Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-rd50-desy-Oct2024 testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS October 2011, Page 1 of 5  Not logged in ELOG logo
ID Date Author Project Subject Run Number Events StartTime EndTime Datadown
  45   Fri Oct 7 18:28:53 2011 Christian Irmlercommonrun schedule    Unknown
Attachment 1: run_schedule.pdf
Attachment 2: run_schedule.xlsx
  49   Sat Oct 8 09:30:44 2011 Christian IrmlerBELLECooling plant tests  08.10.2011 09:30 Unknown

Software run with 6 samples to ensure that APV chips dissipate full power.

DAQ data not saved, bias current monitored

new longterm files:
It-neg-0810110926.txt
It-pos-0810110926.txt

Attachment 1: biascurrent_cooling_test1.jpg
biascurrent_cooling_test1.jpg
Attachment 2: temp_cooling_test1.jpg
temp_cooling_test1.jpg
  58   Sun Oct 9 11:28:30 2011 Manfred ValentanHPKHPK BSTD stack configuration    Unknown

Module order:

BSTD1-N
BSTD2-N

BADD1-N (for z information)

BSTD1-P
BSTD1-Y

BSTD2-P
BSTD2-Y

Talk from Marko on Testbeam with HPK Double Metal Sensors

Attachment 1: IMG_5058.JPG
IMG_5058.JPG
Attachment 2: IMG_5069.JPG
IMG_5069.JPG
  59   Sun Oct 9 11:31:43 2011 Manfred ValentanHPKHPK BADD stack configuration    Unknown

Module order:

BADD1-N
BADD2-N

BSTD1-N (for z information)

BADD1-P
BADD1-Y

BADD2-P
BADD2-Y

Talk from Marko on Testbeam with HPK Double Metal Sensors

Attachment 1: IMG_5097.JPG
IMG_5097.JPG
  62   Mon Oct 10 10:37:52 2011 Christian IrmlerCNMCNM stackcal0128380010.10.2011 11:29:5510.10.2011 11:40:55Unknown

no cooling
beam on; xy table position x=330  y=64
HV_CNM=20V, HV_BSTD1=200V
Istart_CNM= 28 / 1 uA;  Istart_BSTD= 0.12 uA

  64   Mon Oct 10 12:16:06 2011 Marko DragiceviccommonBeam Profile and Magnet BeamRef Settings     Unknown

Beam Profile from H6A, 10.10.2011 11:40

BeamRef settings for all magnets, File H6B.702

Attachment 1: BeamProfile.png
BeamProfile.png
Attachment 2: MagentBeamRefs.png
MagentBeamRefs.png
  65   Mon Oct 10 12:32:42 2011 Manfred ValentanCNMCNM stack configuration    Unknown

Module order:

CNM-V1 (draws a lot of current, gives only low signal)
BSTD1-N (for height information)
CNM-V2 (works fine)
 

Attatchment 1: Stack config, beam from right. In the box the stack is mounted with the labelled side of the BSTD1-N module on top (90deg rotated w.r.t. photo)

Attachment 2: the top edges of the sensors coincide -> when the beam hits the last strips of the BSTD, it also hits the pitch adapter region of the CNM sensors

Attachment 1: IMG_5102.JPG
IMG_5102.JPG
Attachment 2: IMG_5092.JPG
IMG_5092.JPG
  68   Mon Oct 10 21:54:24 2011 Marko DragicevicMicronMicron-Baby-Stack p-spray, run bottom rightrun027700k10.10.2011 22:40:3111.10.2011 09:49:11Unknown

hit modules in bottom left corner -> Zones narrow and half-narrow for COMB_IRRAD, Zones wide and half-wide for COMM_IRRAD
timing corrected w.r.t. run004

Position of HEPHY x-z-table:
x = 322
z = 70

Note: z-Position not identical with position of run004, x-z-table seemed to have moved vertically. This configuration now hits the same sensor position.

  69   Mon Oct 10 21:55:30 2011 Marko DragicevicMicronInternal Calibrationcal0138380010.10.2011 21:52:32 Unknown

micronbaby p-spray/irrad
HV = -100V
beam on, baseline of irrad APV reduced

APV #2 (I²C addr. 40) deactivated, latency error after initialization, reset line is open

  70   Thu Oct 13 13:08:38 2011 Thomas Bergauercommonend of success    Unknown
  84   Mon Mar 5 17:34:43 2012 Christian IrmlerBELLEOrigami Module #4run108100k 05.03.2012 16:24:12Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 0 1

J7... HV ret @ hybrid

  85   Mon Mar 5 17:35:31 2012 Christian IrmlerBELLEOrigami Module #4cal1088380005.03.2012 16:47:5105.03.2012 17:05:16Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 0 1

J7... HV ret @ hybrid

Attachment 1: run108-109.jpg
run108-109.jpg
  86   Mon Mar 5 17:36:46 2012 Christian IrmlerBELLEOrigami Module #4run109100k05.03.2012 17:36:19 05.03.2012 17:55:24 Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 1

J7... HV ret @ hybrid

  87   Mon Mar 5 18:08:02 2012 Christian IrmlerBELLEOrigami Module #4cal1098380005.03.2012 18:07:4005.03.2012 18:18:32Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 1

J7... HV ret @ hybrid

  88   Mon Mar 5 18:41:23 2012 Christian IrmlerBELLEOrigami Module #4run110100k05.03.2012 18:45:2105.03.2012 19:04:30Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

  89   Mon Mar 5 19:06:41 2012 Christian IrmlerBELLEOrigami Module #4cal1108380005.03.2012 19:05:5205.03.2012 19:17:01Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,9µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

  90   Mon Mar 5 19:27:56 2012 Christian IrmlerBELLEOrigami Module #4run11150k05.03.2012 19:26:28 Unknown

Sr90, large scintillator,
Origami Mod. #4
HV=+-40V, Ibias=1,30µA
CO2 cooling on, Tin=-20.5°C, Tout=-21.5°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

Lab measurement with new dark box but old, large scintillator

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 0 1

J7... HV ret @ hybrid

 

same as run108
Noise of p-side APVs in run108 was very high --> repeat measurement!

  91   Wed Mar 7 15:12:42 2012 Christian IrmlerBELLEOrigami Module #4run112100k07.03.2012 15:13:18 07.03.2012 14:31:07Unknown

Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-19,6°C, Tout=-21.3°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

  92   Wed Mar 7 15:44:25 2012 Christian IrmlerBELLEOrigami Module #4cal1128380007.03.2012 15:42:53 Unknown

Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-19,6°C, Tout=-21.3°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_single_cooled.cfg

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

  93   Wed Mar 7 16:03:30 2012 Christian IrmlerBELLEOrigami Module #4run113100k07.03.2012 16:07:3407.03.2012 16:30:48 Unknown

Sr90, small (new) scintillator, new trigger unit
Origami Mod. #4
HV=+-40V, Ibias=1,6µA
CO2 cooling on, Tin=-19,6°C, Tout=-21.3°C

I²C settings for cooled APV chips

e:\cvi-projects\apvdaq_fadc\origami6_V2_multi6_cooled.cfg

SMU:  +HV=Inv.Nr. 545-77    -HV=Inv.Nr. 540-702

HVret configuration:

0 ... switch open / not connected
1 ... switch closed / connected
 

SMU Dock Box J5 J6 J7
0 0 (now isolated) 1 1 0

J7... HV ret @ hybrid

same configuration as run112 but now the step motors of the xz table are powered.

Attachment 1: run112-113.jpg
run112-113.jpg
ELOG V3.1.5-fc6679b