Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 3 of 5  Not logged in ELOG logo
ID Date Author Project Subjectdown Run Number Events StartTime EndTime Data
  80   Wed Feb 22 17:25:34 2012 Christian IrmlerBELLEOrigami Module #4cal1058380022.02.2012 17:23:13 22.02.2012 17:34:27Good

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_single_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 1 0 0

J7... HV ret @ hybrid

Same as cal104, but now J7 open

 

  81   Wed Feb 22 17:38:29 2012 Christian IrmlerBELLEOrigami Module #4run105100k22.02.2012 17:39:10 22.02.2012 17:58:01Good

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 1 0 0

J7... HV ret @ hybrid

Same as run104, but now J7 open

Again spikes in bias current!

 

Attachment 1: run105.jpg
run105.jpg
  82   Wed Feb 22 18:10:29 2012 Christian IrmlerBELLEOrigami Module #4run10650k22.02.2012 17:39:10 22.02.2012 18:23:47Good

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 0 0 0

J7... HV ret @ hybrid

Same as run105, but now J5 and J7 open

 

Attachment 1: run106.jpg
run106.jpg
  83   Wed Feb 22 18:32:24 2012 Christian IrmlerBELLEOrigami Module #4run10750k22.02.2012 18:30:3322.02.2012 18:40:11Good

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 0 0 1

J7... HV ret @ hybrid

Same as run106, but now J7 closed

APV pedestals slightly unstable.

Attachment 1: run107_apv5_raw_data.jpg
run107_apv5_raw_data.jpg
Attachment 2: run107.jpg
run107.jpg
  84   Mon Mar 5 17:34:43 2012 Christian IrmlerBELLEOrigami Module #4run108100k 05.03.2012 16:24:12Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 0 1

J7... HV ret @ hybrid

  85   Mon Mar 5 17:35:31 2012 Christian IrmlerBELLEOrigami Module #4cal1088380005.03.2012 16:47:5105.03.2012 17:05:16Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 0 1

J7... HV ret @ hybrid

Attachment 1: run108-109.jpg
run108-109.jpg
  86   Mon Mar 5 17:36:46 2012 Christian IrmlerBELLEOrigami Module #4run109100k05.03.2012 17:36:19 05.03.2012 17:55:24 Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 1

J7... HV ret @ hybrid

  87   Mon Mar 5 18:08:02 2012 Christian IrmlerBELLEOrigami Module #4cal1098380005.03.2012 18:07:4005.03.2012 18:18:32Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 1

J7... HV ret @ hybrid

  88   Mon Mar 5 18:41:23 2012 Christian IrmlerBELLEOrigami Module #4run110100k05.03.2012 18:45:2105.03.2012 19:04:30Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

  89   Mon Mar 5 19:06:41 2012 Christian IrmlerBELLEOrigami Module #4cal1108380005.03.2012 19:05:5205.03.2012 19:17:01Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

  90   Mon Mar 5 19:27:56 2012 Christian IrmlerBELLEOrigami Module #4run11150k05.03.2012 19:26:28 Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,30µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 0 1

J7... HV ret @ hybrid

 

same as run108
Noise of p-side APVs in run108 was very high --> repeat measurement!

  91   Wed Mar 7 15:12:42 2012 Christian IrmlerBELLEOrigami Module #4run112100k07.03.2012 15:13:18 07.03.2012 14:31:07Unknown

Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-19,6°C, Tout=-21.3°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

  92   Wed Mar 7 15:44:25 2012 Christian IrmlerBELLEOrigami Module #4cal1128380007.03.2012 15:42:53 Unknown

Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-19,6°C, Tout=-21.3°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_single_cooled.cfg

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

  93   Wed Mar 7 16:03:30 2012 Christian IrmlerBELLEOrigami Module #4run113100k07.03.2012 16:07:3407.03.2012 16:30:48 Unknown

Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-19,6°C, Tout=-21.3°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

same configuration as run112 but now the step motors of the xz table are powered.

Attachment 1: run112-113.jpg
run112-113.jpg
  94   Wed Mar 7 16:58:36 2012 Christian IrmlerBELLEOrigami Module #4cal113100k07.03.2012 16:40:04 07.03.2012 16:57:08Unknown

Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-19,6°C, Tout=-21.3°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_single_cooled.cfg

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

same configuration as run112 but now the step motors of the xz table are powered.

  13   Mon Sep 19 17:41:27 2011 Manfred ValentanMicronModule SPRAY-I-2     

Sensor: B2Micron_2825_15_Baby3

p-stop: p-spray WITH intermediate strips

Hybrid p-side: H43 (reused from last year)
Hybrid n-side: MB7

  15   Mon Sep 19 17:42:39 2011 Manfred ValentanMicronModule SPRAY-I-1     

Sensor: B2Micron_2825_15_Baby2

p-stop: p-spray WITH intermediate strips

Hybrid p-side: MB1
Hybrid n-side: MB9

  12   Mon Sep 19 17:40:47 2011 Manfred ValentanMicronModule SPRAY-2     

Sensor: B2Micron_2825_05_Baby4

p-stop: p-spray WITHOUT intermediate strips

Hybrid p-side: H44 (reused from last year)
Hybrid n-side: MB6

  14   Mon Sep 19 17:42:01 2011 Manfred ValentanMicronModule SPRAY-1     

Sensor: B2Micron_2825_05_Baby3

p-stop: p-spray WITHOUT intermediate strips

Hybrid p-side: H32 (reused from last year)
Hybrid n-side: MB8

  20   Mon Sep 19 17:47:50 2011 Manfred ValentanMicronModule COMM-IRRAD     

Sensor: B2Micron_2826_07_Baby2 (reused from last year, was DUT3, module is irradiated to 700 kGy)

p-stop: Common, with intermediate strips, irradiated

Hybrid p-side: H41
Hybrid n-side: M31

ELOG V3.1.5-fc6679b