Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 5 of 5  Not logged in ELOG logo
ID Date Author Project Subject Run Number Eventsup StartTime EndTime Data
  79   Wed Feb 22 16:49:29 2012 Christian IrmlerBELLEOrigami Module #4cal1048380022.02.2012 16:51:1322.02.2012 17:02:11Good

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 1 0 1

J7... HV ret @ hybrid

 

  80   Wed Feb 22 17:25:34 2012 Christian IrmlerBELLEOrigami Module #4cal1058380022.02.2012 17:23:13 22.02.2012 17:34:27Good

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips --> same as used in run010

e:\cvi-projects\apvdaq_fadc\origami6_V2_single_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 1 1 0 0

J7... HV ret @ hybrid

Same as cal104, but now J7 open

 

  85   Mon Mar 5 17:35:31 2012 Christian IrmlerBELLEOrigami Module #4cal1088380005.03.2012 16:47:5105.03.2012 17:05:16Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 0 1

J7... HV ret @ hybrid

Attachment 1: run108-109.jpg
run108-109.jpg
  87   Mon Mar 5 18:08:02 2012 Christian IrmlerBELLEOrigami Module #4cal1098380005.03.2012 18:07:4005.03.2012 18:18:32Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 1

J7... HV ret @ hybrid

  89   Mon Mar 5 19:06:41 2012 Christian IrmlerBELLEOrigami Module #4cal1108380005.03.2012 19:05:5205.03.2012 19:17:01Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

  92   Wed Mar 7 15:44:25 2012 Christian IrmlerBELLEOrigami Module #4cal1128380007.03.2012 15:42:53 Unknown

Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-19,6°C, Tout=-21.3°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_single_cooled.cfg

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

  47   Fri Oct 7 19:35:14 2011 Christian IrmlerBELLEOrigami stack cooledrun01490k07.10.2011 19:49:2607.10.2011 23:26:52Good

Origami6
HV=+-40V,
CO2 cooling: P_TT_4: 14.9 bar, mf=0.9 g/s
beam on; xy table position x=306 y=74.5

centered

I=17.8µA; old I2C settings; corrected trigger delay (htr); adjusted front-end voltages 

CO2 pressure reduced to 14.9 bar --> temp is about 4K colder
Temp. at pipe inlet (K7) = -18°C
Temp. at pipe outlet (K8) = -21.8°C

currents:

07.10.2011  23:26:21  event=89786  rate=0events/s temp/curr=33.0/-05.3 33.0/-05.8 33.0/-06.6 31.9/001.4 32.0/001.9 31.9/017.7
 

ELOG V3.1.5-fc6679b