Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  Belle/Infineon/AIDA testbeam at SPS in Nov 2014, Page 1 of 6  Not logged in ELOG logo
Entry  Sat Nov 22 16:43:18 2014, Axel König, common, table, telescope and dut geometry , , , , , Unknown geometry_table.pdfgeometry_DUT.pdfgeometry_infineon_batch4.pdfgeometry_infineon_old.pdf

geometry files

Entry  Fri Nov 14 19:22:40 2014, Martin Kurz, common, ip addresses, portforwarding, wlan, , , , , Unknown 

WLAN Router:

SSID: Hephy

password: 20supersecret14

DHCP Range: 192.168.0.200 to 239

Netmask: /24

DNS Server: 192.168.0.254

Gateway: 192.168.0.254

external IP: 128.141.61.16 (für diverse Port Forwardings)

 

Manuell vergebene IP Adressen bitte unbedingt Martin Kurz mitteilen oder/und in der folgenden Tabelle eintragen! 

IP/MAC Zuweisung:

IP Machine/Name intern Port Forwarding (aussen)
192.168.0.10 SVD Kenwood  VNC(5900)  VNC(9000)
192.168.0.11 AIDA DAQ  VNC(5900)  VNC(9001)
192.168.0.12 TUX DAQ  VNC(5900), VNC(5901), SSH(22)  VNC(9009), VNC(9002), SSH(9003),
192.168.0.13 Belle XY Tisch    
192.168.0.14 TUXOA  SSH(22)  SSH(9004)
192.168.0.15 JTAG Server    
192.168.0.148 alixcool    
192.168.0.16 slowcontrol  VNC(5900)  VNC(9005)
192.168.0.144 CAEN Power supply    
192.168.0.17 zenpixelwiki  SSH(22), VNC(5900)  SSH(9006), VNC(9008)
192.168.0.18 TLU (pcx25042, XY)  VNC(5900)  VNC(9007)
192.168.0.240 NI GPIB - ENET / 1000    
192.168.0.150 Printserver  VNC(5900)  VNC(9010)
       
       

 

Admin Zugang Wlan Router:

IP: 192.168.0.254

Username: admin

password: Hephy2014

 

Entry  Fri Nov 14 19:52:12 2014, Thomas Bergauer, , important web pages, , , , , Unknown 

SPS Accelerator status:  http://op-webtools.web.cern.ch/op-webtools/vistar/vistars.php?usr=SPS1

general Information about the Beam line(s): http://sba.web.cern.ch/sba/

Entry  Thu Nov 20 17:16:56 2014, Axel König, common, how to run the EUDAQ offline monitor, , , , , Unknown 

YOU need

1.) Folder EUDAQ OFFLINE Monitor

2.) ROOT

 

Starting: 

1.) open command line and chose the path where OfflineMonitor is

2.)Type -i "patch of raw file" -o test.root 100

3.) helpfile typing -h

Entry  Fri Nov 21 23:33:54 2014, Axel König, AIDA, hardware run (PC crashed), AIDA_run008, ---, , , Unknown 

22:00 SVD3 PC crashed!!! data will be collected. 

Entry  Tue Nov 18 13:13:53 2014, Thomas Bergauer, Infineon, hardware run, infineon_run001, 225508, , , Unknown 

Infineon new stack - batch 4

single hit
 
HV=300V, total I = 4.2475 µA
 
strips horizontal
 
data file in L:\cern14\infineon\Infineon Run horiz
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg
 
 
STOPPED by main User in H6B (18:11, 15:00)
 
Events: 225508
Next step: rearange modules vertically
 
Entry  Tue Nov 18 18:33:31 2014, Axel König, Infineon, hardware run, Infineon_run003, 300000, , , Unknown 

Infineon new stack - batch 4

single hit

HV=300V, total I = 4.0044 µA

strips vertical

Table Position: H: 96mm V: 101mm

data file in L:\cern14\infineon\Infineon Run vert

config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg

 

--Stopped 18.11 / 20:20---

Reason: Enough events, adjusting new DUT position for next run

Events: 300000

Entry  Tue Nov 18 23:04:34 2014, Axel König, Infineon, hardware run, Infineon_run004, 400000, , , Unknown 

Infineon new stack - batch 4 

single hit
 
HV=300V, total I = 4.0044 µA
 
strips vertical
 
Table Position: H: 96mm V: 81mm
 
data file in L:\cern14\infineon\Infineon Run vert
 
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg
 
--stopped 18.11 // 23:05---
Reason: Enough events, next run with the same position but now multi six
Events: 400000
 
Entry  Wed Nov 19 00:58:27 2014, Axel König, Infineon, hardware run, Infineon_run005, 87000, , , Unknown 

Infineon new stack - batch 4 

multi hit
 
HV=300V, total I = 4.0200 µA
 
strips vertical
 
Table Position: H: 96mm V: 81mm
 
data file in L:\cern14\infineon\Infineon Run vert
 
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_multi6.cfg
 
--stopped 19.11 // 01:00 --
Reason: Enough events, new dut postion for next multi run
Events: 87000
Entry  Wed Nov 19 09:26:39 2014, Axel König, Infineon, hardware run, Infineon_run006, 1500, , , Unknown 

