  49   Sat Oct 8 09:30:44 2011 Christian IrmlerBELLECooling plant tests  08.10.2011 09:30 Unknown

Software run with 6 samples to ensure that APV chips dissipate full power.

DAQ data not saved, bias current monitored

new longterm files:
It-neg-0810110926.txt
It-pos-0810110926.txt

Attachment 1: biascurrent_cooling_test1.jpg
biascurrent_cooling_test1.jpg
Attachment 2: temp_cooling_test1.jpg
temp_cooling_test1.jpg
  58   Sun Oct 9 11:28:30 2011 Manfred ValentanHPKHPK BSTD stack configuration    Unknown

Module order:

BSTD1-N
BSTD2-N

BADD1-N (for z information)

BSTD1-P
BSTD1-Y

BSTD2-P
BSTD2-Y

Talk from Marko on Testbeam with HPK Double Metal Sensors

Attachment 1: IMG_5058.JPG
IMG_5058.JPG
Attachment 2: IMG_5069.JPG
IMG_5069.JPG
  59   Sun Oct 9 11:31:43 2011 Manfred ValentanHPKHPK BADD stack configuration    Unknown

Module order:

BADD1-N
BADD2-N

BSTD1-N (for z information)

BADD1-P
BADD1-Y

BADD2-P
BADD2-Y

Talk from Marko on Testbeam with HPK Double Metal Sensors

Attachment 1: IMG_5097.JPG
IMG_5097.JPG
  64   Mon Oct 10 12:16:06 2011 Marko DragiceviccommonBeam Profile and Magnet BeamRef Settings     Unknown

Beam Profile from H6A, 10.10.2011 11:40

BeamRef settings for all magnets, File H6B.702

Attachment 1: BeamProfile.png
BeamProfile.png
Attachment 2: MagentBeamRefs.png
MagentBeamRefs.png
  65   Mon Oct 10 12:32:42 2011 Manfred ValentanCNMCNM stack configuration    Unknown

Module order:

CNM-V1 (draws a lot of current, gives only low signal)
BSTD1-N (for height information)
CNM-V2 (works fine)
 

Attatchment 1: Stack config, beam from right. In the box the stack is mounted with the labelled side of the BSTD1-N module on top (90deg rotated w.r.t. photo)

Attachment 2: the top edges of the sensors coincide -> when the beam hits the last strips of the BSTD, it also hits the pitch adapter region of the CNM sensors

Attachment 1: IMG_5102.JPG
IMG_5102.JPG
Attachment 2: IMG_5092.JPG
IMG_5092.JPG
  70   Thu Oct 13 13:08:38 2011 Thomas Bergauercommonend of success    Unknown
  71   Thu Oct 20 11:49:14 2011 Markus FriedlcommonScintillator dimensions    Good
Attachment 1: bhihagag.jpg