54
|
Tue Oct 23 15:55:58 2012 |
Markus Friedl | MicronOrigami_gross | cal | cal026 | 83800 | 23.10.2012 14:56:47 | 23.10.2012 15:42:17 | Good | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-10V, Ibias=36uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1 |
55
|
Tue Oct 23 16:06:09 2012 |
Markus Friedl | MicronOrigami_gross | run | run026 | 102124 | 23.10.2012 16:04:47 | 23.10.2012 23:04:56 | Unknown | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-10V, Ibias=36uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
SPS Status during whole run: Still problems with North Area steering. means that beam position was not stable. |
|
56
|
Tue Oct 23 23:12:03 2012 |
Thomas Bergauer | MicronOrigami_gross | run | run027 | 220847 | 23.10.2012 23:10:14 | 24.10.2012 08:19:51 | Unknown | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
SPS Status during whole run: Still problems with North Area steering. means that beam position was not stable. |
57
|
Wed Oct 24 08:25:04 2012 |
Thomas Bergauer | MicronOrigami_gross | cal | cal027 | 83800 | 24.10.2012 08:22:25 | 24.10.2012 09:10:19 | Unknown | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-5V, Ibias=23.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1 |
58
|
Wed Oct 24 09:51:41 2012 |
Thomas Bergauer | MicronOrigami_gross | cal | cal028 | 83800 | 24.10.2012 09:50:53 | 24.10.2012 10:39:43 | Unknown | Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-2.5V, Ibias=14.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1 |
59
|
Wed Oct 24 17:24:40 2012 |
Thomas Bergauer | MicronOrigami_gross | run ohne Strom ;-( | run028 | | | | Unknown |
Belle Stack 4: 2 DSSD -z, Origami #3, #1, wedge new #2
HV = +-2.5V, Ibias=14.5uA
Position: APVs #2, 7, 11, 15 | # 17/18, 21, 25, 29
= p: 2DSSD #2, Origami3 #3, Origami1 #3, wedgenew #3
= n: 2DSSD #1/2, Origami3 #1, Origami1 #1, wedgenew #1
NO DATATAKING BECAUSE OF POWER FAILURE AT NIM CRATE (counter finster, warum?). Georg schaut sich das an, sobald in der zone access ist.
Auch AnnekathrinPC ist nicht erreichbar.
|
63
|
Sat Oct 27 19:36:24 2012 |
Markus Friedl | MicronOrigami_gross | cal | cal031 | 83800 | 27.10.2012 19:59:50 | 27.10.2012 20:44:38 | Good | Belle stack 2 after irradiation
HV = +50V -50V
I = 112 µA
CO2 cooling |
64
|
Sat Oct 27 21:49:08 2012 |
Markus Friedl | MicronOrigami_gross | run | run031 | 150k | 27.10.2012 21:42:46 | 28.10.2012 02:35:55 (+1h due to winter time) | Good | Belle stack 2 after gamma irrdiation
HV = +50V -50 V
I = 102 uA
CO2 cooling
|
65
|
Sun Oct 28 02:51:49 2012 |
Markus Friedl | MicronOrigami_gross | run | run032 | 150k | 28.10.2012 02:47:24 | 28.10.2012 08:31:19 | Good | Belle stack 2 after gamma irradiation
HV = +50V -50V
I = 101 uA
Bias currents absolutely stable during the whole run.
CO2 cooling
hitting APV3 (n side) = wide side of wedge sensor |
66
|
Sun Oct 28 08:37:53 2012 |
Christian Irmler | MicronOrigami_gross | run | run033 | 66937 | 28.10.2012 08:33:42 | 28.10.2012 14:10:43 | Unknown | Belle stack 2 after gamma irradiation
HV = +50V -50V
I = 101 uA
CO2 cooling
hitting APV2 (n side) = center of wedge sensor
Temperatur sensors:
- T11: Origami #4 in
- T12: Origami #4 out
- T13: Origami #3 in (still wrong values!)
- T14: Origami #3 out
- T15: Wedge new 1 out
- T16: Wedge old out
- T17: Wedge new 1 cooling block
- T18: Wedge old cooling block
|
Attachment 1: temp_run33.JPG
| |
Attachment 2: temp_run33_2.JPG
| |
77
|
Tue Oct 30 17:24:01 2012 |
Markus Friedl | MicronOrigami_gross | cal | cal040 | 83800 | 30.10.2012 17:20:28 | 30.10.2012 17:54:09 | Unknown | Cooling for 2DSSD established after some struggle.
2DSSD fully read out with cooling
HV= +40 V -40 V I = 2 uA
Beam position: none
Positions of thermal sensors:
11 Kapillare Anfang
12 Kapillare Ende
13 ---
14 unmittelbar nach Kapillare
15 Origami in
16 Origami out
17 Origami -z
18 Origami CE
Strip order:
n-Seite: rechts (Salev) nach links (Jura)
p-Seite: oben nach unten
APV chips with lower noise:
-z ce
p-side #5 #10 (= pos 4)
n-side #13 (= pos1) #19 (= pos 3)
|
78
|
Tue Oct 30 18:35:51 2012 |
Christian Irmler | MicronOrigami_gross | run | run040 | 100k | 30.10.2012 18:23:21 | 30.10.2012 21:55:53 | Unknown | Cooling for 2DSSD established after some struggle.