Infineon new stack - batch 4

multi hit
 
HV=300V, total I = 4.0200 µA
 
strips vertical
 
Table Position: H: 96mm V: 91mm
 
data file in L:\cern14\infineon\Infineon Run vert
 
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_multi6.cfg
 
-- stopped --
1500 Events only --> no trigger signals from TU (01:30 Uhr)
Entry  Wed Nov 19 21:56:44 2014, Axel König, Infineon, hardware run, Infineon_run008, 244167, , , Unknown 

Infineon new stack - batch 4 

single hit
 
HV=300V, total I = 4.0758 µA
 
strips vertical
 
Table Position: H: 92.5mm V: 81mm
 
data file in L:\cern14\infineon\Infineon Run vert
 
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg
 
--stopped 19.11 // 21:53 --
Reason: Want to run the eudaq for the next run
Events: 244167
Entry  Wed Nov 19 22:15:41 2014, Axel König, Infineon, hardware run, Infineon_run010, 1498709, , , Unknown 

Infineon new stack - batch 4 

 
single hit
 
HV=300V, total I = 4.0200 µA
 
strips vertical
 
Table Position: H: 92.5mm V: 81mm
 
EUDAQ data: Run951 and Run952
 
data file in L:\cern14\infineon\Infineon Run vert
 
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_multi6.cfg
 
-- stopped 20.11 / 09:35-- 
 
SVD3DAQ Events: 1498709
EUDAQ Events: 2777
 
EUDAQ stopped counting events --> log entry: "01:38 6-ERROR unexpected trigger number 277714 (expecting 277713)" (TLU Producer)
Entry  Thu Nov 20 15:46:21 2014, Axel König, Infineon, hardware run, Infineon_run012, 263470, , , Unknown 

Infineon new stack - batch 4 

single hit
 
HV=300V, total I = ? µA
 
strips vertical
 
Table Position: H: 89mm V: 81mm
 
data file in L:\cern14\infineon\Infineon Run vert
 
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg
 
--stopped 20.11 // 15:30 --
Eudaq: No Events build --> searching for failure
Events: 263470
Entry  Thu Nov 20 15:47:56 2014, Axel König, Infineon, hardware run, Infineon_run011, , , , Unknown 

 Infineon new stack - batch 4 

 faulty!!!
Entry  Thu Nov 20 18:15:48 2014, Axel König, Infineon, hardware run, Infineon_run013_voltage, 51273, , , Unknown 

Infineon new stack - batch 4 

single hit + eudaq
 
HV=100V, total I = 3.0326 µA
 
strips vertical
 
Table Position: H: 89mm V: 81mm
 
data file in L:\cern14\infineon\Infineon Run vert
 
config file l:\cern14\infineon\Infineon Run horiz\cern14_infineon_single.cfg
 
eudaq file: run000959.raw
 
--stopped 20.11 // 18:10 --
Eudaq: 54928
Events: 51273
Entry  Fri Nov 21 11:10:08 2014, Axel König, AIDA, hardware run, AIDA_run002, 211362, , , Unknown 

AIDA

multi hit
Voltage=100V, I=4.1688uA
(new table calibration): V:56mm, H:96mm
 
EUDAQ File: Run000962, Run000963, Run000964
 
config: L:\cern14\AIDA
data: L:\cern14\AIDA
 
--Stopped 21.11 / 10:30--
DaqEvents: 211362
EUDAQ EVENTS: ca. 41000
Entry  Fri Nov 21 12:14:46 2014, Axel König, AIDA, hardware run, AIDA_run003, 20617, , , Unknown 

AIDA

 

single hit

Voltage=100V, I=5.4240uA

(new table calibration): V:66mm, H:74mm

EUDAQ file:  Run000965

config: L:\cern14\AIDA

data: L:\cern14\AIDA

 

--Stopped 21.11 / 12:12--

DaqEvents: 20617 (-600 ped)

EUDAQ EVENTS: 20019 (2 more than DAQ [+2 offset]) 

Entry  Fri Nov 21 15:37:30 2014, Axel König, AIDA, hardware run, AIDA_run004, 7057, , , Unknown 

AIDA

 

single hit

Voltage=100V, I=5.4357uA

(new table calibration): V:71mm, H:80mm

 

config: L:\cern14\AIDA

data: L:\cern14\AIDA

EUDAQ File: Run000977

--Stopped 21.11 / 12:12--

DaqEvents: 7057 (-600 ped)

EUDAQ EVENTS: 4658 (less than Daq) 

Entry  Fri Nov 21 18:20:47 2014, Axel König, AIDA, hardware run, AIDA_run005, 20045, , , Unknown 

AIDA

single hit

Voltage=100V, I=5.4357uA

(new table calibration): V:71mm, H:80mm

config: L:\cern14\AIDA

data: L:\cern14\AIDA

EUDAQ File: Run000979

--Stopped 21.11 / 12:12--

DaqEvents: 20045 (-600 ped)

EUDAQ EVENTS: ~18k

Entry  Fri Nov 21 18:21:45 2014, Axel König, AIDA, hardware run, AIDA_run006, ~1k, , , Unknown 

 verwerfen!

ELOG V3.1.5-fc6679b