
Tue Nov 18 10:26:52 CET 2014
Unknown
At room temperature
Latest delay and FIRRun
26
Tue Nov 18 10:12:25 2014
Hao Yin
Belle SVD
6let PedestalRun_005
10000
Tue Nov 18 10:11:45 CET 2014
Unknown
At room temperature
Latest delay, FIRRun002.
Check for bad strips.
25
Tue Nov 18 09:51:11 2014
Hao Yin
CalibrationRun_002
Tue Nov 18 09:50:24 CET 2014
Unknown
At room temperature
PedestalRun004
Latest delay settings and FIRRun
24
Tue Nov 18 09:48:53 2014
Hao Yin
Belle SVD
PedestalRun_004
10000
Tue Nov 18 09:48:30 CET 2014
Unknown
At room temperature.
Old delay settings and FIRRun_002
23
Tue Nov 18 09:45:59 2014
Hao Yin
FIRRun_002
002
Tue Nov 18 09:45:58 CET 2014
Unknown
New FIR run after reconecting to original
setting.
21
Tue Nov 18 01:03:18 2014
Hao Yin
Belle SVD
Remapped FADC inputs
Tue Nov 18 01:03:32 CET 2014
Unknown
We moved the second cable to the third
connector on the FADC to match DESY testbeam
conditions.
22
Tue Nov 18 01:05:04 2014
Hao Yin
Belle SVD
PedestalRun_003
Tue Nov 18 01:03:32 CET 2014
Unknown
New pedestal run after switching the connectors.
At room temperature
20
Mon Nov 17 23:04:57 2014
Hao Yin
Belle SVD
PedestalRun_002
10338
Mon Nov 17 23:03:03 CET 2014
Unknown
Pedestal run at room temperature.
6 subevents. Noise reference run.
Delay as latest run.
17
Mon Nov 17 22:28:05 2014
Hao Yin
CalibrationRun
001
Mon Nov 17 22:27:07 CET 2014
Unknown
Noise file from run 001
PedestalRun_001
FIRRun_001
18
Mon Nov 17 22:28:07 2014
Hao Yin
CalibrationRun
001
Mon Nov 17 22:27:07 CET 2014
Unknown
Noise file from run 001
PedestalRun_001
FIRRun_001
19
Mon Nov 17 22:28:09 2014
Hao Yin
CalibrationRun
001
Mon Nov 17 22:27:07 CET 2014
Unknown
Noise file from run 001
PedestalRun_001
FIRRun_001
16
Mon Nov 17 22:22:56 2014
Hao Yin
PedestalRun_001
001
10000
Mon Nov 17 22:22:41 CET 2014
Unknown
At room temperature.
14
Mon Nov 17 22:21:41 2014
Hao Yin
FIR run
001
Mon Nov 17 22:08:29 CET 2014
Good
Excellent, brilliant run.
15
Mon Nov 17 22:21:50 2014
Hao Yin
Bad APVs
Mon Nov 17 22:08:29 CET 2014
Unknown
List with bad APVs:
13
Mon Nov 17 22:18:27 2014
Hao Yin
Belle SVD
ADC delay scan
Mon Nov 17 22:08:29
Unknown
L3-p: 18
L4-p: 36
L5-p: 33
80
Fri Nov 21 19:05:27 2014
Hao Yin
Belle SVD
FIRRun_004
Fri Nov 21 19:05:23 CET 2014
Unknown
New ADC delay scan. cooled, -25 temperature
121
Sun Nov 23 18:26:54 2014
Markus Friedl
Belle SVD
HardwareRun
005
60600
23.11.2014 18:24:34
23.11.2014
Good
Hardware run, hitting APVs 2/3 on p-sides,
1/2 on n-sides
EUDAT telescope running with difference
119
Sun Nov 23 16:55:37 2014
Markus Friedl
Belle SVD
HardwareRun
004
60600
23.11.2014 16:51:49
23.11.2014 18:23:54
Good
Hardware run, hitting APVs 1/2 on p-sides,
1/2 on n-sides
EUDAT telescope running with difference
Goto page 1,
2
,
3
,
4
,
5
,
6
Next
All
ELOG V3.1.5-fc6679b