Home CMS Production Clean room MedAustron HEPHY testbeams old
testbeam-RD50-DESY-Apr2024 testbeam-RD50-DESY-Jul2023 testbeam-RD50-CERN-Oct2022 testbeam-DESY-Oct2017 testbeam-DESY-April2017 testbeam-SPS2015 testbeam-SPS2014 testbeam-DESY14 testbeam-SPS12 testbeam-SPS11 testbeam-SPS10 testbeam-SPS09 testbeam-SPS08 LP-TPC
  HEPHY logbook for testbeam at SPS September/October 2010, Page 8 of 8  Not logged in ELOG logo
ID Date Author Project Subject Run Numberup Events StartTime EndTime
  146   Thu May 19 09:44:39 2011 Manfred ValentanMicron BabyDUT3, source run, irrad, postzupfrun118100k19.05.2011 09:07:3319.05.2011 09:27:21

DUT3: B2Micron_2826_7_baby2 (common p-stop)
config file: D:/cern10/micronbaby/data_lab/DUT3/postzupf/micronbaby_multi6_irrad_postzupf.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=18.0µA
I_end=22.6µA

Every second bond zupfed

  148   Thu May 19 11:04:04 2011 Manfred ValentanMicron BabyDUT4, source run, irrad, postzupfrun119100k19.05.2011 10:08:1419.05.2011 10:29:02

DUT4: B2Micron_2826_19_baby4 (combined p-stop)
config file: D:/cern10/micronbaby/data_lab/DUT4/postzupf/micronbaby_multi6_irrad_postzupf.cfg

HV=+-50V
90Sr 1mCi ~centered
I_start=141µA
I_end=167µA

Every second bond zupfed...

  82   Mon Oct 4 21:01:25 2010 Christian IrmlerBELLErunrun433000004.10.2010 20:59:4804.10.2010 23:04:24

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

angle: 60°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: -52.5 (rotary table)

telescope run: 20149

  83   Mon Oct 4 23:12:16 2010 Manfred ValentanBELLErunrun443000004.10.2010 23:?:?04.10.2010 23.57.23

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

angle: 30°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: -22.5 (rotary table)

telescope run: 20150

  84   Mon Oct 4 23:59:05 2010 Manfred ValentanBELLErunrun45 04.10.2010 ??:??:??05.10.2010 00:56:48

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

angle: 45°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: -37.5 (rotary table)

telescope run: 20151

  85   Tue Oct 5 10:20:30 2010 Manfred ValentanBELLErunrun4635000005.10.2010 01:00:0005.10.2010 10:16:07

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

angle: 15°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: -7.5 (rotary table)

telescope run: 20152

  86   Tue Oct 5 10:23:09 2010 Manfred ValentanBELLErunrun473000005.10.2010 10:21:2005.10.2010

angle scan Origami 1 and  Micron wedge 1
HV = 100V
chiller set to 14°C

angle: 0°
axis 1: 92.4 (horizontal)
axis 2: 35 (vertical)
axis 3: +7.5 (rotary table)

telescope run: 20153

ELOG V3.1.5-fc6679b