2DSSD fully read out with cooling
HV= +40 V -40 V I = 2.1 uA
Beam position:
Origami -z
p-side: APV #5
n-side: APV #13 (= pos.1 of -z)
Positions of thermal sensors:
11 Kapillare Anfang
12 Kapillare Ende
13 ---
14 unmittelbar nach Kapillare
15 Origami in
16 Origami out
17 Origami -z
18 Origami CE
Strip order:
n-Seite: rechts (Salev) nach links (Jura)
p-Seite: oben nach unten
APV chips with lower noise:
-z ce
p-side #5 #10 (= pos 4)
n-side #13 (= pos1) #19 (= pos 3) |
Attachment 1: temperatures_run040.jpg
| |
79
|
Tue Oct 30 22:15:41 2012 |
Markus Friedl | MicronOrigami_gross | run | run041 | 100k | 30.10.2012 22:09:13 | | Unknown | Cooling for 2DSSD established after some struggle.
2DSSD fully read out with cooling
HV= +40 V -40 V I = 1.84 uA
Beam position:
Origami ce:
p-side: APV #10 (= pos 4)
n-side: APV #19 (= pos 3)
Positions of thermal sensors:
11 Kapillare Anfang
12 Kapillare Ende
13 ---
14 unmittelbar nach Kapillare
15 Origami in
16 Origami out
17 Origami -z
18 Origami CE
Strip order:
n-Seite: rechts (Salev) nach links (Jura)
p-Seite: oben nach unten
APV chips with lower noise:
-z ce
p-side #5 #10 (= pos 4)
n-side #13 (= pos1) #19 (= pos 3)
|
Attachment 1: temperatures_run041.jpg
| |
1
|
Fri Oct 12 15:04:55 2012 |
Marko Dragicevic | common | Network configuration | | | | | Unknown | Router:
IP 137.138.113.230
Hostname ROUTERHEPHY.cern.ch
connected on outlet 0887-1:4602/02
Devices
DAQPC: 192.168.0.36
Slowcontrol (REINRAUMLAPTOP): 192.168.0.37
AnneKathrinPC (AOH): 192.168.0.40
GPIB->Ethernet: 192.168.0.240
Coolingbox: 192.168.0.148
XY Table: 192.168.0.13
VAIO (CONF1): 192.168.0.42
BeamControl: 137.138.113.210 CWO-HNA447-H6A.CERN.CH
VMheros am DAQPC: 192.168.0.47
Port Forwards:
DAQPC (192.168.0.36): 5901
Slowcontrol (192.168.0.37): 5902
AnneKathrinPC (192.168.0.40): 5903
VAIO (CONF1) (192.168.0.42): 5904
VMheros am DAQPC (192.168.0.47): 5022
Comments:
Remote Control von CESAR:
$ x11vnc -bg -forever |
5
|
Fri Oct 12 23:51:35 2012 |
Markus Friedl | common | Zimmernummer & Telefonnummern | | | | | Unknown | 2nd week:
Markus: 38 - 420 (phone: 70 420)
Thomas: 38 - 431 (phone: 70 431)
Chrisu: 38 - 428 (phone: 70 428)
Manni: 38 - 434 (phone: 70 434)
1st week:
Markus: 41 - 130 (phone: 60 130)
Annekathrin: 41 - 206 (phone: 60 206)
Thomas: 39 - 108 (phone: 79 108)
Chrisu: 41 - 224 (phone: 60 224)
Manni: 39 - 317 (phone: 79 317)
Marko: 39 - 206 (phone: 79 206)
HEPHYs CERN Handy: 162471
Bat. 887 HNA-451: C3568Y
Bat. 887 HNA-447: 12345 (westseitige Tür) |
6
|
Fri Oct 12 23:52:57 2012 |
Markus Friedl | common | Sozialisierung | | | | | Unknown | Prost, Bergi!
(Das ist nur ein Test, ob du wirklich all die Elog-Emails liest.) |
21
|
Mon Oct 15 19:21:56 2012 |
Marko Dragicevic | common | Beam settings and profile | | | | | Unknown | Beam setting file:
H6A.804: FM HAD (H8=+180, H6=120@0mrad) PARALL IN H6A; RD42
Kommentar (Marko):
Das alte Beam Setting File war optimiert fuer H6B, sprich der Beam Focus war dort. Dieses Setting ist neuer und hat den Focus in H6B. |
Attachment 1: NetBeans_IDE_3.5_15-Oct-12_19-28-32.png
| |
30
|
Tue Oct 16 23:03:09 2012 |
Markus Friedl | common | Sozialisierung | | | | | Unknown | So steuert man einen Testbeam!
|
Attachment 1: IMAG2041.jpg
| |
36
|
Thu Oct 18 09:14:07 2012 |
Manfred Valentan | common | Fahrt nach Mol | | | | | Unknown | Liebe Kollegen,
wir brechen. auf. Wünscht uns Glück! |
80
|
Wed Oct 31 15:54:59 2012 |
Christian Irmler | common | Ethernetkabel zu H6A | | | | | Unknown | Ethernetkabel HNA447 -> H6A:
Das obere Ende im Counting Hut liegt im Zwischenboden unterhalb der orangenen Steckdose beim Eingang mit dem elektronischen Zahlenschloß.
Das untere Ende in der Zone hängt aufgerollt an einem Pfeiler der Kabeltasse, unweit der Stelle an der das Kabel von oben hinunter gelassen wurden. Das ist ewta dort wo die Stiege zu PPE146 endet.
siehe Fotos :) |
Attachment 1: 2012-10-31_15.47.42.jpg
| |
Attachment 2: 2012-10-31_12.28.32.jpg
| |
|